Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0062-001-01-013 JPM No: 2002 NRC S1 Task

Title:

Start [1RC-P-1A], Reactor Coolant Pump K/A

Reference:

003 A2.02 (3.7/3.9) 003 A3.04 3.6/3.6) 003 A4.06 (2.9/2.9 Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: ____

Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE cues.

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 3 preparing to enter Mode 2 to perform a reactor startup. Currently 1RC-P-11B and 1RC-P-1C are in operation. Another Operator has begun 1OM-6.4.A, Reactor Coolant Pump Startup procedure completing all steps through IV.A.13. All systems and components are operating in their normal alignment to support pump operation.

Task Standard: 1RC-P-1A is started and then tripped on high vibration in accordance with 1OM-6.4.A and 1OM-53C.4.1.6.8.

Required Materials: None General

References:

1OM-6.4.A, Reactor Coolant Pump Startup, Rev. 20 1OM-6.4.ACR, Reactor Cool Pump Vibration High High, Rev. 3 1OM-53C.4.1.6.8, Abnormal RCP Operation, Rev. 0 Handouts: 1OM-6.4.A, Rev. 20 (marked up copy) 1OM-6.4.ACR, Rev. 3 1OM-53C.4.1.6.8, Rev. 0 Tools: Stopwatch Initiating Cue: The Unit Supervisor directs you to start 1RC-P-1 A beginning at Step IV.A.14 of 1OM-6.4.A, Reactor Coolant Pump Startup.

Time Critical Task: NO Validation Time: 20 minutes

Form ES-C-1 (R8, S1)

Appendix C Page 2 of 9 JOB PERFORMANCE MEASURE 2002 NRC S1 Start [1 RC-P-1 A], Reactor Coolant Pump Simulator Setup Information

Appendix C Page 3 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Start [1 RC-P-1 A], Reactor Coolant Pump 2002 NRC S1 (Denote critical steps with an asterisk) Start Time:

Performance Step 1: If starting the first RCP in a non-isolated loop AND the cold leg (Step IV.A.14.a) temperature of any non-isolated RCS loop is < 343°F, verify the highest Reactor Coolant Loop to Steam Generator AT is < 50°F within 10 minutes of starting a reactor coolant pump.

Standard: Candidate N/A's step. (1 RC-P-1 B and 1 C already running.)

Comments:

  • Performance Step 2: Place control switch for [1 RC-P-1 A] to START and Start a stopwatch.

(Step IV.A.14.b)

Standard: Candidate locates pump control switch.

"* Places control switch to START position.

"* Starts the stopwatch.

Comments:

Performance Step 3:

Performance Step 3: Observe the red running light is ON for oil lift pump.

(Step IV.A.14.c)

Standard: Candidate locates pump indicating lights.

5 Verifies red light is ON.

Comments:

Appendix C Page 4 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Start [1 RC-P-1 A], Reactor Coolant Pump 2002 NRC S1 Performance Step 4: Verify the RCP starts approximately 2 minutes after the Bearing Lift (Step IV.A.14.d) Oil Pump starts.

Standard: Candidate locates pump indicating lights.

"* Verifies pump starts after approximately 2 minutes using a stopwatch.

"* Verifies red light is ON.

Comments:

Performance Step 5: Verify on [1 RC-P-1 A Amps] Reactor Coolant Pumps, the RCP starting (Step IV.A.14.e) amps drop off 10 to 30 seconds after the RCP breaker closes.

Standard: Candidate locates 1 RC-P-1A ammeter.

0 Verifies starting amps drop off within 10 - 30 seconds.

Comments:

Performance Step 6:

Performance Step 6: Verify the bearing lift oil pump stops between 47.5 and 52.5 seconds.

(Step IV.A.14.f) after the RCP starts as indicated by the green light ON for the oil lift pump.

Standard: Candidate locates pump indicating lights.

  • Verifies green light is ON within 47.5 - 52.5 seconds after RCP start using a stopwatch.

Comments:

Appendix C Page 5 of 9 Form ES-C-1 (R8, Sl)

PERFORMANCE INFORMATION Start [1 RC-P-1 A], Reactor Coolant Pump 2002 NRC Si Note: The following steps represent the alternate path for this JPM.

Performance Step 7: Respond to RCP high vibration alarms.

Standard: Candidate identifies high vibration condition from annunciators

[A3-126] and [A3-127].

Evaluator Note: After identifying the vibration alarms, provide the Candidate with a copy of 1 OM-6.4.ACR.

Evaluator Note: If asked, inform the Candidate that the alarm is due to a valid condition.

Comments:


Evaluator Note: Provide the Candidate with a copy of 1OM-53C.4.1.6.8. -----------

Step 8:

Performance ---------------- ---- ------

Performance Step 8: Both of the following are met: ([VIB-MON-1], RCP Vibration Monitor).

(Step 2.d)

Standard: Candidate verifies high vibration on 1 RC-P-1A.

"* Green LED is ON.

"* Shaft vibration > 20 mils or frame vibration > 5 mils.

Evaluator Note: If necessary, inform the Candidate that another Operator will monitor the control boards while checking vibration readings.

Comments:

Appendix C Page 6 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Start [1 RC-P-1 A], Reactor Coolant Pump 2002 NRC S1 Performance Step 9: Trip the reactor.

(Step 2.d.1 RNO)

Standard: No action required. (The plant is not in Mode 1 or 2 - JPM Initial Conditions).

Comments:

Performance Step 10: GO TO E-0, "Reactor Trip or Safety Injection".

(Step 2.d.2 RNO)

Standard: No action required.

Evaluator Note: Inform the Candidate that E-0 Immediate Actions are NOT required to be performed.

Comments:

  • Performance Step 11: Stop the affected RCP(s).

(Step 2.d.3 RNO)

Standard: Candidate places 1 RC-P-1A control switch to Stop.

  • Verifies green light is ON and red light is OFF.

Comments:

Appendix C Page 7 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Start [1 RC-P-1 A], Reactor Coolant Pump 2002 NRC S1 Performance Step 12: Close Przr spray valve for affected RCP(s).

(Step 2.d.3 RNO)

Standard: No action required. (Valve is not open).

Comments:

Terminating Cue: When the Candidate stops the RCP, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 8 of 9 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Start rl RC-P-1A], Reactor Coolant Pump 2002 NRC S1 JPM No.: 2002 NRC S1 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 9 of 9 Form ES-C-1 (R8, Si)

JPM CUE SHEET 2002 NRC S1 INITIAL CONDITIONS: The plant is in Mode 3 preparing to enter Mode 2 to perform a reactor startup. Currently 1 RC-P-1 B and 1 RC-P-1 C are in operation. Another Operator has begun 1 OM-6.4.A, Reactor Coolant Pump Startup procedure completing all steps through IV.A.13. All systems and components are operating in their normal alignment to support pump operation.

INITIATING CUE: The Unit Supervisor directs you to start 1 RC-P-1A beginning at Step IV.A.14 of 1OM-6.4.A, Reactor Coolant Pump Startup.

Appendix C JOB PERFORIMANC;E MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0071-038-01-013 Task

Title:

Emergency Borate The RCS JPM No: 2002 NRC S2 K/A

Reference:

004 A2.14 (3.8/3.9) 024 AA1.17 (3.9/3.9) 024 AA1.18 (3.7/3.6) 024 AA2.01 (3.8/4.1)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 1 at 77% power with all systems in their normal operating alignment. An event has occurred that caused [A4-124],

Rod Control Bank "D" Low-Low to alarm. This is a valid alarm.

Task Standard: Emergency boration flow established at greater than 105 gpm in accordance with 1OM-7.4.S.

Required Materials: None General

References:

1 OM-7.4.S, Emergency Boration, Rev. 4 Handouts: 1OM-7.4.S, Rev. 4 Tools: None Initiating Cue: The Unit Supervisor directs you to take actions to emergency borate the RCS using 1OM-7.4.S.

Time Critical Task: NO Validation Time: 20 minutes

Appendix C Page 2 of 8 Form ES-C-1 (R8, Si)

JOB PERFORMANCE MEASURE Emergency Borate The RCS 2002 NRC S2 Simulator Setup Information Setup: Initialize IC-85.

Override MOV-1 CH-350 to fail closed, green light ON, red light OFF.

Appendix C Page 3 of 8 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 (Denote critical steps with an *t~rikV* 5Rtirt Time:

Performance Step 1: Ensure at least one [1CH-P-1A (1 B) (1C)], Charging Pump High Head (Step IV.A.1) Safety Injection, is running.

Standard: Candidate locates pump controls and verifies one pump running.

s Verifies red light is ON and white light is OFF.

Comments:

  • Performance Step 2: Place Emergency Boration Isol VIv [MOV-1 CH-350] control switch to (Step IV.A.2) OPEN.

Standard: Candidate locates valve control switch and places to open position.

M Verifies red light is ON and green light is OFF.

Candidate determines that [MOV-1 CH-350] has NOT opened.

Comments:

I Evaluator Note: This step may be omitted.

Performance Step 3: Place the online Boric Acid 2A (2B) Transfer Pump [1 CH-P-2A (2B)]

(Step IV.A.3) control switch to FAST.

Standard: Candidate locates pump control switch and places in fast speed.

0 Verifies pump red light is ON.

Comments:

Appendix C Page 4 of 8 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 Evaluator Note: This step may be omitted.

Performance Step 4: Verify [FI-1iCH-1 10], Emergency Boration flow greater than or equal to (Step IV.A.4) to 30 gpm.

Standard: Candidate locates flow indicator.

  • Verifies "0" flow is indicated on FI-1CH-110.

Comments:

Note: The following steps begin the alternate path section of this JPM.

Evaluator Note: If the Candidate attempts to have [MOV-1 CH 350] opened locally, or align the blender to the charging pump suction, then CUE that the Shift Manager desires to use the RWST flowpath.

  • Performance Step 5: Align the RWST to charging pump suction.

(Step IV.A.5.a.1) ° Open [MOV-1CH-115B] or [MOV-1CH-115D], RWST Disch to Chg Pumps Suct Vlv.

Candidate locates valve control switches and places at least one Standard:

control switch to the open position.

E Verifies red light is ON.

Comments:

Appendix C Page 5 of 8 Form ES-C-1 (R8, 1)

PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2

  • Performance Step 6: Align the RWST to charging pump suction.

(Step IV.A.5.a.2)

  • Close [MOV-1CH-115C] or [MOV-1CH-115E], VCT Outlet to Chg Pumps Suct VIv.

Candidate locates valve control switches and places at least one Standard:

control switch to the close position.

0 Verifies green light is ON.

Comments:

Place [FCV-1 CH-1 22], Chg Flow to Regen Hx Inlet Control Vlv

  • Performance Step 7: Place [FCV-1 CH-1 22], Chg Flow to Regen Hx Inlet Control VIM (Step IV.A.6) controller to MAN.

Standard: Candidate locates controller and depresses pushbutton.

Comments:

  • Performance Step 8: If RWST is source of boric acid, establish >_105 gpm charging flow (Step IV.A.6) as indicated on [FI-1 CH-1 22A], Charging Pump Flow.

Standard: Candidate locates flow indicator.

0 Verifies > 105 gpm indicated on FI-1CH-122A.

Comments:

Appendix C Page 6 of 8 Form ES-C-1 (R8, S1i)

PERFORMANCE INFORMATION Emergency Borate The RCS 2002 NRC S2 Performance Step 9: Verify [PI-1 RC-455, 456 and 457], PRZR Press indicate < 2335 psig.

(Step IV.A.7)

Standard: Candidate locates pressure indicators.

0 Verifies < 2335 psig on PI-1 RC-455, 456 and 457.

Comments:

Performance Step 10:

Performance Step 10: If the VCT level increases to the divert setpoint as indicated of (Step IV.A.8) [LI-1 CH-1 15], Volume Control Tank Level, verify that the letdown flow is diverted to the Boron Recovery System.

Standard: Candidate monitors VCT level indicator.

0 Verifies valves position to divert as necessary.

Comments:

Performance Step 11:

Performance Step 11 : If at power, verify Tavg returns to normal and the control bank returns (Step IV.A.9) to the maneuvering band in response to the boration.

Standard: Candidate locates control rod height on DRPI or step counters.

Verifies control rods are withdrawing or manually withdraws control rods.

Comments:

Terminating Cue: When the Candidate verifies that the boric acid flow is established, or the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 7 of 8 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Emergency Borate The RCS 2002 NRC S2 JPM No.: 2002 NRC S2 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 8 of 8 Form ES-C-i (R8, Si)

JPM CUE SHEET 2002 NRC S2 INITIAL CONDITIONS: The plant is in Mode 1 at 77% power with all systems in their normal operating alignment. An event has occurred that caused [A4-124],

Rod Control Bank "D" Low-Low to alarm. This is a valid alarm.

INITIATING CUE: The Unit Supervisor directs you to take actions to emergency borate the RCS using 1OM-7.4.S.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0111-019-01-013 Task

Title:

Transfer To Hot Leg Recirculation JPM No: 2002 NRC S3 K/A

Reference:

2.1.20 (4.3/4.2) 006 A4.01 (4.1/3.9) 006 A4.05 (3.9/3.8) 006 A4.02 (4.0/3.8)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance:_____ Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> have passed since the plant experienced a LOCA. The crew has performed all required EOP actions. The plant is in cold leg recirculation. The decision has been made to transfer to hot leg recirculation.

Safety Injection System aligned for hot leg recirculation in accordance Task Standard:

with 1OM-53A.1 .ES-1.4.

Required Materials: Shorting Bars General

References:

1OM-53A.1.ES-1.4, Transfer To Simultaneous Cold Leg and Hot Leg Recirculation, Issue 1C, Rev. 1 Handouts: 1OM-53A.1.ES-1.4, Issue 1C, Rev. 1 Tools: None Initiating Cue: The Unit Supervisor directs you to align the plant for hot leg recirculation in accordance with EOP ES-1.4.

Time Critical Task: NO Validation Time: 20 minutes

Appendix C Page 2 of 8 Form ES-C-1 (R8, Si)

JOB PERFORMANCE MEASURE Transfer To Hot Leg Recirculation 2002 NRC S3 Simulator Setup Information

Appendix C Page 3 of 8 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Transfer To Hot Leg Recirculation 2002 NRC S3 (Denote critical steps with an asterisk) Start Time:

Performance Step 1: If not already performed, Verify valve lineup for cold leg recirculation.

(Step 1.a)

Standard: No action required. (Plant is in cold leg recirculation per JPM Initial Conditions).

Comments:

Performance Step 2:

Performance Step 2: Check the following:

(Step 1.b.1)

  • Charging/HHSI Pumps - TWO RUNNING.

Standard: Candidate locates pump controls for both pumps.

  • Verifies red light is ON for both pumps.

Comments:

Step 3:

Performance Performance Step 3: Check the following:

(Step 1.b.2)

  • LHSI Pumps -AT LEAST ONE RUNNING.

Standard: Candidate locates pump controls for both pumps.

0 Verifies red light is ON for at least one pump.

Comments:

Appendix C Page 4 of 8 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Transfer to Hot Leg Recirculation 2002 NRC S3 Evaluator Note: Provide Candidate with shorting bars.

  • Performance Step 4: Insert shorting bar into [MOV-1 SI-869B], HHSI To Hot Legs Isol Vlv (Step 1 .c) jack.

Standard: Candidate locates jack and installs shorting bar.

Comments:

  • Performance Step 5: Initiate opening [MOV-1SI-869B], HHSI To Hot Legs Isol Vlv.

(Step 1 .d)

Standard: Candidate locates valve control switch and places to the open position.

0 Verifies red light is ON and green light is OFF.

Comments:

  • Performance Step 6: Immediately close [MOV-1SI-867A, 867B], BIT Inlet Isol Vlvs.

(Step 1 .e)

Standard: Candidate locates valve control switches and places to the close position.

0 Verifies red lights are OFF and green lights are ON.

Comments:

Appendix C Page 5 of 8 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Transfer to Hot Leg Recirculation 2002 NRC S3 Performance Step 7: Verify [Fl-1 SI-943], Hi Head SI To BIT Flow.

(Step 1.f)

Standard: Candidate locates flow indicator.

  • Verifies flow.

Comments:

  • Performance Step 8: Insert shorting bar into [MOV-1SI-869A], HHSI To Hot Legs Isol VIv (Step 1.g) jack.

Standard: Candidate locates jack and installs shorting bar.

Comments:

  • Performance Step 9: Initiate opening [MOV-1SI-869A], HHSI To Hot Legs Isol VIv.

(Step 1 .h)

Standard: Candidate locates valve control switch and places to the open position.

  • Verifies red light is ON and green light is OFF.

Comments:

Appendix C Page 6 of 8 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Transfer to Hot Leg Recirculation 2002 NRC S3

  • Performance Step 10: Immediately close [MOV-1 SI-836], HHSI To RCL Cold Legs Isol Viv.

(Step 1.i)

Standard: Candidate locates valve control switch and places to the close position.

2 Verifies red light is OFF and green light is ON.

Comments:

Performance Step 11:

Performance Step 11 : Verify HHSI Hot Leg Hdr Flow on [Fl-1 SI-940] - INDICATED.

(Step 1.j)

Standard: Candidate locates flow indicator.

z Verifies flow.

Comments:

Performance Step 12:

Performance Step 12: Remove both shorting bars from jacks.

(Step 1 .k)

Standard: Candidate locates and removes shorting bars.

Comments:

Terminating Cue: When the Candidate verifies HHSI flow is indicated, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 7 of 8 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Transfer to Hot Leg Recirculation 2002 NRC S3 JPM No.: 2002 NRC S3 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 8 of 8 Form ES-C-1 (RS, $1)

JPM CUE SHEET 2002 NRC S3 INITIAL CONDITIONS: Approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> have passed since the plant experienced a LOCA. The crew has performed all required EOP actions. The plant is in cold leg recirculation. The decision has been made to transfer to hot leg recirculation.

INITIATING CUE: The Unit Supervisor directs you to align the plant for hot leg recirculation in accordance with EOP ES-1.4.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0121-008-04-011 Task

Title:

Calculate And Restore Containment JPM No: 2002 NRC S4 Air Partial Pressure K/A

Reference:

103 A1.01 (3.8/3.9)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: ____

Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 3. The IPC is out of service.

The Ohio River water temperature is 73 0 F. Dewpoint temperatures are 54.50 F, 54.40 F, 54.8 0 F and 54.7 0 F respectively for computer points T0635A, T0655A, T0661A and T0675A.

Task Standard: Containment air partial pressure calculated, compared to Technical Specifications and actions initiated to restore to within limits.

Required Materials: Calculator and Steam Tables General

References:

1OM-54.3.L5, Surveillance Verification Log, Rev. 31 Technical Specifications 3.6.1.4 and Figure 3.6-1 1OM-12.4.E, Maintaining the Containment Vacuum, Rev. 2 Handouts: 1OM-54.3.L5, Rev. 31 Technical Specifications LCO 3.6.1.4 and Figure 3.6-1 1OM-12.4.E, Rev. 2 Tools: None Initiating Cue: The Unit Supervisor directs you to calculate containment air partial pressure and adjust as necessary to satisfy Technical Specification LCO 3.6.1.4.

Time Critical Task: NO Validation Time: 20 minutes

Appendix C Page 2 of 8 Form ES-C-1 (R8, Si)

JOB PERFORMANCE MEASURE Calculate and Restore Containment Air Partial Pressure 2002 NRC S4 Simulator Setup Information

Appendix C Page 3 of 8 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4 (Denote critical steps with an asterisk) Start Time:

Performance Step 1: Log Containment Dewpoint Temperatures.

(Item 119.a)

Standard: Candidate records temperatures (from JPM Initial Conditions).

Comments:

  • Performance Step 2: Average of temperatures.

(Item 119.b)

Standard: Candidate calculates average dewpoint temperature.

Evaluator Note: Average dewpoint temperature equals 54.6"F.

Comments:

3:

Performance Step Performance Step 3: Log Containment Pressure.

(Item 119.c)

Standard: Candidate locates [PI-1CV-101A1, 101 B1] and records readings.

Evaluator Note: Containment pressure readings are approximately 10.2 psia.

Comments:

Appendix C Page 4 of 8 Form ES-C-1 (R8, 1)

PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4

  • Performance Step 4: Average of pressures.

(Item 119.d)

Standard: Candidate calculates average total air pressure.

Evaluator Note: Average pressure equals 10.1 - 10.3 psia.

Comments:

  • Performance Step 5: Determine saturation pressure for Item 119.b from the saturate steam (Item 119.e) tables.

Candidate determines saturation pressure corresponding to dewpoint Standard:

temperature from the steam tables.

Evaluator Note: Saturation pressure equals 0.21 psia.

Comments:

Performance Step 6: Calculate Air Partial Pressure (Item 11 9.d - Item 11 9.e).

(Item 119.f)

Standard: Candidate subtracts saturation pressure from average containment total air pressure to determine calculated air partial pressure.

Evaluator Note: Calculated air partial pressure equals 9.89 - 10.09 psia.

Comments:

Appendix C Page 5 of 8 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4

  • Performance Step 7: Determine MAO from Technical Specification Figure 3.6-1.

Standard: Candidate refers to Figure 3.6-1 and determines MAO based on river water temperature of 73 0 F.

Evaluator Note: MAO equals approximately 9.85 psia.

Comments:

  • Performance Step 8: Verify calculated Air Partial Pressure is > 8.9 psia and < MAO.

(Item 119.g)

Standard: Candidate determines that air partial pressure is NOT within limits (greater than MAO).

Candidate reports air partial pressure is above Technical Specifications limit.

CUE: As Unit Supervisor, direct the Candidate to lower containment pressure using 1CM-12.4.E.

Evaluator Note: Provide the Candidate with a copy of 1OM-12.4.E and inform that the Initial Conditions are met.

Comments:

Appendix C Page 6 of 8 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4

  • Performance Step 9: Start [1 CV-P-1 A (1 B)], Cnmt Vac 1A (1 B) Pump.

(Step IV.A.1)

Standard: Candidate locates pump control switch and places in Start position.

9 Verifies red light is ON.

Evaluator Note: If asked, direct Candidate to start [1CV-P-1A].

Comments:

Performance Step 10: Verify open [TV-1CV-150B], 1A Cnmt Vac Pump Cnmt Isol Vlv.

(Step IV.A.2)

Standard: Candidate locates valve indicating lights.

  • Verifies red light is ON and green light is OFF.

Comments:

Performance Step 11: Verify air is being discharged by the following:

(Step IV.A.3.a) 0 Verify movement of [FTO-CV101], Cont Vac Integrated Flow.

Standard: Candidate verifies air discharge through movement of FTO-CV1 01.

Evaluator Note: No specific amount of flow is required.

Comments:

Terminating Cue: When the Candidate verifies that air is being discharged, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 7 of 8 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Calculate And Restore Containment Air Partial Pressure 2002 NRC S4 JPM No.: 2002 NRC S4 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 8 of 8 Form ES-C-1 (R8, Si)

JPM CUE SHEET 2002 NRC S4 INITIAL CONDITIONS: The plant is in Mode 3. The I PC is out of service.

The Ohio River water temperature is 73 0 F. Dewpoint temperatures are 54.5 0 F, 54.4 0 F, 54.80 F and 54.7 0 F respectively for computer points T0635A, T0655A, T0661A and T0675A.

INITIATING CUE: The Unit Supervisor directs you to calculate containment air partial pressure and adjust as necessary to satisfy Technical Specification LCO 3.6.1.4.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0362-007-01-013 Task

Title:

Transfer Bus 1AE From Emergency To JPM No: 2002 NRC S5 Normal Feed K/A

Reference:

064 A4.06 (3.9/3.9)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: ____ Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The Unit is in Mode 1. EDG No. 1 is running and carrying the loads on 4KV Bus "1AE". Normal 4KV Bus "1A" is energized from the Unit Station Service Transformer. ACB 1 E12 is closed and the 4KV normal to emergency tie breakers, 1Al0 and 1 E7 are open.

4KV Bus "1AE" is supplied from its normal feed and EDG No. 1 is Task Standard:

shutdown in accordance with 1OM-36.4.Q.

Required Materials: None General

References:

1OM-36.4.Q, Transferring Emergency Busses 1AE And 1DF From Emergency Feed To Normal Feed, Rev. 7 Handouts: 1OM-36.4.Q, Rev. 7 Tools: None Initiating Cue: The Unit Supervisor directs you to transfer Bus "1AE" to Bus "1A" and shutdown EDG No. 1 in accordance with 1OM-36.4.Q.

Time Critical Task: NO Validation Time: 25 minutes

Appendix C Page 2 of 9 Form ES-C-1 (R8, 1)

JOB PERFORMANCE MEASURE Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 Simulator Setup Information Setup: Initialize IC-86.

Ensure EDG No. 1 Speed Droop is set at 55 (LOA EPS288 - Parallel Operations)

Appendix C Page 3 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 (Denote critical steps with an asterisk) Start Time:

Evaluator Note: If asked, inform Candidate that grid stability has been verified and Operations management has given permission to proceed.

  • Performance Step 1: Place the Emerg Gen 1 Synchronizing Sel Sw to the ACB 1 E7 (Step IV.A.1) position.

Standard: Candidate locates and places selector switch to the ACB 1 E7 position.

Comments:

Performance Step 2: Verify ANN A9-8, ACB 1E7 OR 1E9 IN SYNCHRONIZING MODE, Performance Step 2: Verify ANN A9-8, ACB 1 E7 OR 1 E9 IN SYNCHRONIZING MODE, (Step IV.A.2) is ON.

Standard: Candidate verifies ANN A9-8 is ON.

Comments:

Performance Step 3:

Performance Step 3: Check control switch 4KV Bus 1AE To 1 A ACB 1 E7 is in the AFTER (Step IV.A.3) OPEN position.

Candidate locates and checks control switch is in the AFTER-OPEN Standard:

position.

0 Verifies green target.

Comments:

Appendix C Page 4 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5

  • Performance Step 4: Close 4KV Bus 1 A To 1AE ACB 1Al 0.

(Step IV.A.4)

Standard: Candidate locates and momentarily places control switch to Close position.

0 Verifies 1 Al 0 breaker red light is ON.

Evaluator Note: If asked, inform Candidate that another Operator will perform independent verifications.

Comments:

Performance Step 5:

Performance Step 5: Adjust the governor speed droop knob to 55 while maintaining (Step IV.A.5) frequency at approximately 60 Hz.

Standard: Candidate directs local operator to adjust speed droop knob to 55.

M Maintains EDG frequency at approximately 60 Hz.

CUE: Speed droop is set at 55.

Comments:

  • Performance Step 6: Using the Emerg Gen 1 Governor control switch, Adjust the generator (Step IV.A.6) speed UNTIL the Synchroscope needle is Rotating very slowly in the FAST direction.

Standard: Candidate locates and observes synchroscope rotation.

  • Adjusts governor control switch until the needle is rotating slowly in the fast direction.

Comments:

Appendix C Page 5 of 9 Form ES-C-1 (R8, Sl)

PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5

  • Performance Step 7: Using the Emerg Gen 1 Volt Adjust, match generator voltage (Step IV.A.7) (Running) with the voltage on Bus 1A (Incoming).

Candidate locates generator voltmeter (Sync Volts Running Norm)

Standard:

and compares it to 4KV Bus 1 A voltmeter (Sync Volts Incoming Norm).

"* Verifies generator voltage matches bus voltage

"* Adjusts, if necessary not to exceed 130 volts.

Comments:

  • Performance Step 8: When both synchronizing lights are completely dark AND the (Step IV.A.8) synchroscope needle is at 12 o'clock position, THEN Close 4KV Bus 1AE To 1A ACB 1 E7.

Candidate monitors both synchroscope lights and places breaker Standard:

control switch to close position when needle is at 12 o'clock.

E Verifies 1A ACB 1E7 breaker red light is ON.

Comments:

Performance Step 9:

Performance Step 9: Place the Emerg Gen 1 Synchronizing Sel Sw to the OFF position.

(Step IV.A.9)

Standard: Candidate places selector switch to the OFF position.

Comments:

Appendix C Page 6 of 9 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Transfer Bus 1 AE From Emergency To Normal Feed 2002 NRC S5 Performance Step 10: Verify ANN A9-8, ACB 1E7 OR 1E9 IN SYNCHRONIZING MODE, (Step IV.A.9.a) is OFF.

Standard: Candidate verifies ANN A9-8 is OFF.

Comments:

Performance Step 11 : Perform the following to clean out the exhaust system prior to shutting (Step IV.A.1O) down the diesel generator, as necessary.

Standard: No action required.

CUE: The diesel has been running at full load for about 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Comments:

Performance Step 12:

Performance Step 12: Reduce load on the No. 1 Diesel Generator by Placing the Emerg (Step IV.A.11) Gen 1 Governor control switch intermittently to the LOWER position.

Standard: Candidate locates and intermittently places control switch to the lower position.

Monitors the following to ensure limits are not exceeded during the load decrease:

+ 130 volts

  • Between 0.8 and 1.0 power factor Comments:

Appendix C Page 7 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5

  • Performance Step 13: When the load on the No. 1 Diesel Generator has been reduced to (Step IV.A.12) less than 200 KW (as read on the Emerg Gen 1 Watts meter), THEN Open Emerg Gen 1 Circuit Breaker ACB 1 E9.

Candidate reduces load to less than 200 KW and momentarily places Standard:

breaker control switch to the trip position.

E Verifies breaker ACB 1 E9 white light is ON.

Comments:

Performance Step 14:

Performance Step 14: Verify the Emerg Gen 1 Motor Operated Gnd Sw DS1, is Open.

(Step IV.A.13)

Standard: Candidate verifies green light is ON and red light is OFF.

Comments:

Performance Step 15:

Performance Step 15: Shutdown [EE-EG-1], Emergency Diesel Generator No. 1 in (Step IV.A.14) accordance with 1OM-36.4.AG, "Diesel Generator No. 1 Start-Up And Shutdown".

Standard: No action required.

CUE: The Turbine Bldg. Operator will shutdown the diesel generator.

Comments:

Terminating Cue: When the Candidate verifies the ground switch is open, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 8 of 9 Form ES-C-1 (R8, S1)

VERIFICATION OF COMPLETION Transfer Bus 1AE From Emergency To Normal Feed 2002 NRC S5 JPM No.: 2002 NRC S5 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 9 of 9 Form ES-C-1 (R8, Si)

JPM CUE SHEET 2002 NRC S5 INITIAL CONDITIONS: The Unit is in Mode 1. EDG No. 1 is running and carrying the loads on 4KV Bus "1AE". Normal 4KV Bus "1A" is energized from the Unit Station Service Transformer. ACB 1 El 2 is closed and the 4KV normal to emergency tie breakers, 1Al0 and 1 E7 are open.

INITIATING CUE: The Unit Supervisor directs you to transfer Bus "IAE" to Bus "lA" and shutdown EDG No. 1 in accordance with 1OM-36.4.Q.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, S1)

Facility: BVPS Unit 1 Task No: 0341-003-01-013 Task

Title:

Start A Containment Instrument Air JPM No: 2002 NRC S6 Compressor K/A

Reference:

078 K3.01 (3.1/3.4) 078 A3.01 (3.1/3.1)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: ____ Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A LOCA has just occurred resulting in a Reactor Trip, Safety Injection, and Containment Phase A and Phase B Isolation. The stub busses have been reenergized following the CIB. Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization is in progress. 1 IA-C-1 B, CNMT Instrument Air Compressor is on clearance.

Task Standard: Start 1 IA-C-IA, CNMT Instrument Air Compressor in accordance with 1OM-53A.l .ES-1.2.

Required Materials: None General

References:

1OM-53A.1 .ES-1.2, Post LOCA Cooldown And Depressurization, Issue 1C, Rev. 3 Handouts: 1OM-53A.1.ES-1.2, Issue 1C, Rev. 3 Tools: None Initiating Cue: The Unit Supervisor directs you to perform Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization to restore containment instrument air.

Time Critical Task: NO Validation Time: 15 minutes

Appendix C Page 2 of 7 Form ES-C-1 (R8, Si)

JOB PERFORMANCE MEASURE Start A Containment Instrument Air Compressor 2002 NRC S6 Simulator Setup Information Setup: Initialize IC-87.

Place YCT w/Red Slash on C/S for 1 IA-C-1 B.

Appendix C Page 3 of 7 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Start a Containment Instrument Air Compressor 2002 NRC S6 (Denote critical steps with an asterisk) Start Time:

Performance Step 1: CNMT Instr Air Compressor - AT LEAST ONE RUNNING.

(Step 4.a)

Standard: Candidate verifies that no compressors are running.

Comments:

Performance Step 2: Check at least one chiller [1 VS-E-3A, B, C] in service.

(Step 4.a.1 RNO)

Standard: Candidate checks annunciators are clear, or dispatches Turbine Bldg.

Operator to check chiller status.

CUE: Report as Turbine Bldg. Operator that 1VS-E-3A is in service.

Comments:

Performance Step 3: Open [TV-1 CC-i 1OD, F2], CNMT Recirc CIg Coils AC/RW Outlet (Step 4.a.2 RNO) CNMT Isol Vlv.

Standard: Candidate locates valve control switches and places to Open position.

a Verifies red lights are ON and green lights are OFF.

Comments:

Appendix C Page 4 of 7 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Start a Containment Instrument Air Compressor 2002 NRC S6

  • Performance Step 4: Open [TV-1 CC-1 1 0E2, E3], CNMT Recirc CIg Coils AC Sys Inlet (Step 4.a.3 RNO) CNMT Isol Vlvs.

Standard: Candidate locates valve control switches and places to Open position.

0 Verifies red lights are ON and green lights are OFF.

Comments:

  • Performance Step 5: Start an available [1 IA-C-1A (B)] CNMT Instr Air Compressor.

(Step 4.a.4 RNO)

Standard: Candidate locates 1 IA-C-1A control switch and places to Start position.

E Verifies red light is ON.

Comments:

Performance Step 6:

Performance Step 6: If available, place the standby CNMT Instr Air Compressor in AUTO.

(Step 4.a.5 RNO)

Standard: No action required. [1 IA-C-1 B] is on clearance (JPM Initial Conditions)

Comments:

Appendix C Page 5 of 7 Form ES-C-1 (R8, Sl)

PERFORMANCE INFORMATION Start a Containment Instrument Air Compressor 2002 NRC S6 Performance Step 7: CNMT instrument air header pressure on [PI-1 IA-106A] - GREATER (Step 4.b) THAN 85 psig.

Standard: Candidate checks instrument air header pressure > 85 psig, or Annunciator [A6-1 10] is not lit.

Comments:

Terminating Cue: When the Candidate determines that containment instrument air pressure is increasing, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 6 of 7 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Start a Containment Instrument Air Compressor 2002 NRC S6 JPM No.: 2002 NRC S6 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 7 of 7 Form ES-C-1 (R8, S1)

JPM CUE SHEET 2002 NRC S6 INITIAL CONDITIONS: A LOCA has just occurred resulting in a Reactor Trip, Safety Injection, and Containment Phase A and Phase B Isolation. The stub busses have been reenergized following the CIB. Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization is in progress. 1 IA-C-1 B, CNMT Instrument Air Compressor is on clearance.

INITIATING CUE: The Unit Supervisor directs you to perform Step 4 of ES-1.2, Post LOCA Cooldown and Depressurization to restore containment instrument air.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, SI)

Facility: BVPS Unit 1 Task No: 0063-021-06-013 Task

Title:

Place Overpressure Protection JPM No: 2002 NRC S7 System In Service K/A

Reference:

2.2.12 (3.0/3.4)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: ____ Actual Performance X Classroom: Simulator: X Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is performing a cooldown to Mode 5 and has stabilized in Mode 4 to place OPPS in service.

Valves 1 RC-1, 1 RC-28 and 1 RC-200 have been verified open from the Control Room status prints. PT-1 RC-402 and 403 are in service.

Task Standard: Satisfactorily stroke PCV-1 RC-455C, Pressurizer PORV in accordance with 1 OST-6.8.

Required Materials: Stopwatch Keys for OPPS switches General

References:

1OST-6.8, Placing Overpressure Protection System (OPPS) In Service, Rev. 12 Handouts: 1 OST-6.8, Rev. 12 (marked up copy)

Tools: None Initiating Cue: The Unit Supervisor directs you to perform a stroke test of PCV-1 RC-455C, PRZR PORV Relief Valve in accordance with Sections VII.B and VlI.C of 1OST-6.8. The Initial Conditions are complete and all test preparations have been performed.

Time Critical Task: NO Validation Time: 20 minutes

Appendix C Page 2 of 9 Form ES-C-1 (R8, S1)

JOB PERFORMANCE MEASURE Place Overpressure Protection System In Service 2002 NRC S7 Simulator Setup Information Setup: Initialize IC-88.

Setup SPDS to display the following points:

[UZ2006], MOV-1 RC-535

[PCV-1 RC-455C-2]

When directed, act as the STA to monitor computer points and respond to Candidate requests for valve positions.

Appendix C Page 3 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 (Denote critical steps with an asterisk) Start Time:

Evaluator Note: Provide Candidate with a stopwatch, 2 - Key #6 Stp 1:for Perfrmane OPPS switches and a copy of 1OST-6.8.

Performance Step 1: Verify [PT-1 RC-402 and 403], RCS Wide Range Pressure, are in (Step VII.B.1) service by one of the following.

Standard: No action required. Step is N/A per JPM Initial Conditions.

Comments:

Performance Step 2: Verify nitrogen supply pressure for Overpressure Protection System Performance Step 2: Verify nitrogen supply pressure for Overpressure Protection System (Step VII.B.2) is > 600 psig.

Standard: Candidate verifies annunciators A4-7 and A4-8 are OFF.

Comments:

Performance Step 3: Ensure [MOV-1 RC-537] PRZR PORV Isol MOV, is open to provide a Performance Step 3: Ensure [MOV-1 RC-537] PRZR PORV Isol MOV, is open to provide a (Step VII.C.1) flowpath to [PCV-1 RC-455D].

Standard: Candidate verifies valve red light is ON and green light is OFF.

Comments:

Appendix C Page 4 of 9 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 4: Verify SPDS Computer Point [UZ2006] PRZR PORV ISOL VLV, (Step VII.C.2) indicates [MOV-1 RC-535] OPEN.

Standard: Candidate verifies computer point indicates valve is open.

Evaluator Note: Inform Candidate that STA will monitor computer points on SPDS.

Comments:

  • Performance Step 5: Close [MOV-1 RC-535], PRZR PORV Isol MOV.

(Step VII.C.3)

Standard: Candidate locates valve control switch and places to Close position.

s Verifies green light is ON and red light is OFF.

Comments:

Performance Step 6: As [MOV-1 RC-535], PRZR PORV Isol MOV, is closing, verify Performance Step 6: As [MOV-1 RC-535], PRZR PORV Isol MOV, is closing, verify (Step VII.C.4) [UZ2006] indicates [MOV-1 RC-535] INTER position.

Standard: Candidate verifies computer point indicates INTER position.

Comments:

Appendix C Page 5 of 9 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 7: Verify SPDS Computer Point, [UZ2006], PRZR PORV Isol Vlv MOV (Step VII.C.5) RC535, indicates [MOV-1 RC-535] CLOSED.

Standard: Candidate verifies computer point indicates CLOSED position.

Comments:

Performance Step 8: Verify SPDS Computer Point [PCV-i RC-455C-2], PRZR PORV, Performance Step 8: Verify SPDS Computer Point [PCV-1 RC-455C-2], PRZR PORV, (Step VII.C.6) indicates CLSD.

Standard: Candidate verifies computer point indicates CLSD position.

Comments:

Performance Step 9:

Performance Step 9: Verify [PI-1 IA-1 06A], Containment Instrument Air Receiver pressure (Step VII.C.7.a) is > 95 psig.

Standard: Candidate locates [PI-i IA-1 06A].

E Verifies pressure > 95 psig.

Comments:

Appendix C Page 6 of 9 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7

  • Performance Step 10: Open AND time [PCV-1RC-455C], PRZR PORV Relief VIv.

(Step VII.C.7.b.1)

Standard: Candidate locates valve control switch.

"* Opens and times using stopwatch.

"* Verifies red light is ON and green light is OFF.

Comments:

Performance Step 11: Verify SPDS computer point [PCV-1RC-455C-2], PRZR PORV, (Step VII.C.7.b.2) indicates NT CLSD.

Standard: Candidate verifies computer point indicates NT CLSD position.

Comments:

  • Performance Step 12: Close [PCV-1 RC-455C], PRZR PORV Relief Vlv.

(Step VlI.C.7.b.3)

Standard: Candidate locates valve control switch and positions to Close.

Verifies green light is ON and red light is OFF.

Comments:

Appendix C Page 7 of 9 Form ES-C-1 (R8, S)

PERFORMANCE INFORMATION Place Overpressure Protection System In Service 2002 NRC S7 Performance Step 13: Record the opening stroke time of [PCV-1RC-455C], PRZR PORV (Step VII.C.7.b.4) Relief Vlv, on Data Sheet 1.

Standard: Candidate records opening time on Data Sheet 1.

Comments:

  • Performance Step 14: Place [PCV-1 RC-455C], PRZR PORV Relief Vlv, control switch to (Step VII.C.7.b.5) AUTO.

Standard: Candidate locates control switch and places to AUTO position.

Comments:

  • Performance Step 15: When [PCV-1 RC-455C], PRZR PORV Relief Vlv, is closed, THEN (Step VII.C.7.b.6) open [MOV-1 RC-535], PRZR PORV Isol MOV.

Standard: Candidate locates control switch and places to Open position.

  • Verifies red light is ON and green light is OFF.

Comments:

Terminating Cue: When the Candidate verifies [MOV-1 RC-535] is open, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 8 of 9 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Place Overpressure Protection System In Service 2002 NRC S7 JPM No.: 2002 NRC S7 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator: N/A Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 9 of 9 Form ES-C-1 (R8, Si)

JPM CUE SHEET 2002 NRC S7 INITIAL CONDITIONS: The plant is performing a cooldown to Mode 5 and has stabilized in Mode 4 to place OPPS in service.

Valves 1 RC-1, 1 RC-28 and 1 RC-200 have been verified open from the Control Room status prints. PT-1 RC-402 and 403 are in service.

INITIATING CUE: The Unit Supervisor directs you to perform a stroke test of PCV-1 RC-455C, PRZR PORV Relief Valve in accordance with Sections VII.B and VII.C of 1OST-6.8. The Initial Conditions are complete and all test preparations have been performed.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, S1)

Facility: BVPS Unit 1 Task No: 0241-028-01-013 Task

Title:

Startup The Dedicated AFW JPM No: 2002 NRC P1 PumP K/A

Reference:

061K1.07 (3.6/3.8) 061A3.01 (4.2/4.2) 009EK3.22 (4.4/4.5)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: X Actual Performance:

Classroom: Simulator: Plant: X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The Control Room is performing EOP FR-H.1, Response To Loss Of Secondary Heat Sink. A plant fire has disabled all 3 AFW pumps.

1FW-P-4, Dedicated AFW Pump is available and aligned to 1WT-TK-11. ERF Substation 4160V Bus "11H" is energized from offsite power. The ERF diesel is not running.

Task Standard: 1FW-P-4, Dedicated AFW Pump is started in accordance with EOP Attachment 2-K.

Required Materials: None General

References:

1OM-53A.1.2-K, Dedicated AFW Pump [1 FW-P-4] Startup, Issue 1 C, Rev. 0.

Handouts: 1OM-53A.1.2-K, Issue 1 C, Rev. 0 Tools: None Initiating Cue: The Unit Supervisor directs you as an extra Operator on shift to startup 1 FW-P-4, Dedicated AFW Pump in accordance with steps 4 through 13 of EOP Attachment 2-K.

Time Critical Task: NO Validation Time: 20 minutes

Appendix C Page 2 of 8 Form ES-C-1 (R8, S)

JOB PERFORMANCE MEASURE Startup The Dedicated AFW Pump 2002 NRC P1 Simulator Setup Information

Appendix C Page 3 of 8 Form ES-C-1 (R8, S)

PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1 (Denote critical steps with an asterisk) Start Time:

Evaluator Note: All steps are performed from the Main Feed Reg. Valve Room, except Step 10 which is performed from the Turbine Bldg. basement.

  • Performance Step 1: At DAFW Pump Control Panel [PNL-DAFWP1], Place the LOCAL (Step 4) TEST Switch to LOCAL and the ON-OFF Panel Switch to ON to energize the panel.

Standard: Candidate locates panel control switch and indicates placing to LOCAL position.

Comments:

Performance Step 2:

Performance Step 2: Check Closed [MOV-1 FW-1 60], DAFW [1 FW-P-4] Discharge Isol.

(Step 5)

Standard: Candidate locates valve position indicating lights.

V Indicates verifying green light is ON.

CUE: [MOV-1FW-160] is closed.

Comments:

Performance Step 3:

Performance Step 3: Establish communications with the Control Room.

(Step 6)

Standard: Candidate indicates method of contacting the Control Room.

CUE: Communications established.

Comments:

Appendix C Page 4 of 8 Form ES-C-1 (R8, S)

PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1

  • Performance Step 4: Start [1 FW-P-4], Dedicated AFW Pump (Step 7)

Standard: Candidate locates control switch and indicates taking out of P-T-L and placing to Start position.

Indicates verifying red light is ON.

Comments:

  • Performance Step 5: Open [MOV-1 FW-1 60], DAFW [1 FW-P-4] Discharge Isol.

(Step 8)

Standard: Candidate locates control switch and indicates placing to Open position.

  • Indicates verifying red light is ON.

Comments:

Performance Step 6: Reset FWI (Both Trains).

(Step 9)

Standard: Contacts the PO in the Control Room to reset FWI.

CUE: FWI is reset on both trains.

Evaluator Note: Step is performed from the Control Room.

Comments:

Appendix C Page 5 of 8 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1 Performance Step 7: Open [MOV-1 FW-1 56A, B, C], 1A, 1 B, 1 C SG Main FW Cnmt Isol.

(Step 10) Vlvs.

Standard: Contacts P0 in the Control Room to open valves.

CUE: All valves are open.

Evaluator Note: Step is performed from the Control Room.

Comments:

Performance Step 8: Throttle [FCV-1 FW-479, 489, 499], 1 A, 1 B, 1C SG FW Bypass FCVs.

(Step 11)

Standard: Contacts P0 in the Control Room to throttle valves.

CUE: All valves are throttled.

Evaluator Note: Step is performed from the Control Room.

Comments:

Performance Step 9:

Performance Step 9: Verify pump suction and discharge flow rises as indicated on (Step 12) [Fl-1 FW-155B, 156].

Standard: Candidate locates Fl-1 FW-1 55B and 156.

CUE: Flow is approximately 300 gpm and rising.

Comments:

Appendix C Page 6 of 8 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Startup The Dedicated AFW Pump 2002 NRC P1 Performance Step 10: At [PNL-DAFWP2], Place the ON-OFF Switch to ON (Step 13.a) (Turbine Bldg - 693').

Standard: Candidate locates panel control switch and indicates placing to ON position.

CUE: All pump parameters are satisfactory.

Comments:

Terminating Cue: When the Candidate verifies pump flow, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 7 of 8 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Startup The Dedicated AFW Pump 2002 NRC P1 JPM No.: 2002 NRC P1 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 8 of 8 Form ES-C-1 (R8, 1)

JPM CUE SHEET 2002 NRC P1 INITIAL CONDITIONS: The Control Room is performing EOP FR-H.1, Response To Loss Of Secondary Heat Sink. A plant fire has disabled all 3 AFW pumps.

1FW-P-4, Dedicated AFW Pump is available and aligned to 1WT-TK-11. ERF Substation 41 60V Bus "1H" is energized from offsite power. The ERF diesel is not running.

INITIATING CUE: The Unit Supervisor directs you as an extra Operator on shift to startup 1 FW-P-4, Dedicated AFW Pump in accordance with steps 4 through 13 of EOP Attachment 2-K.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0201-004-01-013 Task

Title:

Respond To Spent Fuel Pool JPM No: 2002 NRC P2 Low Level Alarm K/A

Reference:

033K1.05 (2.7/2.8) 033K4.01 (2.9/3.2)

Examinee: NRC Examiner: ________

Facility Evaluator: N/A Date:

Method of Testinq:

Simulated Performance: X Actual Performance:

Classroom: Simulator: Plant: X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Annunciator [A6-3], SPENT FUEL POOL LEVEL LOW has just alarmed. Makeup is required to restore SFP level and clear the alarm. An Operator has been dispatched to observe level. The RWST level is at 50 feet and is not on recirculation purification.

Complete the actions to restore SFP level in accordance with Task Standard:

1OM-20.4.AAC.

Required Materials: None General

References:

1OM-20.4.AAC, Spent Fuel Pool Level Low, Rev. 8 Handouts: 1OM-20.4.AAC, Rev. 8 Tools: None Initiating Cue: The Unit Supervisor directs you as an extra Operator on shift to coordinate with the PO to add water to the Spent Fuel Pool from the RWST in accordance with 1OM-20.4.AAC.

Time Critical Task: NO Validation Time: 20 minutes

Appendix C Page 2 of 7 Form ES-C-1 (R8, Si)

JOB PERFORMANCE MEASURE Respond To Spent Fuel Pool Low Level Alarm 2002 NRC P2 Simulator Setup Information

Appendix C Page 3 of 7 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Respond To Spent Fuel Pool Low Level Alarm 2002 NRC P2 (Denote critical steps with an asterisk) Start Time:

Performance Step 1: Initiate makeup from the RWST by performing the following:

(Step 3.a.1)

  • Verify Closed or Close [1 PC-1 18], Pri Water Sup To Spent Fuel Pool Isol.

Standard: Candidate locates valve and indicates method of verifying valve is in the closed position.

CUE: [1 PC-1 18] is closed.

Comments:

Performance Step 2: Initiate makeup from the RWST by performing the following:

(Step 3.a.2)

  • Verify Closed or Close [1 PC-1 46], Fuel Pool Purification Sys To RWST Recirc Sys Isol.

Standard: Candidate locates valve and indicates method of verifying valve is in the closed position.

CUE: [1PC-146] is closed.

Comments:

  • Performance Step 3: Initiate makeup from the RWST by performing the following:

(Step 3.a.3)

  • Open [1QS-37], Refuel Water to Fuel Pool Isol.

Standard: Candidate locates and indicates opening valve.

CUE: [1QS-37] is stuck closed and will NOT open.

Evaluator Note: If Candidate requests direction, inform that the Shift Manager directs adding primary grade water to the fuel pool.

Comments:

Appendix C Page 4 of 7 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Respond To Spent Fuel Pool Low Level Alarm 2002 NRC P2 Note: The following steps represent the alternate path for this JPM.

Performance Step 4: Add primary grade water to the fuel pool as follows:

(Step 3.c.1) Stop any running [1QS-P-2A (2B)], Refueling Water Recirculating Pump to prevent dead heading.

Standard: No action required. (RWST is not on recirculation purification per JPM Initial Conditions.)

Comments:

Performance Step 5:

Performance Step 5: Add primary grade water to the fuel pool as follows:

(Step 3.c.2)

  • Using Control Room Status Prints, Check Open [1BR-543], Pri Makeup to Fuel Pool CIg Isol.

Candidate requests PO to check valve position using Control Room Standard:

Status Prints.

CUE: [1 BR-543] is open.

Comments:

Performance Step 6: Add primary grade water to the fuel pool as follows:

Performance Step 6: Add primary grade water to the fuel pool as follows:

(Step 3.c.3)

  • Verify Closed or Close [1QS-37], Refuel Water to Fuel Pool Isol.

Standard: No action required. (Valve previously cued as stuck closed in step 3.)

Comments:

Appendix C Page 5 of 7 Form ES-C-1 (R8, S1)

PERFORMANCE INFORMATION Respond To Spent Fuel Pool Low Level Alarm 2002 NRC P2 Performance Step 7: Add primary grade water to the fuel pool as follows:

(Step 3.c.4)

  • Verify Closed or Close [1 PC-146], Fuel Pool Purification Sys To RWST Recirc Sys Isol.

Standard: No action required. (Valve previously verified closed in step 2.)

Comments:

  • Performance Step 8: Add primary grade water to the fuel pool as follows:

(Step 3.c.5)

  • Open [1 PC-1 18], Pri Water Sup To Spent Fuel Pool Isol.

Standard: Candidate locates and indicates method of unlocking and opening valve.

CUE: [1 PC-1 18] is open.

Comments:

  • Performance Step 9: Add primary grade water to the fuel pool as follows:

(Step 3.c.6)

  • Throttle Open [1 PC-145], Fuel Pool CIg Sys to RWST Recirc lsol.

Standard: Candidate locates and indicates throttling open valve.

CUE: [1PC-145] is throttled open.

CUE: As PO, inform Candidate that SFP level is slowly rising.

Comments:

Terminating Cue: When the Candidate completes the lineup to add makeup water to the SFP, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 6 of 7 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Respond To Sient Fuel Pool Low Level Alarm 2002 NRC P2 JPM No.: 2002 NRC P2 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 7 of 7 Form ES-C-1 (R8, S1)

JPM CUE SHEET 2002 NRC P2 INITIAL CONDITIONS: Annunciator [A6-3], SPENT FUEL POOL LEVEL LOW has just alarmed. Makeup is required to restore SFP level and clear the alarm. An Operator has been dispatched to observe level. The RWST level is at 50 feet and is not on recirculation purification.

INITIATING CUE: The Unit Supervisor directs you as an extra Operator on shift to coordinate with the PO to add water to the Spent Fuel Pool from the RWST in accordance with 1OM-20.4.AAC.

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 (R8, Si)

Facility: BVPS Unit 1 Task No: 0011-021-01-013 Task

Title:

Locally Trip The Reactor JPM No: 2002 NRC P3 K/A

Reference:

001 K6.03 (3.7/4.2) 001A2.13 (4.4/4.6)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testing:

Simulated Performance: X Actual Performance:

Classroom: Simulator: Plant: X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A Unit trip has just been announced. The operating crew has entered FR-S.1, Response To Nuclear Power Generation - ATWS after efforts to manually trip the reactor from the Control Room proved unsuccessful.

Task Standard: The reactor is locally tripped in accordance with EOP FR-S.1.

Required Materials: None General

References:

1OM-53A.1 .FR-S.1, Response To Nuclear Power Generation ATWS, Issue 1C, Rev. 2 Handouts: 1OM-53A.1 .FR-S.1, Issue 1 C, Rev. 2 Tools: None Initiating Cue: The Unit Supervisor directs you as an extra Operator on shift to locally trip the reactor in accordance with EOP FR-S.1, Step 1.

Time Critical Task: NO Validation Time: 10 minutes

Appendix C Page 2 of 5 Form ES-C-1 (R8, Si)

JOB PERFORMANCE MEASURE Locally Trip The Reactor 2002 NRC P3 Simulator Setup Information

Appendix C Page 3 of 5 Form ES-C-1 (R8, Si)

PERFORMANCE INFORMATION Locally Trip The Reactor 2002 NRC P3 (Denote critical steps with an asterisk) Start Time:

Evaluator Note: Remind Candidate to simulate all actions and NOT to touch the reactor trip pushbuttons.

(Step 1.e RNO)

Standard: Candidate locates each breaker and indicates pressing the pushbutton to trip the breaker.

CUE: Both reactor trip breakers fail to open.

Comments:

Note: The following step represents the alternate path for this JPM.

  • Performance Step 2: Open rod drive MG sets output breakers.

(Step 1.e RNO)

Standard: Candidate locates each MG set output breaker and indicates turning the handle to open the breaker.

CUE: Both rod drive MG sets output breakers are open.

Comments:

Terminating Cue: When the Candidate simulates opening the rod drive MG set breakers, the evaluation for this JPM is complete.

Stop Time:

Appendix C Page 4 of 5 Form ES-C-1 (R8, Si)

VERIFICATION OF COMPLETION Locally Trip The Reactor 2002 NRC P3 JPM No.: 2002 NRC P3 Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's signature and date:

Appendix C Page 5 of 5 Form ES-C-1 (R8, S$)

JPM CUE SHEET 2002 NRC P3 INITIAL CONDITIONS: A Unit trip has just been announced. The operating crew has entered FR-S.1, Response To Nuclear Power Generation - ATWS after efforts to manually trip the reactor from the Control Room proved unsuccessful.

INITIATING CUE: The Unit Supervisor directs you as an extra Operator on shift to locally trip the reactor in accordance with EOP FR-S.1, Step 1.