IR 05000352/1990023

From kanterella
Jump to navigation Jump to search
Insp Repts 50-352/90-23 & 50-353/90-22 on 900917-1015.No Violations Noted.Page 19 Withheld.Major Areas Inspected: Plant Operations,Radiation Protection,Surveillance & Maint, Emergency Preparedness,Security
ML20028H200
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/08/1990
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028H201 List:
References
50-352-90-23, 50-353-90-22, NUDOCS 9011160105
Download: ML20028H200 (43)


Text

.

  1. '

'

-

.cg -

se q3

,

,

,

.

.

<

.'

U.S. NUCLEAR REGULATORY COMMISSION

,

j-l

,

REGION I

,-

f!L

- Report Nos. -

90-23

'!

..

90-22

,

w p

Docket Nos.

50-352-

'

'-

'

50-353

+

i I

- License Nos.

NPF-39

'

'

NPF-85

.[

,

,

..

Licensee:

Philadelphia Electric Company

'

~

Correspondence Control Desk P.O. Box 195 -

.

Wayne, Pa - 19087-0195 I

" Facility:

-Limerick Generating Station, Units 1 and 2

<

'

' '

. Inspection Period:.

. September 17 - October 15, 1990-y

t iE nspectorsF T. J. Kenny,-Senior Resident Inspector L. L Scholl, Resident inspector A

M. G. Evans, Resident inspector

s

,

h

,tIh0 Oeq

Approved by:

ctun o o

Lawrence T. Doertlein, Chief f Dat'e

Reactor Projects Section No. 2B

i a

"

. Inspection Summary:.This inspection report documents routine and reactive inspections during 1. day and_backshift hours of station. activities including: plant operations; radiation protection;.

..

surveillance and: maintenance; cmcrgencyspreparedness; security; engineering and technical

'

support; and safety assessment / quality verification.

.,

.

$,

w

!

I

,

..}

9011160105 901108 hDR ADOCk 05000352

'

PDC

,

.

.A

-

U

-

!

Oi

.

-.

,

!

'4

- o

.;

l!

,V,.

'.

t SUMMARYJ OFLTHE PHILADELPHIArELECTRIO::COMPANYL

,,

~ ' ACTION PLAN i

  • OPERATE UNIT 1WITH N2H NOZZLE-AS-IS FOR THE 4TH CYCLE.

!

-

  • MAINTAIN REAGTOR WATER CHEMISTRY: ATl OPTIMUM LEVELS

)

DURING THE-47H CYCLE t

!

  • ACCEPT RECOMMENDED CAVS LIMITS OF 0.10' AND 0.15 INCHES -

'

,

AS ACTION LEVELS FOR INSPECTION I

..

?

-

L

= DEVELOP AND FINALIZE AN ACTION PLAN IF MID CYCLE OR

!

?

NINE MONTH' INSPECTION REQUIRES' CORRECTIVE ACTION

!

i e DEVELOPLAND FINALIZE AN ACTION PLAN TO BE IMPLEMENTED AT l-THE 4TH REFUEL OUTAGE AND ADVISE NRC OF RECOMMENDED

ACTIONS AT EARLIEST OPPORTUNITY t

'

!

!;

,

-

,

!

!

I

,....

,.

.r

_

_. -..._,

-.

.,. _ _.

,

,., _ _. _ _. _ _ _ _ _ _ _ _ _ _ _

_