. REPORT OF VENDOR INSPECTION i
!
RO VENDOR, INSPECTION REPORT NO. 50-363/ 73-07
. DOCKET NO. 05000363
> VENDOR:
Klein, Schanzlin & Becker -(KSB)
-LICENSE NO CPPR-96 i
ADDRESS:
Frankenthal, Germany PRIORITY
'
CATEGORY A
j
- -
I EQUIP >1ENT :
Reactor Coolant Pumps LICENSEE:
Jersey Central Power and' Light Company
'
LOCATION:
Parsippany, New Jersey (Forked River)
!
-
TYPE OF LICENSEE:
PWR-FM (e) 1070
.
TYPE OF INSPECTION: Vendor, Announced
--
DATE OF INSPECTION:
November 5-6, 1973
'
.
DATE OF PREVIOUS INSPECTION:
April 5-6, 1973 i
'
REPORTING INSPECTOR:
. ') s,
,__//,}
DATE:
'-
'
/t
-
Ross L. Brown, Reactor Inspector
,..
.
. ACC0!!PANYING INSPECTOR:
None DATE:
g, %
'
r
.
.'
OTHER !.cfmr1*:V ire. Pr: cm"r*
None id
"d
!
-
L
~
~ T,_
DATE:
?
'7 I
REVIEWED BY:
i J. H. Ti11ou..- Senior bD
't l
' ' "
-9604150111 960213
PDR FOIA-PDR e
i i
DEKOK95-258
,
,
,_
,
,
,
,
,
,
.
_
_
_
_.
-
'
_
_
_
.
DETAILS 1.
Persons Contacted Combustion Engineering J. L. VanFleet, Assistant' Project Engineer G. Brunetto, Quality Assurance Representative KSB E. Blocklinger, Manager Quality Assurance W. Stipp, Manager Quality Planning M. Dilly, Project Manager Quality Assurance F. Diebold, Project Manager P. Hoehne, Project Manager, USA 2.
General The testing of these pumps is scheduled to start in January 1974 and all four pumps are scheduled to be completed and ready for shipment in mid year 1974.
3.
Quality Assurance Manual Revision During the inspectors audit of DDR's, it was found that many of the reports were not clear in respect to stating the finzi resolution or close out action taken.
The KSB, Quality Assurance Department issued a DDR prior to comple-
,
tion of this audit that required the following corrective action.
a.
Conduct a 100% review of all DDR's to add the necessary reference i
i information regarding the closecut.
b.
Revise the DDR form shown in the Quality Assurance Manual so the required closeout information must be included and signed off.
c.
Revise the Quality Assurance Manual to include the instructions, authority and responsibility for completing the revised DDR Form.
j d.
Issue instructions that cover the same information as Item C for immediate shop use, prior to the Quality Assurance Manual section being approved by the ASME Code.
j i
This item will be audited during a subsequent vendor inspection.
l
'
,
i
$
,
.....
.
,
.
.
.
7.,
.,
- -,..
-5-i
!
- 4 '. Document Control
,
In:accordance with the Vendor Inspection Report-No. 999-72/73-01, l
Details, Paragrapn 4,,the inspector conducted an audit of'the implementation activities and records, which' appear to be satis-l
' factory and in accordance with the document control requirements.