IE Enforcement Conference Rept 50-311/83-25 on 830722.Major Areas Discussed:Concerns Re Control of Station Activities, Principally Isolation of RCS Vent Path
ML18089A327
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/16/1983
From: Jacobs R, Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18089A325 List:
References
50-311-83-25-EC, NUDOCS 8309070021
Download: ML18089A327 (2)


Text

~-

-

'

U.S. ~CLEAR REGULATORY COMMISSION

~

REGION I

Report No. 83-25 Docket No. 50-311 License No. DPR-75 Priority ___ _

Licensee:

Pub 1 i c Service E1 ectri c an*d Gas *Company 80 Park Plaza Newark, New Jersey 07101 Facility Name:

Salem Nuclear Power Station, Unit 2 Meeting at:

USNRC Region I, King of Prussia, PA Meeting Conducted: July 22, 1983 Inspectors:~ ~

if.iibS, ~neer;?1JR Category ___ c __ _

Meeting Summary:

Enforcement Conference July 22~ 1983 (Meeting Report No. S0..,.311:*f83-25)

A special Enforcement Conference was held in the NRC Region I office on July 22, 1983 to discuss concerns over control of station activities at Salem Unit 2, principally, the isolation of a required reactor coolant system vent path. The meeting was attended by senior NRC and licensee managemen *

-

--- ---- ----- - --- -


8309070021 830817 PDR ADOCK 05000311 I

G PDR

r:-- -

t;,J..

DETAILS Attendees Public Service Electric and Gas Company R. Uderitz, Vice President - Nuclear J. Zupko, General Manager - Salem Operations J. Boettger, General Manager - Nuclear Support NRC T. Murley, Regional Administrator R. Starostecki, Director, Division of Project and Resident Programs H. Kister, Chief, Projects Branch No. 2, DPRP R. Jacobs, Project Engineer, DPRP D. Holody, Enforcement Specialist, Region I G. Klingler, Enforcement Specialist, I&E Discussion and Results NRC Region I management summarized recent activities which involved problems with control of station activities at Unit 2. These activities ae summarized in the attachments and are discussed in Combined Inspection Report 50-272/83-16 and 50-311/83-15, Inspection Report 50-311/83-18 and Combined Insp~ction Report 50-272/83-13 and 50-311/83-1 The most significant concern involved blocking of the RCS vent path. The licensee indicated that the main cause of this violation was that the maintenance supervisor did not follow the shift supervisor's instructions and the maintenance supervisor has been disciplined. The licensee also noted that their policy is now to avoid multi-step work orders (such as to fabricate and install equipment) to ensure plant conditions are satisfied when work orders are approved. Additionally, the licensee has counseled all maintenance supervisors of this problem and will provide written direction to the Maintenance Departmen The licensee attributed the problems with the other activities, in particular, the Pressurizer Overprotection Protection (POPs) system challenge and the containment airlock problem, to personnel and procedural error. The affected test procedure which led to the POPs challenge has been revised and a standing order was issued to ensure that containment airlocks are tagged out when declared inoperable. The licensee noted that during the POPs system challenge on June 17, 1983, the RCS was not solid as reported in LER 83-029. From a broader perspective, the licensee indicated that they are trying to get more operationally experienced people into the maintenance and technical departments. Additionally, they are working on outage management to improve control of activities.

Region I management acknowledged and commented on the licensee's description of the events and corrective actions. The licensee will provide written documentation of these corrective actions in response to the Notice of Violations.