U.S.' NUCLEAR REGULATORY COMMISSION I
'
REGION I
' Report Nos.;50-352/90-06
,
L'
50-353/90-05
,
Docket Nos.
50-352'
I 50-353-
'
i
. License Nos.-NPF-39:
,
..
NPF-85 r
i f
Licensee:~ Philadelphia Electric Company Facility Name:
Limerick-Nuclear Generating Stations, Units 1 and 2 Inspection At: - Limerick, Pennsylvania
_
-f Inspection Conducted: January 29. - February 2,1990
'
.In'spector:
2'/I' f6
'
,..
J. F. Lara, Reactor Engineer, Plant Systems date ESection', EB, DR
,
. Approved by:
-
O'
C. J. Agderson, Chief, Plant Systems date Section;-Engineering Branch, DRS Inspection? Summary:- Combined Inspection Report Nos. 50-352/90-06-and 50-353/90-05-
,
iAreas Inspected:
Routine unannounced inspection of the licensee's fire U
-
protection / prevention program activities. The scope of this inspection included.
'
program administration, control of combustibles and ignition sources, equipment
' maintenance,. surveillance tests', fire brigade training, quality assurance audits, P
and facility. tours.
.,,
Results: Of the-areas inspected, no violations were identified. One unresolved J.
item identified during a previous inspection was updated to reflect the current J
[
status of ongoing licensee activities.
. -,
hhhh
,f
'
n-l
.
-
-
- - -
-
-
_.
- - - -. -.. - -
.
<
..
.
.
DETAILS 1.0. Persons Contacted 1.1 Philadelphia Electric Company (PECo)
Boscola, E., Fire Protection Conway, J., Fire Protection
- Doering, J.,
Project Manager
- Edwards, G. D., Technical Superintendant Goldman, J., Engineer
- Leitch, G M., Vice President, Limerick Generating Station
- Muntz, D. L., Fire Protection Supervisor Rekito, W. A., Licensing Engineer Schoff, R., Engineer
- Smith, R. H., NQA Senior Auditor
- Sokso, W. G., Licensing
- Spencer, J. W., Maintenance Superintendant 1.2 U. S. Nuclear Regulatory Commission (NRC)
- Evans, M., Resident Inspector
- Kenny T.
J., Sr. Resident Inspector
.
,
- Scholl, L., Resident Inspector
- denotes those present at the exit meeting held on February 2,1990 2.0 Follow-up of Previous Inspection Findings
(Update) Unresolved item (50-352/87-31-02) Diesel Lube 011 Exhaust Leak Fire Hazard.
This item pertains to lube oil leakage from sn exhaust flange which results in heavy smoking from its burning on exhaust piping.
The licensee routinely experiences smoke alanns during diesel operations from the diesel oil leakage. The inspector was concerned that substantial oil leakage in the hot manifold area could cause a fire.
The licensee has approved a modification (5914-2) for Unit 2 Diesel engines to reduce the amount of oil that leaks from exh ust flanges and to limit the amount of excess oil which accumulates in the exhau;t line. The modification involves
_
the installation of an air valve in the diesel air start line, between the air
-
r-manifold and the pressure regulator for the main bearing lube oil booster.
The
'"'
valve will provide a means of isolating air to the main bearing oil booster when it is desireable to use the air system to rotate the diesel engine and clear it of excess oil. The manufacturer, Colt Industries, concurs with this modification. This modification has been approved by the Plant Operations Review Committee for Unit 2 diesels but has not yet been approved for Unit I diesel :
,
- ,.
,,
.
.
p
To allow rotating of the engine, the diesel generator will have to be declared INOPERABLE since the engine emergency stop will be manually depressed. The engine will then be slowly rotated with the diesel air system.
Returning the diesel generator to OPERABLE status will require strict control of the air valve position to ensure availability of air to the main bearing oil booster and correct positoning of the fuel rack. Therefore, pending NRC review of the completed installation of the modification and of the administrative controls associated with returning the diesel to service, this item will remain open.
3.0 Fire protection / Prevention Program (64704)
The inspector reviewed documents in the following areas of the program to verify that the licensee had developed and implemented adequate procedures consistent with the Final Safety Analysis Report (FSAR), Fire Protection Evaluation Report, and licensee commitments.
The documents reviewed, the scope of review, and the inspection findings for each area of the program are described in the following sections.
3.1 Program Administration and Controls for Ionition Sources and Combustible Materials The' inspector reviewed the fol.lt.,ing administrative procedures to verify that the Fire Protection Evaluation Rtport, as described in the FSAR and other licensing documents, is properly implemented.
The following documents were reviewed:
Fire Protection Plan, Rev 1
Technical Specifications,Section 6, Administrative Control
Procedure A-12 " Ignition Source Control Program", Rev. 2
Procedure A-12.1, " Control of Technical Specification Continuous
Firewatches and Hourly Firewatch Patrols", Rev. 2 Proccdure A-12.2, " Control of Combustible Materials and Compressed
Gases", Rev. 4 The scope of the review was to ascertain that:
Personnel are designated for implementing the program at the site;
I Qualifications are delineated for personnel designated to implement
the program; Special authorization is required for the use of combustible, flammable
or explosive hazardous material in safety-related areas; Prohibition exists on the storage of combustible, flammable or explosive
hazardous material in safety-related areas;
.
k
.
l
.
!
.
.
\\
-
!
'
Removal is required of all wastes, debris, rags, oil spills or other
combustible materials resulting from work activities at the end of the job or at the end of each work shift, whichever is sooner;
All wood used in safety-related areas is reautred to be treated with
!
,
flame retardent; Periodic inspections are specified for accumulation of combustibles;
Housekeeping is required to be properly maintained in areas containing
safety-related equipment and components; r
Requirements exist for special authorization (work permit) for acti-
vities involving welding, cutting, grinding, open flame or other ignition sources and that they are properly safeguarded in areas containing safety-related equipment and components *
Prohibition on smoking exists in safety-related areas, except where
" smoking permitted" areas had been specifically designated by plant management; Fire brigade organization and qualifications of brigado members are
delineated;
'
Fire reporting instructions for genera,1 plant personnel are developed;
Periodic audits are required to be conducted on the entire fire
protection program; and, Fire protection / prevention program is included in the i tcensee's QA
program.
The review of these documents did not identify any procedure wednesses.
,
Dis:ussions with fire protection engineers indicated that they we.'e knowledgeable of the fire protection program and fire systems. The above areas were reviewed with inspection observations described below.
3.2 Equipment Inspection and Tests The. inspector reviewed selected documents to determine if the licensee had developed adequate procedures which established inspection and testing require-ments for the plant fire protection equipment. The inspector also reviewed inspection / test records to verify compliance with Technical Specift:ations and with established procedures. Documents reviewed are listed below.
ST-7-022-252-0,"FSWS Pump Characteristic Test" performed 9/88
ST-6-022-911-0,"FSWS Diesel Driven Pump Quaterly Battery Inspection"
ST-7-022-251-0," Fire Pump Operability Verification"
.
t
.
J
.
l ST-6--022-320-2," Unit 2 FSWS Operability Verification"
'
ST-6-022-450-2," Unit 2 Fire Suppression Water System Valve Lineup
Verification"
'
ST-6-022-451-0," Low Pressure CO2 Lineup Verification"
ST-6-022-450-0," Fire Suppression Loop and Common Safeguard Water
System Valve Lineup Verification" ST-5-022-453-2,"Halon System Lineup Verification"
,
ST-6-022-323-0,"Halon System Operability Verification"
.
'
ST-6-022-252-0,"FSWS Diesel Driven Pump Flow Test"
ST-6-022-320-0," Unit I and Common FSWS Operability Verification"
,
ST-7-022-353-2,"Halon System Inventory" l
During the review of test records, the inspector noted that test abnormalities and deficiencies were adequately reviewed and resolved by retest, when necessary.
During this inspection the inspector witnessed the testing of the diesel driven
,
,
fire pump in accordance with procedures.
The inspector noted that alarms
!
associated with high cooling water temperature were appropriately resolved.
This included declaring the diesel fire pump INOPERABLE and cleaning out appropriate strainers which appeared to reduce the available cooling water flow.
.
The inspector commented to the fire protection angineers that it may be worthwhile including the strainers in the licensee's per' odic maintenance program.
The inspector also reviewed the maintenance t'r m t list to determine the amount of fire protection equipment that is inoperable.
1he fi a protection equipment that requires maintenance has only a minor impace on pla-t safety.
No unacceptable conditions were identified.
i 3.3 Fire Brigade Trainir,o 3.3.1 Procedure Review The inspector reviewed the fire brigade training program to verify that this program includes:
b a.
Requirements for announced and unannounced drills; b.
Requirements for brigade training and retraining at prescribed frequencies; c.
Requirements for at least one drill per year to be performed on a
"back shif t" for each brigade; and, d.
Requirements for maintenance of training records.
,
- m
.
-
t
.
.
.
The inspector reviewed training records for several fire brigade members to verify that the above requirements were being met. The inspector also observed the fire drill conducted on February 1.
The fire brigade responded with proper equipment gear to the PECo warehouse.
During this review no deficiencies were identified.
3.3.2 Records Review The inspector reviewed the training records of the fire brigade members for 1989 to ascertain that they had attended the required quarterly training,
,
participated in a quarterly drill, and received the annual hands-on fire extinguishment practice. The inspector reviewed the following documents:
RT-7-022-981-0," Quarterly Fire Brigade Meeting Review"
RT-7-022-983-0," Fire Brigade Drill Review"
The above reports documented training drills conducted for fire brigade members.
The inspector noted that during the fourth quarter of 1989, the fire brigade meetings consisted of discussion of the 1989 Sharon Harris turbine building fire. No deficiencies were identified.
3.4 Quality Assurance Audits The licensee's Fire Protection Program requires that annual, biennial and triennial audits of the fire prototion program e. conducted.
The inspector reviewed the reports of the following audits conducted by the Nuclear Quality Assurance Department to satisfy program requirements.
'
Audit No. LA89-010 cm. ducted 4/3-4/7, 1989
Audit No. LA89-031 tondo >ed 9/18-11/22, 1989
Audit LA89-010 addressed the inst ti of the fire protection program for Unit 2 prior to unit fuel loading. The inspect.r noted that the documented audit findings and observations were thorough and addressed program requirements.
Selected responses to the audit were reviewed and found to be acceptable.
3.5 Fire Protection Facility Tour The inspector examined fire protection water systems, including fire pumps, fire water piping and distribution systems, hydrants and contents of hose houses,
,
The inspector toured accessible vital and nonvital plant areas and examined t
fire detection and alarm systems, automatic and manual fixed suppression systems, interior hose stations, fire barrier penetration. seals, and fire doors. The inspector observed general plant housekeeping conditions and randomly checked I
tags of portable extinguishers for evidence of periodic inspections.
No deterio-
'
ration of equipment wa* acted. The inspection tags attached to extinguishers indicated that monthly 1aspections were performed. The inspector also examined several valves to verify that positions were as specified in surveillance procedures for water and CO2 systems.
,
No unacceptable conditions were identified.
_
-'-
m;
..j
.p*,
j
,
- l
1
-
,,
,
l
'
!
4.0 Exit Interview
'
At the conclusion of the inspection on February 2,1990, the inspector met with
.the licensee representatives denoted in Section 1.0.
The inspector summarized j
[
the scope.and results of the. inspection at that time.
',
,
At no time during 'this inspection was written material. given to the licensee.
J
<
p(
!
t i
l E
.,
I i
'
i
.$
f
, '.
.:
I
.
q
!
'
' t
.
i A
z, F
'
!
'f
>
f I
!
'
.l
.
.
>
I
!
d
.,
,
f
.e i
r c
.
.
.. - -
.
-
. -.
-
- -
-.
.
.i
'
'