Text
.
O
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-358/80-14 Docket No. 50-358 License No. CePR-88 Licensee: Cincinnati Gas and Electric Company 139 Erst 4th Street Cincinnati, OH 45201 Facility Name:
W. H. Zimmer Nuclear Power Station Inspection At:
W. H. Zimmer Site, Moscow, OH Inspection Conducted: June 2-6, 9, 10, 16-20, 23-26, 1980 1/39FC Inspector:
ante s
.
i
/
RF 4)&
Approved By:
R. F. Warnick, Chief 7/So/po
' '
Projects Section 2 Inspection Summary i
Inspection on June 2-6, 9, 10, 16-20, 23-26, 1980 (Report No. 50-358/80-14)
Areas Inspected: Routine announced inspection of noncompliances and unresolved items from previous inspections, Bulletin followup, Preoper-ational Testing Quality Assurance and plant tours.
The inspection involved 96 inspector man-hours by the NRC Senior Resident Inspector.
-Results: Of the four areas inspected, two were found satisfactory and in f
the area of Preoperational Testing Quality Assurance two examples of noncompliance were found.
(Infraction - 10 CFR 50, Appendix B, Criterion
,
XVI - Inadequate corrective action taken on Audit findings.) In the area of Plant Tours a noncompliance was identified. (Infraction - 10 CFR50, Appendix B, Criterion XVI - Inadequate corrective action to control weld rod.)
8009160514
.
-
.
..
.
A
'
DETAILS 1.
Personnel Contacted
- J. Schott, Plant Superintendent
- P. King, Assistant Plant Superintendent B. Culver, Construction Manager
- W.-Schwiers, Quality Assurance Manager B. Ehas, Senior Quality Assurance Engineer
- J. Wald, Quality Assurance Engineer G. Knox, Site Quality Control Administrator and others of the station staff.
- Denotes personnel attending monthly exit meeting.
2.
Licensee Action on Previously Identified Items (Closed) Noncompliance Item 50-358/80-08-01 The inspector verified the second inventory conducted April 29, 1980 incluced a verification of New Fuel Bundle serial numbers.
(Closed) Noncompliance Item 50-358/80-08-02 The inspector verified that new fuel receipt inspection and inven-tory records are adequately stored and the appropriate revision has been made to NE. SAD.03, Accountability of Special Nuclear Materials.
(Closed) Unresolved Item 50-358/80-04-01 The inspector reviewed the newest revision of EC. SAD.03, Jumper and Lifted Wire Control, and verified it is adequate to insure proper control of jumpers and lifted wires.
(Closed) Unresolved Item 50-358/80-11-02 The inspector reviewed the newest revision of EC. SAD.05, Work Request, and verified it was adequate to control the storage and/or accumula-tion of transient combustible material on the refueling floor.
(C,losed) Unresolved Item 50-358/80-08-04 The inspector reviewed NE.RFP.01, Revision 1, Movement of Fuel in the Reactor and Spent Fuel Pool, and verified it to meet the require-c ment for a refueling bridge operation procedure as delineated in NE. SAD.02, Revision 1, Fuel Handling and Core Alterations.
3.
Bulletin Review (0 pen)Bulletin 79-16, Vital Area Access Control l
This item remains open until appropriate response is received from the Electrical Production Department.
,
-2-i i
i
_
>
-
. _ _
.
., _.
....
.. *
.
'
(Closed)Bulletin 79-24, Frozen Lines A review was performed to insure all lines exposed to outside atmos-phere were correctly and adequately heat traced or buried below the
,
frost line.
(0 pen)Bulletin 80-01 Operability of ADS Valve Pneumatic Supply The inspector verified that all requirements of the bulletin have
.
been performed, except the scheduling and performance of periodic leak tests of the ADS Accumulator System.
,
4.
Preoperational Testing Quality Assurance
,
i Station preoperational testing quality assurance (QA) activities were observed and reviewed to ascertain the effectiveness of the
,
licensee's QA program to provide controls over the conduct of preop-i erational testing and related activities; that the program is con-sistent with FSAR commitments and regulatory requirements and that the program is being properly implemented.
}
The following items were considered in this review:
QA surveillance activities were being performed at the estab-
.
.
)
lished frequency and in accordance with approved procedures or
checklists.
i System turnover packages from construction to the preopera-
.
'
tional testing group were conducted in accordance with approved
procedures.
Identified discrepancies were corrected.
.
J l-Corrective action was-timely and appropriate.
.
~
QA personnel conducting audit activity meet the minimum educa-
.
tion and training requirements.
,
l a.
Documentation Reviewed t
]
(1) NES Audit NQA-187 of System Turnover Conducted, October
{
11, 1979.
Response to Audit NQA-187-B.K. Culver to W. W. Schwiers dated November 23, 1979.
l (2) QA&S Audit / Surveillance Report No. 245 conducted June 7-8, i
1979 of the CG&E Turnover Group.
!
!
(3) CG&E Field Audit Report (FAR) No. 261 conducted September 4,-
!
1979 of Henry J. Kaiser (HJK) QA group.
i 3-
-
,
,
5 r
_
g
_. _ _ _,.,._
. h
. [
,,%p,
- '
.,y,,-'
r '5e-7
-- -
et-mm--e--
-"M**--T-W-M"-
F
"W?*V"'
L
- M y p,- -
- i
- 7
- *
'm['
,I
n
__ _-
.
- "nquest for response to FAR No. 261 dated October 12,
'1979.
Response to FAR No. 261 dated October 17, 1979 Letter to Henry J. Kaiser Company.from Principal QAES'
Engineer stating response to FAR No. 261 was inadequate dated October 29, 1979.
Letter to Henry J. Kaiser Company from Manager Quality Assurance requesting corrective action be taken to close FAR No. 261 dated January 23, 1980.
Inter-office mer.orandum from GC&E Auditor to HJK QA super-visor dated January 28, 1980.
Inter-office memorandum from HJK QA Supervisor to GC&E auditor dated January 30, 1980.
Letter to HJK from GC&E auditor dated January 31, 1980.
Inter-office memorandum from HJK to QA manager to CG&E QA manager dated May 1, 1980.
4.
QA&S Procedure 18-QAS-01, Planning Reporting and Followup of Audits, revision 0, March 15, 1977.
5.
QA&S Procedure 18-QAS-02, Qualification of Auditors, revision ), March 15, 1977.
6.
HJK Quality Assurance Procedure No. 20, Indoctrination and Training, revision 3, May 2, 1979.
7.
QA&S Audit No. 309 conducted April 30 thru May 2, 1980.
8.
QA&S Auditors and Lead Auditors qualification records.
9.
EPD QA Audit No. SU.TG.04 conducted May 1, 1979.
10.
EPD QA Audit No. SU.TG.06 conducted June 5, 1979.
11.
Procedure QA. SAD.08 QA/QC Personnel Qualifications require-
-ments, revision 00, May 21, 1979.
12. EPD QA Auditors qualification. records.
b.
Findings-1.
_NES Audit NQA-187' conducted October 11, 1979 nonconfor-mance item #3,-finding #4 concerning system turnover-
'
_4
.
..
. - -
._,
.,
'
.
"
documentation review stated, "A list of personnel who are authorized to sign release forms and test data sheets was not available for review." The follow-up or corrective action re.ponse stated, " Generally, the release forms and test documents already provide signature block descrip-tion / requirements for the var;;us groups or departments involved." This response was inadequate to insure only authorized personnel sign release forms and test data sheets during the release or test and the QA review of documentation.
Nonconformance item #11, findings 1, 2, 4, 5, 6 concerning constructor QA and inspection activities had not been res-
.
ponded to as of June 3, 1980.
The above are samples of inadequate responses and/or corrective action, therefore, they are considered to be in noncompliance with the requirements of 10CFR50, Appendix B, Criterion XVI, W. H. Zimmer FSAR and the Wm. H. Zimmer m
QA Manual, Section 16, Paragraph 16.4.2 which states in
,
part that significant conditions adverse to quality are reported to management and correctist action is obtained where required.
(50-358/80-14-01)
2.
CG&E Field Audit Report No. 261 Tnis 4ub ' of Henry J. Kaiser Quality Control inspection personnS) was completed ou September 4, 1979 and as of June 3, 1980 an adequate response and/or corrective action
,
to solve the audit findings had not been completed.
)
This is considered to be in noncompliance with the require-ments of 10rFR50, Appendix B, Criterion XVI, Wm. H. Zimmer FSAR and the Wm. H. Zimmer QA Manual, Section 16, Paragraph 16.4.2 which states in part that significant conditions adverse to quality are reported to management and correc-tive action is obtained where required.
(50-358/80-14-02)
5.
Plant Tours The following items were observed during the frequent tours conducted by the NRC Senior Resident Inspector. All items were acknowledged by the licensee, a.
Weld Rod Control The inspector observed a portable weld rod warmer (IW-2) in 'use in the drywell on June 9,1980 which was not plugged in and the-5-
_
top was removed exposing weld rod. Weld rod control has been
brought to the attention of the licensee for many years and has been cited as items of noncompliance at least 10 times in the last five years, the most current being noncompliance item 50-356/30-07-01. This item is considered in noncompliance with 10CFRLO, Appendix B, Criterion XVI, Wm. H.'Zimmer FSAR and KEI's Special Process Procedure Manual, Section 3.3 which requires that portable rod warmers are to be electrically plugged in at all time except during transport to and from the rod shack. (50-358/80-14-03)
b.
Material in Safety-related. Cable Trays During the tour conducted on June 9, 1980, the following was observed in the cable trays:
1.
Light bulbs 2.
Metal pipe 3.
Welders remote rheostat 4.
Conduit support clamp 5.
Wire brush 6.
Concrete chips 7.
Metal pipe fittings 8.
Expansion anchor bolt 9.
Various pieces of metal 10.
Rags 11.
Pieces of wood 12.
Face shield 13.
Paper towels used for liquid dye penetrant checks 14.
Cardboard box As a result of this finding a cable tray cleaning crew has been assigned to clean all cable trays in the Reactor and Auxiliary buildings on a monthly rotating basis.
ABMCC 1A, compartment 12A, had 2 green tags on it from the same c.
preoperational testing release (PT-RH-01). The tag numbers were 7200 and 7207. Tag number 7207 was removed by licensee.
d.
Partially full tube of AWS E7018 weld rod was found in compound Shelterhouse #2 June 2, 1980. The licensee destroyed the weld rod and conducted lectures for all welders concerning the proper control of weld rod. Subsequent to that, item a. of Plant Tours was observed.
ANSUL fire bottle at NW quadrant, ground floor of turbine e.
building, was found which has no inspection tag attached and was not wired to prevent-inadvertant use.
It was removed and replaced with a CO2 fire extinguisher.
'
l
]
-6-,
_ _ _ _.
_
f.
.
s 6.
Monthly Exit Meeting The inspector met with licensee representatives (denoted in Para-graph 1) at the conclusion of the inspection on June 26, 1980. The inspector summarized the scope and findings of the inspection. The inspector emphasized the necessity of insuring that welders are fully trained in the procedural requirements established for control of weld rod. In the area of cable tray cleanliness, the inspector noted that in latter part of the month a marked improvement could be observed and that the cable tray cleaning crews appeared to be an effective method to insure their cleanliness.
i l-7-
'