Forwards IE Insp Rept 50-316/81-09 on 810501-04 & 19.No Noncompliance Noted
ML17331A750
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/12/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17326A903 List:
References
NUDOCS 8106300525
Download: ML17331A750 (4)


Text

E '~ REOII

~o ClO j

i I

C

+~

~O

++*++

UNITED STATES'UCLEAR REGULATORY COMMISS

REGION III

799 ROOSEVELT ROAD GLEN ELLYN,ILLINOIS60137

~Jun

> ~ 881 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering 2 Broadway New York, NY 10004 lpga I

I ~gy i2 Cp i

Gentlemen:

This refers to the routine safety inspection conducted by Messr's. I. N. Jackiw and N. DuBry of this office on May 1-4 and 19, 1981, of activities at D. C.,Cook Nuclear Plant, Unit 2, authorized by NRC Opera'ting License No.

DPR-74 and to the discussion of our findings with Mr. D. V. Shaller at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection.

Within these areas, the inspection consisted of a selective examination of procedures and,representative records, observations, and in-terviews with personnel.

No items of noncompliance with NRC requirements were identified during the course of this, inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection, report will be placed in the NRC's Public Document Room. If this report contains any information that you or your contractors believe to be'xempt from disclosure under

CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such infor-mation.

Section 2.790(b)(1) requires that any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains

,a full statement of the, reasons on the basis which it. is claimed that the S

~

V a

f'<

r ~

r

American Electric Power Corporation JUN tQ QI information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

A

Sincerely,

\\

C. E. Norelius, Acting Director Division of Engineering and Technical Inspection Enclosure:

IE Inspection Report No. 50-316/81-09 cc w/encl:

D. V. Shaller, Plant Manager DMB/Document Control Desk (RIDS)

Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission RIIQ/

c~

DuBr RII Sp sard She RIII

'N$ 1 I