IR 05000335/1988019
| ML17222A582 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/01/1988 |
| From: | Decker T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8811140020 | |
| Download: ML17222A582 (2) | |
Text
ACCELERATKD DISTRIBUTION DEMONSTRA'TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR:8811140020 DOC.DATE: 88/11/01 NOTARIZED-NO
~
~
~
FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION DECKER,T.R.
Region 2, Ofc of the Director RECIP. NAME RECIPIENT AFFILIATION CONWAY,W-F.
Florida Power
& Light Co.
SUBJECT:
Ack receipt of 881013 ltr informing NRC of steps taken to correct violations noted in Insp Repts 50-335,389/88-19.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR
)
ENCL X SIZE:
I TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
DOCKET 05000335 05000389 R
j'
RECIPIENT XD CODE/NAME PD2-2 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12 OE XEBERMAN,J G FI
ERNAL: LPDR
NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME TOURIGNY,E AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE
NRC PDR RESL MARTIN,D COPIES LTTR'NCL A
D
NOIR 'IO ALL '%IKS" KKIPIEÃIS'XFASE HELP US IO REIXlCE %ASTE!
QMMT 'IHE DOCUMENT CGFlBOL DESK, KXM P1-37 (EZZ. 20079)
IO ELIMINATEYOUR NUMB HKH DISTRIBOTZGN LISTS MR DO(XlMEPIS YOU DGNiT NEEDt TOTAL NUMBER OF COPIES REQUXRED:
LTTR
ENCL
OffTL'ICLf Florida Power and Light Company ATTN:
Nr.
M. F.
Conway Senior Vice President - Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-335/88-19 AND 50-389/88-19 Thank you for your response of October 13, 1988, to our Notice of Violation, issued on September 14, 1988, concerning activities conducted at your St. Lucie facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, cc: M N. Harris, Vice President St. Lucie Nuclear Plant v4. J. Boissy, Plant Nanager M. B. Harper, gA Superintendent State of Florida bcc:WRC Resident Inspector DRS Technical Assistant Document Control Desk Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards 10/13/88 10+/88 SSiii40020 SSii0i PDR ADOCK OS00033S
PDC 1 Ij~~/