IR 05000315/1981015
| ML17319B058 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/23/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. |
| Shared Package | |
| ML17319B059 | List: |
| References | |
| NUDOCS 8110290284 | |
| Download: ML17319B058 (2) | |
Text
0
'OCT 2 5 t98>
~'-'I~WK0Ni Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering 2 Broadway New York, NY 10004 I
e$
Qcl88 1g81
~>~l lC~R Rtc~gog~
AQllfggg Gentlemen:
Thank you for your letter dated October 1, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-315/81-15 forwarded by our letter dated August 19, 1981.
We will examine these matters during a subsequent inspection.
With regard to your proposed schedule for Type A tests, this matter has been referred to IE:HQ for review and approval.
Your cooperation with us is appreciated.
'
Sincerely,
~'ttus"
~g gjgggQ f)f C M C. E. Norelius, Director Division of Engineering and Technical Inspection cc:
D. V. Shaller, Plant Manager cc w/ltr dtd 10/1/81:
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission
-*
10/13/81 Bii0290284 8ii023 PDR ADQCK 0500031i5 DR RIII Jackiw Hayes l~)e /S r RIII i
xams
/~/wi/g/
RIII ggo(
~~
~
i II L
'I I.l