Docket Nos. 50-272 50-311 JUN 2 7 1991 Public Service Electric and Gas Company ATTN:
Mr. Steven E: Miltenberger Vice President and Chief Nuclear Officer P. 0. Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
Subject:
Schedule for Corrective Action for Violations Identified in NRC Inspection Report Nos. 50-272/83-37 and 50-311/87-29 Reference:
Salem Generating Station, Units 1 and 2 References:
1.
NRC Inspection Report No. 50-272/83-37 2.
NRC Inspection Report No. 50-311/87-29 3.
Safety Evaluation Report (SER) dated July 20, 1989 4.
Fire Protection Improvement Modification Schedule dated September 20, 1989 5.
PSE&G Exemption Request dated July 15, 1988 We have completed a review of the above referenced documents relating to the acceptability of your schedule for completing the corrective actions associated with the violations identified in NRC inspection reports Nos. 50-272/83-37 and 50-311/87-29.
Your letter of July 15, 1988, which transmitted the exemption requests, indicated that a schedule for implementing the Appendix R, III.G modifications would be provided following NRC approval of the exemptions.
We note that Public Service Electric and Gas Company (PSE&G) received approval from the NRC to implement modifications to the Salem Generating Station for compliance to Section III.G.2 of 10 CFR 50, Appendix R.
NRC approval of the related exemptions was documented in a Safety Evaluation Report (SER), dated July 20, 1989, and included a requirement to install one hour fire barriers between redundant safe shutdown circuits in specific areas.
On October 5, 1989, an unofficial copy of an internal PSE&G document dated September 29, 1989, was provided to Region I delineating proposed modification completion dates. That document provides a July 23, 1992, completion date for installing the one hour fire barriers at both Salem units.
OFFICIAL RECORD COPY r r; n r: n,'i 9107080177 910627 PDR ADOCK 05000272 Q
PDR IR 272/83-37 CORR ACTION - 0001.0.0 06/21/91
'\\o 1 £aj
- Public Service Electric and Gas Company
JUN 2 7 1991 The NRC is concerned with the extraordinary length of time that it is taking PSE&G to achieve full compliance with Appendix Rat the Salem facility.
PSE&G is expected to meet the July 23; 1992, completion date without further delay.
We understand that PSE&G will continue to implement approved compensatory measures pending completion of all of the related modifications.
Your cooperation with us in this matter is appreciated.
cc:
Sincerely, Original Signed By:
Marvin W. Hodges Marvin W. Hodges, Director Division of Reactor Safety S. LaBruna, Vice President, Nuclear Operations J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
C. Vondra, General Manager - Salem Operations F. Thomson, Manager, Licensing ~nd Regulation General Manager - Nuclear Safety Review J. Robb, Director, Joint Owner Affairs A. Tapert, Program Administrator R. Fryling, Jr., Esquire M. Wetterhahn, Esquire S. Lingerer, Manager, Joint Generation Projects Department, Atlantic Electric Company D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate Lower Alloways Creek Township Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (24) SALP Reports and (2) All Inspection Reports NRC Resident Inspector State of New Jersey OFFICIAL RECORD COPY IR 272/83-37 CORR ACTION - 0002.0.0 06/24/91
Public Service Electric and Gas Company bee:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Joyner, DRSS R. Blough, DRP J. White, DRP P. Kaufman, DRP J. Stone, NRR K. Brockman, EDD RI :DRS /JI Paol ino/ajk 06/lq /91 c \\a-RI :DRS Anderson 06/10 /91 RI:DRP Blough 06/~&'91
OFFICIAL RECORD COPY JUN 2 7 1991
~1
!l:j HQ~ N~pj.q HQ ~~C ~l.
Butler Goldberg 06/2.o /91 06/t!o /91
.~µ.../~~
IR 272/83-37 CORR ACTION - 0003.0.0 06/19/91