Security Baseline Inspection Report 05000334/2025401 and 05000412/2025401
ML25350A376
Person / Time
Site: Beaver Valley
Issue date: 12/16/2025
From: Brice Bickett
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Blair B
Vistra Operations Company
References
IR 2025401
Download: ML25350A376 (0)


Text

December 16, 2025

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000334/2025401 AND 05000412/2025401

Dear Barry Blair:

On December 11, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Beaver Valley Power Station, Units 1 and 2, and discussed the results of this inspection with Bob Kristophel, General Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security

Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000334 and 05000412

License Numbers:

DPR-66 and NPF-73

Report Numbers:

05000334/2025401 and 05000412/2025401

Enterprise Identifier: I-2025-401-0014

Licensee:

Vistra Operations Company, LLC

Facility:

Beaver Valley Power Station, Units 1 and 2

Location:

Shippingport, PA

Inspection Dates:

December 08, 2025 to December 11, 2025

Inspectors:

C. Davis, Physical Security Inspector

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Beaver Valley Power Station, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization (1 Sample)

(1) 20 Requirements (02.01 a - c, 02.02 a - j, 02.03 a - c, 02.04 a, 02.05 a, b, 02.07 a)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection elements:

Fitness For Duty Program (1 Sample)

(1)23 Requirements (02.01 a, 02.02 a, 02.03 a, b, 02.04 a - c, 02.05 a - d, f - l, 02.06 a, b, d, 02.10, 02.12 a)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On December 11, 2025, the inspectors presented the security baseline inspection results to Bob Kristophel, General Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

23-03998

23-04705

23-04706

23-08659

23-07871

23-08691

23-08691

24-01756

24-01908

25-00405

25-01331

25-03465

25-03891

25-04083

25-04088

Procedures

FLT-SY-9000

Access Authorization Program

Revision 0

Self-Assessments EVAL-2025-0002

25 AA-PADS FFD Audit Report

71130.08

Corrective Action

Documents

23-00882

23-01641

23-03998

24-03637

24-04177

Procedures

Generic Fitness-for-Duty and Behavior Observation Lesson

Plan

Revision 4

Generic Plant Access Training Lesson Plan

November

21

FLT-AS-PL0013

Fitness for Duty Policy

FLT-SY-9100

Fitness for Duty Program

Revision 0