February 18, 2020
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000327/2020410 AND 05000328/2020410
Dear Mr. Barstow:
On January 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Matthew Rasmussen and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
James C. Shehee, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000327 and 05000328
License Numbers:
Report Numbers:
05000327/2020410 and 05000328/2020410
Enterprise Identifier: I-2020-410-0013
Licensee:
Tennessee Valley Authority
Facility:
Sequoyah Nuclear Plant, Units 1 and 2
Location:
Soddy Daisy, TN
Inspection Dates:
January 27, 2020 to January 30, 2020 (On-Site)
January 6, 2020 to January 10, 2020 (Corporate Office)
Inspectors:
J. Justice, Physical Security Inspector
R. Patterson, Physical Security Inspector
J. Wallo, Senior Physical Security Inspector
Approved By:
James C. Shehee, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Sequoyah Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were
===evaluated:
Access Authorization===
(1)
- Tier I: All requirements.
- Tier II: All requirements.
- Tier III: All requirements.
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All requirements.
- Tier II: 02.06 (a-d), 02.07(a), 02.08 (a), (e), (I)
- Tier III: 02.10(a)
71130.08 - Fitness For Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection
===elements:
Fitness For Duty Program===
(1)
- Tier I: All requirements.
- Tier II: All requirements.
- Tier III: All requirements.
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
- (1) Security Plan Revisions 17 and 18 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decreases in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) The inspectors verified licensee performance indicators submittals for the period from January 2019, through January,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 30, 2020, the inspectors presented the security baseline inspection results to Mr. Matthew Rasmussen and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
1459590
Procedures
NPG-SPP-14.5
Access Authorization
NSDP-23
Plant Access/Badging Process
NSDP-24
Access Authorization Program
NSDP-38
Access Authorization - Reviewing Official
NSDP-43
Adjudication Guidelines
NSDP-51
TVA Nuclear Power Group Access Services Psychological
Screening Manual
Self-Assessments
Various Access Authorization Audits and Self-Assessments
Corrective Action
Documents
1446580
1504550
29635
1563098
15656207
1565679
1565684
1565693
1565699
1565702
Procedures
EPIP-8
Personnel Accountability and Evacuation
NPG-SPP-14.3
Security Information Control Program
NSDP-8
Keys and Locks
SQN-SSI-7.10
Gate 56 Vehicle Access
SQN-SSI-7.6
Personnel Access Control
SQN-SSI-7.7
Vehicle Access Control
Self-Assessments
Various Access Control Audits and Self-Assessments
Corrective Action
Documents
1394327
1461196
1482431
22336
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1548417
1548502
1548603
1548607
1549529
1565687
Procedures
NPG-SPP-14.1
Fitness-for-Duty and Fatigue Management
NPG-SPP-14.10
Fitness-for-Duty - Drug and Alcohol Testing Requirements
NPG-SPP-14.11
Fitness-For-Duty - Medical Review Officer Procedure
NPG-SPP-14.12
Fitness-for-Duty - Intoxylizers Requirements
NPG-SPP-14.14
Fitness-for-Duty - Training and Field Support for the Fitness-
for-Duty Program
NPG-SPP-14.3
Fitness-for-Duty - Administrative Duties
Self-Assessments
Various Fitness-for-Duty Program Audits and Self-
Assessments
Corrective Action
Documents
1517043
Procedures
Sequoyah Nuclear Plant Physical Security Plan and
Description of Changes
Sequoyah Nuclear Plant Physical Security Plan and
Description of Changes
SQN-SSI-16.9
Compensatory Measures
71151
Procedures
NSDP-29
Tracking and Trending and NRC Performance Indicators
9