IR 05000313/1992019

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/92-19 & 50-368/92-19
ML20127E035
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/04/1992
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ENTERGY OPERATIONS, INC.
References
NUDOCS 9209150266
Download: ML20127E035 (5)


Text

.

__ _

. c:

l _

62 #E0 - UNITED STATES -

c 0g$ ; NUCLEAR REGULATORY COMMISSION .

.

. - REGION IV -

  • ' # 611 RY AN PLAZA DRIVE, SulT E 400

I L ,. & ARLtNOTON. TEXAS 760118064

- . . -

s e .- m

-

Docket Nos. 50-313 50-368-License.No . DPR-51 NPF-6:

Entergy: Operations,.In _

ATTN: Neil S. Carns, Vice President -

__ Operations,_ Arkansas Nuclear One

. Route 3. Box 137G Russellville, Arkansas - 72801 Gentlemen:

= SUBJECT: 'NRC-INSPECTION REPORT NOS. 50-313/92-19; 50-368/92-19-Thank Lyou for your _ letter of August 20, 1992, pertaining to your corrective measuresLin response'to exercise weaknesses 313/9219-01; 368/9219.01 and 313/9219-02;368/9219-02. - We have reviewed your ' reply and find it responsive to the weaknesses identified by the NRC Inspection Team during your_1992 exercise.- We-.will review -the implementation- of your-~ corrective actions -during-

-

_

s a-:futureL-inspection to. determine that . full- compliance has been achieved and

.will be maintained.-

l

Sincerely,

-

b 4.BillBeach, Director Division _of Reactor Projects cc: .

.

.

Entergy Operations,-In ' ATTN: - Donald C. Hintz, President &

Chief Operating Officer

,F.O. Box'31995'

-Jackson,:Mississippil 39286 _

<

p 9209150266 920904 7' /;[/ 's h' I PDR-o- ADOCK 05000313 0{ PDR- -

l

'-

- _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ - _ - _ _ _ - _ _ - _ _ _ - - _ _ - _ _ - _

-

,.

-

Entergy Operations *, In Entergy_ Operations, Inc.- .
ATTN: John R McGaha, Vice President Operations-: Support P.0i Box 31995-

-

! Jackson, Mississippi: 39286

.

n Wise, Carter, Child & Caraway-

. ATTN:' Robert-8.-McGehee, Esq.-

-

P.O. Box 651-

-Jackson, Mississippi :39205-

_

-

Entergy Operations, In .

ATTN: Jerry'Yelverton, General Manager Plant Operations Route 3, Box 137G Russellville,- Arkansas - 72801 .;

Entergy Operations,=In l

- ATTN::- James!J.- Fisicaro . 1-Director, Licensing Route 3, Box _137G l Russellville,= Arkansas 72801.-

-Honorable Joe-W.-Phillips County' Judge of Pope Count !

-Pope County-Courthouse

.Russellville, Arkansas:;7280 Winston'& Straw j i ' ATTN:--Nicholas-S. Reynolds, Es l

1400 L Street,' N.W 1 iWashington;-D.C.-:20005-3502  ;

l Arkan'sas Department._ of Health!

ATTN: Ms. Greta Dicus, Director _

Division of Radiation'Controi and

-

j

-

Emergency Management- 1 4815: West Markham: Street

Little. Rock, Arkansas .72201-3867 j l

cB&W:Nu:: lear Technologies  ;

-ATTN: : Robert ~B. Borsum- --

! : Licensing Representative 1 1700 Rockville Pike,_ Suite-525

Rockville,(Marylandt-20852 Admiral; Kinnaird RIMcKe9, .USN (Ret) }

i-214 South Morris Street ~

-

g ,

0xford, Maryland '21654 L

.

-;

.

-1

- ..._:._-_.-._:_

-.

. _ _ . - _ _ - - _ _ _ _ - _ _ _ _

.

- -- __ _ .

,

^

..

.-

-Entergy Operations, Inc.- -3-ABB Combustion Engineering Nuclear Power ATTN: . Charles B. Brinkman Manager, Washington Nuclear Operations-12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Chief, Technological Hazards Branch-FTMA Region 6 rederal Center 800 North Loop 288 Denton,-Texas 76201-3698

<

l

.. .

.-

'h

-Entergy: Operations,:Inc.-

.

- -_4 - -

!:; DMB . . Original: (IE35)_

F; bec with' copy of licensee's letter:

.J. L..Milhoan,<RA-L. J.:- Callan, DRSS

'

J. P;.-Jaudon, DRSS B. - Murray, ;, FIPS-

-

-- M.--Terc, FIPS Resident _ Inspector - Arkansas Nuclear One

- B. < Johnson,: Section Chief, DRP/A

'Lisa.-Shea, RM/ALF_(MS 4503)

-

FIPS File--

RIV File ,

DRP --

Project; Engineer, DRP/A DRS

' MIS' System RSTS Operator.-.

C;-A.1 Hackney, SLO- '

R. Erickson,-NRR'(MS_9 H15)

e

' '

,

'RIV N S- [ .C':FIPD V- D:DRd D:MP q 4MTerc:nh" b1Murray - - Jc4JCall an . AhBkch k N /92' -

/1I/92 ( /A>h92 ~9/f./92'

.

- ,-. . ~ .w --- _. e g -

-ma y,

. . .

'

..-

..

Entergy Operations, In DMB - Original (IE35)

bec.with copy of licensee's letter:

J. L. Milhoan, RA L. J. Callan, DRSS J. P. Jaudon, DRSS B. Murray, FIPS N. M. Terc, FIPS Resident Inspector - Arkansas Nuclear One B. Johnson, Section Chief, DRP/A Lisa Shea, RM/ALF (MS 4503)

FIPS File RIV File _

DRP Project Engineer,.DRP/A DRS MIS System RSTS Operator C. A. Hackney, SLO R. Erickson, NRR (MS 9 H15)

.

_

.,

,

.n RIVN S [ C:FIPh /s D:DRh5 0:MP 4 4MTerc:nh h'1Murray h1.JCall an AllBhach T A /92 'f/:2.1/92 ( /Afh92 9/t./92 l

_- _ _ _ _ _ _ _ - - _ - _ - _ _ _ _ _ - _ _ _ _ _ .

1 .

.

'

.,

g

-:-: Entergy  !"'""e #l'?"' '"*-

t Op_ erat!ons ;n. ,; g ""

August 20, 1992 OCAN089209 U. S. Nuclear Regulatory Commission Document Control Desk Hall Station P1-137 m

~~'--

Washington, DC 20555 -b b $ 0 $ $

Subject: Arkansas Nuclear one - Units 1 and 2 AUG 2 6 W u Docket Nos. 50-313 & 50-368

""

W License Nos. DPR-51 & NPF-6 Response to Items for 1.he 1992 REGIONIV W Radiological Emergency Preparedness Exercise-Inspection Report 50-313/92-19; 50-368/92-19 Gentleman:

Entergy Operations has reviewed your correspondence of July 15, 1992 (OCNA0789209) - regarding the inspection of activities associated with the Arkansas Nuclear One 1992 radiological emergency preparedness exercis Timely and effective action will be taken to correct each weakness and to prevent recurrence by addressing the root cause in a comprehensive manner. As evidenced by the conclusions documented in the subject inspection report. Entergy Operations believes that significant progress continues to be made in our efforts to improve our emergency preparedness progra As requested by your letter, attached is a description of-the corrective

'

measures _ planned and the schedule for completing these action Should you have any question' please contact me at (501) 964-860 Very truly yours,

~ .

,c w l. Snm

.f ames Fisicato Director Licensing JJF/SWB/mmg sttachment S h eu w _ -.

jci G>L " av C! v pyn f, O. S. NRC

'

'

-'

August 20, IC92 I- Page 2 ce: Mr. James L. Hilhoan U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1. Nuclear Plant Road Russellville, AR 72801 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13- 1-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 l- Ms.-Sheri R. Peterson ,

'

-NRR Project Manager, Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 l

I

.

l l-

.

,

l I

!

!

- - a<

.,

'

.

' '

Attachm2nt to:

' OCAN089209 Page 2

,-

!-

To prevent a recurrence of this error, instructions will be added to the "ANO Emergency Planning Drill / Exercise Manual" which will formally address preparations for the use of CNS during these activitie The above corrective actions are scheduled for completion by November 18, 199 . The inadequate briefing given by the licensee to the NRC upon their arrival to the site is considered to be an exercise weakness (313/9219-021 368/9219-02).

Response:

It has been determined that procedures lack formal guidelines for briefing off-site authorities upon their arrival at the Emergency Operations Facility (EOF). Procedure 1903.067 ' Emergency Response Facility - Emergency Operations Facility (EOF)" will be revised to provide- guidelines for conducting such briefings. The object of the briefings will be to furnish concise and useful information and to identify sources within the Emergency Response Organization for information not immediately available during the briefing. The addition of these guidelines will also promote consistency in the briefing proces This revision is scheduled for implementation by November 18, 199 . The inspectors noted that the off-site monitoring teams did not take adequate contamination control measures while in the radioactive plume because protective clothing was not used, nor was it readily available to them. The failure to use proper protective clothing is considered to be an exercise weakness (313/9219-03; 368/9219-03).

Response:

This weakness is the result of a past drill practice w tch did not require off-site Monitoring Teams to perform in the mos: realistic manner feasible. Although the use of protective clothing in the

-

field during this exercise was established as a simclated activity prior to the exercise, Entergy Operations acknowledges the negative training aspect of not requiring off-site monitoring teams to carry protective clothing with them in the field. Accordingly, in future

' drills and exercises which involve off-site monitoring teams,

. personnel will be expected to locate and carry protective clothing in the vehicle This training practice was initiated with the ERO Drill conducted on August 18, 1992.