IR 05000333/1989014
| ML20246C422 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 08/15/1989 |
| From: | Dexter T, Keimig R, Olsen W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20246C421 | List: |
| References | |
| 50-333-89-14, NUDOCS 8908240380 | |
| Download: ML20246C422 (7) | |
Text
-
_,
bdvibb )Y$3!$ %,
Ni;fg
~
$-
j
' ypug)7 f GIG. L4)f
.,
?jgtjsg f *'
E-17-l'9 f. pncamZ?J:CC)
c.;.
PAW l
h U.S. NUCLEAR REGULATORY COMMISSION
,
E REGION I-y Report No. - 50-333/89-14 Docket No. 50-333 License No.-
DPR-59-Priority-Category
-
-
L.icensee:
Power Authority of the State of New York 10 Columbus Circle-New York, New York'10019 Facility Name: James A. Fit: Patrick Nuclear Power Plant Inspection At: Scriba, New York.
~
Inspection Conducted: July 10-14,'1989 (Type of Inspection: -Routine, Unannounced Physical Security Inspection Inspectors:
1/(flm T-8-/f-P9 W. T. Olsen,. Reactor Engineer / Physical Security
- date
/v Z
h~/>
V c,-
T. W.. Dexter, Physical Se' cur'ity Inspector
. date Approved by:
[-/f-[h
'
fichardR.Dimig Chief, Safeguards,Section date
Facilities Rac}r ion Safety and Safeguards Branch
-
Inspection Summary: Unannounced, Physical Security Inspection on July 10-14,1989 (Report No. 50-333/89-14)
Areas ~ Inspected: Security Plan and Implementing Procedures, Security
'
Organization, Physical Barriers - Protected Area, Physical Barriers - Vital Areas, Assessment Aids, Alarm Stations, and the status of previously identified: items.
Results:.The licensee was in compliance with NRC requirements in the areas examined.
s908240380 890817 ADOCK0500gg3
,PDR
.
_ _ _ _ _ _
-
-. _ _ _. - _ _ _ _ _ _ _ _ _ _ _ _. _ -
.____.__.._____.-.____._______m__
____.m_______
_ _ _ _. _ _ _ _. _. _ _ _ _ _ _ _ _ _ _. _ _
--.
fyl:<
2. * :
'
,
~y'3-
[ (li l
-
i
' i
,
i
.
DETAILS
'
1.
Key Persons Contacted
,
'
!
'
l Licensee Personnel i
- W. Fernandez, Resider.t Manager i
- T. Teifke, Security / Safety / Fire Protection Superintendent i
- J. Haley, Security Supervisor
- M. Warchol, Security Shift Coordinator
- E. Sackman, Manager of Security Compliance
\\
U.S. Nuclear Reculatory Commission (NRCJ l
i
- R. Plasse, USNRC, Resident Inspector
!
I
The inspectors also interviewed other licensee personnel and member of the
{
proprietary guard force.
'
' Indicates those present at the exit interview.
- Indicates those.present at the entrance interview.
- 2.
Licensee Action on Previously Identified Items j
a.
(Closed) UNF 50-333/88-19-02 I
,
The inspectors reviewed Licensee Event Report 88-501-00, dated
July 12,1988, which dealt with a degradation of the intrusion detection I
- and access control systems. According to the report, on June 12, 1988, i
at 8:21 p.m., the licensee experienced significant protected area intrusion detection system (IDS) and access control degradation for a
. period of 35 minutes.
Security personnel, on-site at the start of i,
~
the event, provided compensatory action. All protected area intrusion
detection zones, protected area access points and vital area access points were affected.
However, no records could be found that documented either the time that compensatory actions were taken or what measures were actually implemented.
Security Procedure 5.1.4, Compensatory
.l l'
Measures, provided general guidance, but the specific compensatory
!
measures to be implemented were left to the discretion of the security shift supervisor.
,
l THIS PARARRAPil CMTAIRS SAFEREEDS EF0FidM!91 AE313 !!0T FGR RBilC D'$010$ lie II15 inEhTIMALLY LEFi BLAK i
e t
.
--_______.---__________-_-_--__-5
'
'
Sp@w i
4*E,*
,
.
c
.
A
Tills PARAM!Jil CGUAiWS SAFE!!EDS I!HREi!Si MD IS HGT F0i! FGLIC 0:$0 LOST 91, IT IS lhTENii3 Ally LEiT BLIM.
3.
Management Support, Security program Plans, and Audits Management Support - Management support for the licensee's physical a.
security program was determined to be adequate by the inspectors.
This determination was based upon the inspectors' reviews of various aspects of-the licensee's program during this inspection as documented in this report.
b.
Security Program ple_ns - The inspectors verified that. changes to the licensee's Security, Contingency, and Guard Training and Qualification Plans, as implemented, did not decrease the effectiveness of the respective plan, and had been submitted in accordance with NRC requi rements.
<
However, as noted during the previous security inspections, the inspectors found that several areas of the security, contingency, and
-. Training and Qualifications plans still contained out-dated information. The licensee was in the process of updating the plans, but it appears that the revision process is slow. The licensee's security management committed to looking into ways to expedite this process. This matter will be reviewed by Region I inspectors in
' subsequent inspections.
c.
Audits - The inspectors reviewed the 1987 and 1988 annual security program audit reports and verified that the audits had been conducted in accordance with the Security Plan (the Plan). The
.
audits were comprehensive in scope with the results reported to the
'
appropriate levels of management. The inspectors' review included the response'of the security organization to the audit findings and the corrective action taken to remedy any adverse findings. The documented corrective actions appeared appropriate for the findings.
4.
protected and Vital Area Physical Barriers, Detection and Assessment Aids a.
Protected Area Barriers - The inspectors conducted a physical inspection of the protected area (PA) barrier on July 11, 1989. The inspectors determined, by observation, that the barriers were installed and l
l maintained as describe 6 in the Plan.
155 PAHMAPfl COEA!NS SAFBilHDS j
li!FHMATiSN M3 IS HDI FOR PRUC DiSOLOSRE, IT IS IkTEhTIDRlLY LEFTBLAK LL__---___________--_-_
_
-
_
gi.g. ;
...
s_
.
..
-._
.. _ _
. -
-
-
... _..
--_ _ _ _.
.ikhg%
'
me x
- ,
.
p
y g
4-
,
'
b.
Protected Ares Detection Aids - The ' inspectors observed the PA perimeter detection aids on July 11-12, 1989 and determined that they were generally installed, maintained and operated as committed to in the' Plan.
THIS PARAGitAPil CORAINS SAIGUEDS liiFDPRA119X MD 15 liGT FOR PilBilC DISCLOSURE, IT IS liiiEEl0NALLY L
ttFT sLAE c.
- Isolation Zones - The inspectors verified that isolation zones were adequately maintained to permit observation of activities on both sides of the PA barrier.
d.
Protected Area and Isolation Zone Lighting - The inspectors conducted a lighting survey of the PA and isolation zones on July 11,1989.
The inspectors determined,.by observation, that the-lighting in the PA'and isolation zones was adequate.
L e.
' Assessment Aids - The inspectors observed the PA perimeter assessment aids and determined that they were installed and operated
.
-as committed'to in the Plan.
Tics PRMPai 00%ms mMMS IG0F21 TIN E3is ETFM PiEUG
'
EF2t0W,li B tsi!siisEWr LRT MMI.
i 5.
Protected and Vital Area Access Control of Personnel, Packages and Vehicles a.
The inspectors determined that the licensee was exercising positive control over personnel access to the PA and the vital areas (VAs).
L This determination was based on the following:
,
i l
li__
__
_ _ _ _ _. _
. _. _ _ _
_
_ _. _ _ _
___
__ _____________.___ ____. __ _
.._ __... _ ___ _____________ _ _ _ ___ _ _ _ _ _.___ d
'
,
-
-
y
I '
"f3
-
'A
.
,
,
'5 t
J f
b H
!!)' ~ The inspectors verified that personnel are properly identified
,
'andlthat authorization is checked prior to issuance of badges
-
and key-cards.
n 2)
The -inspectors verified that the: licensee has a prograin to -
confirm the trustworthiness and reliability of employees and contractor personnel.. This program includes checks on employment history, criminal history, and a psychological examination.
3)-
The inspectors verified that the licensee has a fitness for duty program in place..A drug testing program has been implemented and -individuals are tested. annually,' or for cause.
4) ' The inspectors reviewed the security lock.and key procedures
-. i and determined that they were consistent with commitments in the Plan. The inspectors also reviewed the PA and VA key'
.
inventory. logs, and discussed lock and key procedures with members of _the security force'and the licensee's security
,
staff. No deficiencies were noted.
5)
The inspectors verified that the licensee takes precautions.to ensure that only authorized individuals can be added to the access'. list by having a member of management. review the list every 31 days and by limiting the access computer program' to-three essential individuals..
6)
The inspectors verified that the licensee.has a search program, as committed to in the Plan, for firearms, explosives, incendiary
. devices and other unauthorized materials. The inspectors observed personnel access processing during shift changes and visitor
~
access processing, and interviewed members of the security force and licensee's security staff about personnel access procedures. No deficiencies were noted.
7)
The: inspectors determined, by observation, that individuals in the PA and VAs display their access badges as required.
8)
The inspectors verified that the licensee has escort procedures for visitors to the PA and VAs.
9)
The inspectors verified that the licensee has provisions for ensuring prompt access to vital equipment during emergencies and that the provisions are adequate for their purpose.
10) The inspectors verified that unescorted access to VAs is limited to authorized individuals.
The VA access list is revalidated at least once every 31 days as committed to in the Plan.
,
I l
_ _ _ _ _ _. _ _ _ _ _ _ _.. _. _ _ _.. _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _ _ _
___ -
-__
_
_
-
a pkkW
-
i
_
l qq L
.
,
.,
6 i
,
l THIS PARAGRAPH CONTA!NS SAFEBUARDS INFORETISH AMD IS NOT FOR PilBLIC D!SOLOSlRE, li 13 INMil0NALLY -
LEFT RA E b.
' The inspectors determined that the licensee _was' exe'rcising positive control over packages and material that are brought into the PA.
The inspectors reviewed the package and material control procedures and found that they were consistent with commitments in the Plan.
The inspectors also observed package and material processing and interviewed members of the security force and the licensee's security staff about package and material control procedures; No deficiencies were noted.
c..
The ~ inspectors determined that the licensee properly controls vehicle access to and within the PA. The inspectors veri 9 ed that vehicles are properly processed prior to entering tne PA.
The process was consistent with commitments in the Picn The i.noecta-: =150 reviewed the vehicle search procedures and determined that they were consistent with commitments in the Plan.
This determination was made by observing vehicle processing and search, inspection of vehicle logs, and by
.
' interviewing members of the security force and licensee's security staff about vehicle processing and search procedures.
6.
Alarm Stations and Communications a.
The inspectors observed the operation of the Central Alarm Station (CAS) and the Secondary Alarm Station (SAS) and determined that they were maintained and operated as committed to in the Plan. CAS and SAS operators.were interviewed by the inspectors and found to be knowledgeable of their duties and responsibilities. The inspectors
verified that the CAS and SAS do not contain any operational activities
,
that would interfere with the assessment and response functions.
_!
b.
The inspectors observed tests of all communications capabilities in both the CAS and the SAS and reviewed the testing records for the communications channels. All were found to be as committed ts ;n the Plan.
j 7.
Emergency Power Supply The' inspectors verified that there are several systems (batteries, a.
dedicated diesel generator, and plant on-site AC power) that provide l
'
_ _ _.
-
_
_
. _ _ _ _ _ _
___
_ _ _ _ _
_
_ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_________
_
_
_ _ _
-
i
.
..i
. e
,,
i
!
back-up power to the security systems and reviewed the accompanying test and maintenance procedures for these systems.
The systems and procedures were consistent with the Plan. The batteries, battery chargers and the diesel generators are located in locked areas.
b.
The inspectors verified that the door access control system fer VAs will permit emergency ingress and egress when normal power is lost.
8.
Testing, Maintenance and Compensatory Measures a.
The inspectors reviewed testing and maintenance records and confirmed that the records committed to in the Plan were on file and readily available for NRC review. The station provides instrumentation and controls technicians to repair / replace and test any security equipment that requires corrective maintenance. A check of maintenance records indicated that repairs / replacements and testing have been accomplished in a timely manner, b.
The inspectors reviewed the licensee's use of compensatory measures and determined them to be as committed to in the Plan.
9.
Security Training and Qualification The security inspectors randomly selected and reviewed the training and qualification records for ten security officers (S0s). The inspector found that, in eight of the ten records reviewed, the period for completion of physical examinations or requalification training exceeded the twelve months for annual decertification required by the Training and Qualification Plan for short periods of time. Upon further review, the inspectors found that the licensee's training section was not using a suspense system to alert supervisors of upcoming recertifications. The licensee committed to establishing an effective suspense system to resolve the problem. This matter will be reviewed during the next inspection.
10.
Exit Interview The inspectors met with the licensee representatives indicated in paragraph 1 at the conclusion of the inspection on July 14, 1989. At the time, the purpose and scope of the inspection were reviewed and the findings were presented.
At no time during this inspection was written material provided to the licensee by the inspectors.