IR 05000272/2025401

From kanterella
Jump to navigation Jump to search
And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2025401, 05000272/2025401, and 05000311/2025401
ML25175A067
Person / Time
Site: Salem, Hope Creek  
(NPF-057, DPR-070, DPR-075)
Issue date: 06/24/2025
From: Brice Bickett
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Mcfeaters C
Public Service Enterprise Group
References
IR 2025401
Download: ML25175A067 (1)


Text

June 24, 2025

SUBJECT:

HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000354/2025401, 05000272/2025401, AND 05000311/2025401

Dear Charles McFeaters:

On June 12, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, and discussed the results of this inspection with David J. Mannai, Vice President Regulatory Affairs and Oversight-Nuclear, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000354, 05000272, and 05000311 License Nos. NPF-57, DPR-70, and DPR-75

Enclosure:

As stated

Inspection Report

Docket Number:

05000354, 05000272, and 05000311

License Number:

NPF-57, DPR-70, and DPR-75

Report Number:

05000354/2025401, 05000272/2025401, and 05000311/2025401

Enterprise Identifier: I-2025-401-0022 and I-2025-401-0023

Licensee:

PSEG Nuclear, LLC

Facility:

Hope Creek Generating Station and

Salem Nuclear Generating Station, Units 1 and 2

Location:

Hancocks Bridge, NJ

Inspection Dates:

June 9, 2025 to June 12, 2025

Inspectors:

T. Eck, Senior Physical Security Inspector

C. Davis, Physical Security Inspector

J. Kepley, Operations Engineer

S. McCarver, Physical Security Inspector

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1) Tier I: All Requirements Tier II: 8 Requirements: (02.06 a - c; 02.07 a; 02.08 a - d)

Tier III: 1 Requirement: (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (2 Samples)

(1) Tier I: All Requirements Tier II: 17 Requirements (02.05 a and c; 02.06 a, d, g - n; 02.07 a - e)

Tier III: 4 Requirements (02.08; 02.09 a and b; 02.11 a)

(2) The inspectors evaluated the Security Performance Evaluation Program.

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===procedure elements:

Security Plan Changes===

(1) Since the last NRC baseline inspection of this program area, Security Plan Revision 21 to 22 was implemented. Based on PSEG Nuclear's evaluation, and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan changes continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were

===evaluated:

Review of Power Reactor Target Sets===

(1) Requirements (9): (03.01 a; 03.02 a - f; 03.03 a; 03.04 a and b; 03.05.a)

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) July 1, 2024 through March 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 12, 2025, the inspectors presented the security baseline inspection results to David J. Mannai, Vice President Regulatory Affairs and Oversight-Nuclear, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

20991600

20991925

20992019

20993295

209993307

20977876

20983770

20985519

20985855

20991971

Corrective Action

Documents

Resulting from

Inspection

20994524

20094525

20094526

20094527

20989083

Miscellaneous

Post R30 Badge Issue/Visitor Processing

Revision 11

Procedures

SY-AA-101-112

Searching Personnel, Vehicles, Packages, and Cargo

Revision 37

SY-AA-101-118

Control of Badges

Revision 7

SY-AA-101-120

Control of Security Locks, Keys, Cores, and Combination

Locks

Revision 15

SY-AA-106-117

Control and Classification of Safeguards Information

Revision 17

71130.05

Calculations

26352

Security Improvements Terrain Analysis

Revision 1

6A5-2157

Security Design Basis Threat Engineering Support

Revision 3

SHC 020

Cooling Tower as VBS Evaluation

03/05/2024

VTD 327944-001

Security Inner Vehicle Barrier System

08/03/2005

Drawings

606273

Security Pathways / Unattended Openings

Revision 0

Miscellaneous

Lower Alloway Creek LLEA MOU

24

LP-1107

Legal Authority and Use of Force

04/26/2022

LP-2009

Drill and Exercise Controller Training

Revision 4

LP-7001

Salem/Hope Creek Adversary Course

Revision 1

Procedures

SY-AA-1005

Corrective Action Screening, Evaluation Quality Review and

Closure Board Charter

Revision 3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101

Physical Protection Program

Revision 13

SY-AA-101-0001

Salem and Hope Creek Battle Book

Revision 19

SY-AA-101-0001-

F2

Salem and Hope Creek Timelines

Revision 3

SY-AA-101-101

Developing Responder and Adversary Timelines

Revision 2

SY-AA-101-103

Guidance for Conducting Inspections of the Security Vehicle

Barrier System

Revision 14

SY-AA-101-116

Conducting Patrols

Revision 22

Self-Assessments NOSA-HPC-24-

Security Audit Report

2/22/2024

NOSA-HPC-25-

Security Audit Final Report

03/04/2025

71130.09

Procedures

Salem Hope Creek Security Plan

Revision 22

71130.14

Calculations

Hope Creek Target Set Book

Salem Unit 1 Target Set Book

Salem Unit 2 Target Set Book

Procedures

SY-AA-101-150

Developing and Maintaining Critical Target Sets

Revision 8

71151

Procedures

SY-AA-1006

Security Performance Indicator Program

Revision 11