IR 05000338/2015404
| ML15348A303 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/14/2015 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Heacock D Virginia Electric & Power Co (VEPCO) |
| Gruhler L 404-997-4633 | |
| References | |
| IR 2015404 | |
| Download: ML15348A303 (4) | |
Text
December 14, 2015
SUBJECT:
NORTH ANNA POWER STATION, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000338/2015404 AND 05000339/2015404
Dear Mr. Heacock:
On November 19, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. F. Mladen, and other members of your staff.
The inspectors documented the results in the enclosed inspection report (IR).
No NRC-identified or self-revealing findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7
Enclosure:
IR 05000338/2015404 and 05000339/2015404 w/Attachment: Supplementary Information (OUO)
cc: Distribution via Listserv
ML15348A303 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS/PSB2 RIV:DRS/PSB1 RII:DRS/PSB2 RII:DRS/BR5 RII:DRS/PSB2
SIGNATURE RLP5 ADM4 via e-mail JHW2 via e-mail SON for ADM2 BBD
NAME R. Patterson A. Meyen J. Wallo A. Masters B. Desai
DATE 12/ 11 /2015 12/ 11 /2015 12/ 11 /2015 12/ 11 /2015 12/ 14 /2015
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:
Danny Hicks Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117