Insp Repts 50-324/89-45 & 50-325/89-45 on 891218-22. Violation Re Failure to Follow Parameters of Welding Procedures Specs Cited But Not Noted.No Deviations Noted. Major Areas Inspected:Welding & Nondestructive Testing
ML20006B043
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/16/1990
From: Blake J, Coley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20006B042 List:
References
50-324-89-45, 50-325-89-45, NUDOCS 9001310284
Download: ML20006B043 (6)


Text

@ kt:

UNITED ST ";.TES o

' NUCLEAR CEGULAT RY COMMISSION

"

y'

REoiON ll,

e y

j 101 MARIETTA STRE ET,N.W.

U r

AT L ANT A. GEORGI A 30323

%...+/

,

Report Nos.: 50-325/89-45 and 50-324/89-45

.

Licensee:

Carolina Power and, Light Company P. O. Box 1551 Raleigh, NC 27602 Docket Nos.:

50-325 and 50-324 License Nos.:

DPR-71 and DPR-62 Facility Name:

Brunswick I and 2 Inspection Conducted:

December 18-22, 1989 Inspector: I.M. ht

_jd4*90

,u J. L'.N ol ey Q

Date Signed Accompanyin

'er a n 1:

A. F. Gibson, Director, Division of Reactor Safe y (M

/ //,

9v Approved by:

w J. J.

leke, Chief Dite Signed M te als and Processes Section ng) eering Branch Div'ision of Reactor Safety SUMMARY Scope:

'

This routine announced inspection was performed as a followup effort to ~ those documented in Reports 89-33, 89-35, and 89-43 in order to observed recirculation system pipe replacement activities including welding and nondestructive testing.

Results:

During the inspection, the inspector observed a welding operator employed by

~

General Electric (GE) welding outside a welding parameter of welding procedure

'

specification (WPS) No. 8.8.6 W Revision 5.

Failure to follow the' qualified parameters of the WPS indicated a lack of attention to detail by the welding operator and resulted -in violation (NCV) 324/89-45-01, paragraph 2.a.

This

,

violation however meets NRC Enforcement Policy for not issuing a Notice of Violation and was not cited. Other areas examined ny the inspector such as

-

radiographic film review, ultrasonic e'xaminations, weid traveler documentation, and weld repair procedures' appeared to be effective in achieving their intended quality goals.

,

Except for the NCV discussed above, no other violations or deviations was identified.

9001310284 900123

^

PDR ADOCK 05000324 Q

PDC

'

,

]

'

.

S

.

..

!'

_

REPORT DETAILS i

!

1.

Persons Contacted

!

Licensee Employees

!

  • W. J. Dorman, Manager, Quality Assurance / Quality Control

!

  • J. L. Harness, General Manager
  • R. E. Helme, Manager, Technical Support

"J. R. Holder, Manager, Outages r

"R. H. Jordan, Project Engineer

  • D. E. Norvotmy, Senior. Specialist, Regulatory Compliance
  • M. J. Pastva, Senior Specialist, Regulatory Compliance
  • L. W. Wheatley, Engineer, Inservice Inspection Other licensee employees contacted during this inspection included

craftsmen, engineers, operators, security force members, technicians, and administrative personnel.

-

Other Organizations

  • A. D. Ketcham, GE Site Services Manager

"G. Rowe, GE Pipe Replacement Project Manager i

NRC Resident Inspector

,

l

  • B. Ruland, Senior Resident Inspector l
  • Attended exit interview l

2.

Replacement of BWR Recirculation Piping - Unit 2(2513/12)

a.

Nuclear Welding (55050)

f

,

Inspection Report 89-35 discussed the welding program associated with I

this pipe replacement.

Items discussed _- included qualification _of-

welding procedures and welders, control procedures, and travelers and subtier documents used to record hold points, milestones, etc.

,

-

-

Applicable codes and standards for pipe installation, fabrication and

,

I testing were discussed in detail. Inspection Report 89-43 discussed

'

in process activities observed by the inspectors such as machining, preheating of nozzles prior to weld-butter application, welding on inlet nozzles A, B,

& - C, welding on three riser to extension

-

" pup pieces" and post weld heat treatment.

For in process welding-and nondestructive testing documented by the present report, the L

applicable Code is ASME B&PV Code,Section III,1986 Edition with 1988 Addenda.

l l

!

'

,

,-

.

.

.

o

.

At the start of this inspection on December 18, 1989, the status of work was as follows for the recirculation system pipe replacement activity.

(1) 'A' Nozzle / Safe-end, welding complete (2) 'B' Nozzle / Weld-butter repairs in process

3) 'C' Nozzle / Weld-butter repairs in proces.s (4) 'D' Nozzle / Weld-butter repairs in process (5) 'E' Nozzle / Weld-butter acceptable, however, indications in original I.D. cladding (6) 'F' Nozzle / Safe-end, welding complete & riser / sweep-o-let weld complete (7) 'G' Nozzle Weld-butter, post weld heat treatment, complete (8) 'H' Nozzle / Safe-end, welding complete (9) 'J' Nozzle / Safe-end, preparing for irservice inspection, welding Complete (10)'K' Nozzle / Safe-end, preparing for inservice inspection, welding complete Between December 18-21, 1989, the inspector observed welding activities on inlet nozzles E and G to verify that

work was conducted in accordance with the weld traveler and/or joint process control sheets (JPCS's), which were available at the work station; welding procedures and weld data' sheets were also at the work station; weld technique, sequence and heat input, wire feed, travel speed and electrical characteristics, shielding gas - flow, composition, and dew point were verified regularly by the inspector.

Welding equipment including power cables and gas liners were in good condition.

Preheat and interpass temperatures were controlled as required by the specification.

In addition, weld repair activities were observed on B, C & 0 nozzles and f4 tup activities were witnessed by remote camaras on J riser to sweep-0-let.

Within the above areas, the inspector noted the following discrepancy: during the filler pass welding of'G nozzle to safe-end, a welding operator had his automatic voltage control (AVC) unlock delay set at 2.3 micro /sec, the welding parameters allowed by WPS 8.8.6 W, Rev 5, were 3.0 - 9.9 micre/sec.

The inspector discussed this procedural violation with the GE supervisor at the work station who promptly re-set the variable within the parameters of the WPS and assured the inspector that it was nest an essential welding parameter.

The inspector also discussed the discrepancy with CP&L's welding engineer who also assured the insp?ctor that the procedure violation would have no adverse effect on weld quality.

However, the above violation does reflect a lack of attention to detail by the welding operator, which r.pparently is a major contributino fac. tor for the numerous weld repairs. Application of the 309L filler material on the sharp angle of the nozzel weld prep combined with the lower heat input used when welding to the Electric Power Research Institute

,

.

>

,*

.

_

(EPRI) recommended welding parameters requires constant attention by the welding operators.

The inspector also discussed this finding in detail with site management and stated that a violation of failure to follow procedures would be identified (NCV 324/89-45-01); however, because the discrepancy described above was minor in safety significance and was corrected immediately and CP&L project engineers committed to perform increased surveillance of GE's welding activities, _this NRC identified violation is not being cited because the criteria specified in Section V.

A, of the NRC Enforcement Policy was satisfied, b.

Review of Radiographs (57090)

The inspector reviewed radiographs for the following the completed welds:

Weld Number Piping Configuration 2B32FF-12FW802

'A' Riser to Pup Piece 2B32FF-22FW805

'C' Riser to Pup Piece 2B32FF-12FWS08

'E' Riser to Pup Piece 2B32FF-12FW813

'H' Riser to Pup Piece 2B11N2A-RPV-FWABA

'A' Nozzle to Safe-End 2B32FF-12FW-816

'K' Riser to Pup Piece 2B32FF-12FW-810

'F' Riser to Pup Piece 2B11N2H-RPV-FWABA

'H' Nozzle to Safe-End 2832FF-12FWRRB10A

'A' Riser to Sweep-o-let The inspector reviewed the above final radiographs to determine if the welds met the radiographic acceptance criteria of the licensee's

'

procedure and ASME Section III. The inspector's review also verified acceptable film quality such as:

penetrameter type, size and placement; penetrameter sensitivity; film density; film identification and weld coverage.

In addition to the above final radiographs, the inspector reviewed numerous film of in process weld

!

repairs.

c.

Pre-Mechanical Stress Improvement (MSIP) Ultrasonic Testing (UT)

(NVREG 0313, Rev. 2 and 73753)

The inspector reviewed GE's automated ultrasonic system (SMART System) data for the welds listed below to determine if the Pre-MSIP data have been gathered in accordance with the parameters of the applicable procedure and if the e:: amination results were evaluated satisfactorily.

-

.

?

.

-

.

.

Weld Number Piping Confi,guation 2B32FF-12FW802

' A' Riser to Pup Piece 2B32FF-12FW805

'C' Riser to Pup Piece 2B32FF-12FWB08

'E' Riser to Pup Piece 2B32FF-12FW810

'F' Riser to Pup Piece 2B32FF-12FW813

'H' Riser to Pup Piece 2B32FF-12FWB16

'F' Riser to Pup Piece In addition to the review of the above data the inspector also observed the in process ultrasonic inspection of weld No.

2B32FF-12FW803.

b.

Review of In process Weld Packages (55050)

The inspector reviewed weld packages for the following in process welds:

Weld Identification Piping Configuration

]

2B11N2B-RPV-FWABA Weld Butter Repair (N2B Nozzle)

2832-FW 825 Thermal Sleeve to Transition Weld (H-Riser)

2B32FF-12FWRRA13A Riser to Sweep-o-let Weld (J Riser)

2B32FF-12FW815 J-Riser to Safe-End Weld 2811N20-RPV-FWABA Weld Butter Repair (N2D Nozzle)

The above review of welding records was performed to verify that-in-process instrumentations met ASME Code requirements, hold points were correctly signed off, weld filler materials used were those certified, and welders certifications were satisf actory for the. WPS used.

Within the areas examined, violations or deviations were not identified except as noted in paragraph 2.a above.

!

3.

Exit Interview The inspection scope and results were summarized on December 22, 1989,

'

with those persons indicated in paragraph 1.

The inspector described the areas inspected and discussed in detail the non-cited violation listed below. This violation involved failure of welding operator to follow the parameters of a wciding specification and was-discovered by' the NRC inspector.

The error appeared to be of minor safety significance and was.

corrected immediately.

The recirculation system pipe replacement project

-

.

,...

o.

.

' -

....

engineer committed to increase surveillance of GE's welding operations-to;;

assure procedural compliance.

,

(Closed)

Non-cited Violation 324/89-45-01, Failure to Follow Welding Parameters of Welding Procedure Specifications No. 8.8.6 W..Rev. 5.

Proprietary. information is not. contained in this report.

Dissenting comments.were not received from the itcensee.