February 15, 2019
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000321/2019410 AND 05000366/2019410
Dear Mr. McGavin:
On January 17, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Hatch Units 1, 2 and discussed the results of this inspection with Mr. T. Vehec and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Binoy B. Desai, Chief Plant Support Branch Division of Reactor Safety
Docket Nos.: 05000321 and 05000366 License Nos.: DPR-57 and NPF-5
Enclosure:
Inspection Report 05000321/2019410 and 05000366/2019410
Inspection Report
Docket Number(s):
05000321 and 05000366
License Number(s):
Report Number(s):
05000321/2019410 and 05000366/2019410
Enterprise Identifier: I-2019-410-0010
Licensee:
Southern Nuclear Operating Co., Inc.
Facility:
Hatch, Units 1 and 2
Location:
Birmingham, AL 35242
Inspection Dates:
January 14, 2019 to January 18, 2019
Inspectors:
J. Shehee, Branch Chief
Approved By:
Binoy B. Desai, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Security Reports Inspection at Hatch Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings were identified.
INSPECTION SCOPE
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES - BASELINE
71130.07 - Security Training
The inspectors evaluated the nuclear security training program. The following elements were evaluated from this IP dated August 23, 2018.
Security Training (1 Sample)
- Tier I: all requirements
- Tier II: all requirements
- Tier III: 6 requirements 02.10, 02.11(a), (b); 02.13 (a), (b), (c)
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 17, 2019, the inspector presented the inspection results to Mr. T. Vehec and other members of the licensee staff.
LIST OF
DOCUMENTS REVIEWED
PROCEDURES
NMP-SE-101, Miles Use and Safety, Version 2.2
NMP-SE-020-001, Security Training Program Committee Conduct of Operations, Version 1.1
NMP-SE-020-002, Graded Systematic Approach to Security Training, Version 2-1
NMP-SE-020-003, SNC Fleet Security Conduct of Training, Version 2.0
NMP-SE-020-004, Qualification Requirements for Security Positions, Version 2.3
CONDITION REPORTS
275498
1050328
10569701