IR 05000315/1981017
| ML17319B068 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/03/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. |
| Shared Package | |
| ML17319B069 | List: |
| References | |
| NUDOCS 8111060483 | |
| Download: ML17319B068 (4) | |
Text
god
~
1981 Docket No. 50-315 Docket No. 50-316 MHQZIXZCorz American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering 2 Broadway New York, NY 10004 Gentlemen:
Thank you for your letter dated September 18, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Reports No. 50-315/81-17; 50-316/81-20 forwarded by our letter dated August 19, 1981.
Your response to Item 1 appears adequate, and that area will be examined during a subsequent inspection.
Your response to Item 2 stated your position on the subject of preplanned lectures and requested that the violation be withdrawn.
The matter was discussed during a telephone conversation between Mr.,D. Nelson of your staff and Mr. M. Holzmer of our office on September 25, 1981.
Our under-standing of your position is that "preplanned" lectures as mentioned in
CFR 55, Appendix A, refer to lecture topics which are selected in advance according to the weak areas identified in annual requalification examinations.
Based upon this and our further review we now agree that your lectures are'replanned in accordance with the requirements of 10 CFR 55, Appendix A.
Therefore, we will withdraw the violation.
We feel, nevertheless, that the COPY SENT REQ!ON iiiO o483'
i'i03 PDR ADOCK'50003i 5
>>
~acr(f('
American Electric Power Service
- 2-50'..
'5 Bt preparation of individual lesson plans is advantageous, and we encourage their use.
Your cooperation with us is appreciated.
Sincerely,
'Driginai Signed by C,E. go<<i<<s C. E. Norelius, Director Division of Engineering and Technical Inspection cc:
D. V. Shaller, Plant Manager cc w/ltr dtd 9/18/81:
.DMB/Document Control Desk (RIDS)
Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission RIII RIII H+o zmer/eo zeker 10/21/81 RIII RIII Williams RIII
fl
I