U.S.
NUCLEAR REGULATORY COMMISSION
'EGION III Reports No, 50-315/81-27; 50-316/81-31 Docket Nos. 50-315; 50-316 Licenses No. DPR-58; DPR-74 Licensee:
American Electric Power Service Corporation Indiana and Michigan Electric Company 2 Broadway New York, NY 10004 Facility Name:
D.
C.
Cook Nuclear Plant, Units 1 and
Meeting At:
American Electric Power Offi:ce - Columbis, OH Meeting Conducted:
November 2, 1981 Report Prepared By:
E. R.
Swa so Approved By:
R. L. Spessard, Dir ctor Division of Resident and Project Inspection yz 2p'g/
Meetin on November
1981 (Re orts No. 50-315/81-27 50-316/81-31)
Areas Ins ected:
An Enforcement Conference was held to discuss the licensee's plans for upgrading management controls at the.D.
C.
Cook Plant as they relate to NRC concerns.
Results:
No items of noncompliance were identified as a result of this meeting.
8201180530 811230 PDR ADOCK 050003i5
DETAIIS l.
Attendance American Electric Power Service Cor oration Indiana and Michi an Electric Com an J.
E. Dolan, Vice Chairman, Engineering and Construction R.
S. Hunter, Senior Executive Vice President, Construction and New York Engineering W. A. Black, President, Indiana and Michigan Electric Company S. J. Milioti, Assistant Division Manager, Nuclear Operations J. Williams, Jr.,
AEPSC Consultant W. Lowe, AEPSC Consultant E. L. Townley, Assistant Plant Manager IE Attendees J.
G. Keppler, Regional Administrator A. B. Davis, Deputy Regional Administrator R.
C. Knop, Chief, Projects Branch 1, Division of.Resident and Project Inspection D.
W. Hayes, Chi'ef, Reactor Projects Section 1B E. R.
Swanson, Senior Resident Inspector, D.
C.
Cook Plant NRR Attendees S. Miner, Licensing Project Manager, D.
C.
Cook Plant 2.
Areas Discussed The Regional Administrator opened the meeting with a request for discussion of the licensee's long range plans and goals in resolving the issues discussed during the last meeting held on August 4, 1981, and documented in IE Report Nos. 50-315/81-20 and 50-316/81-23.
Specific concerns were expressed in the following areas:
- The plans must be formalized as well as specific to time tables for accomplishment.
- The desired goal must be obvious and reflected in the plan.
- Candid, factual communications with the NRC are essential.
- Roles in the management structure must be well defined in terms of accountability and responsibility for implementation of the plan.
The licensee explained the plan outlined in their letter AEP:NRC:0625 dated October 16, 1981, and provided details of actions already complete.
The licensee committed to supplement this letter to provide more details of their corrective action plans including schedules and commitments.
" 2 "
I lt II C
f',
The Regional Administrator's concluding comments stressed keeping the objectives in mind while finalizing the planned action and that we would set a date for the next of these periodic meetings following receipt of the licensee's supplemental letter.
He also emphasized that the NRC relies heavily on the accuracy of information provided by licensee's and cautioned that receipt of inaccurate or misleading information was viewed very seriously by the NRC and would likely lead to strong enforcement actio ~~sH~,