ML20128Q377
| ML20128Q377 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/10/1985 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20128Q383 | List: |
| References | |
| EA-84-104, NUDOCS 8507260667 | |
| Download: ML20128Q377 (3) | |
See also: IR 05000302/1984023
Text
p: x . ,,, --
,
ff(M..
'
toe . coMROL
)
SAFEGUARDS INFORMATION
'#
JAN 101985
Florida Power Corporation-
ATTN: Mr. W. S. Wilgus, Vice President
i
Nuclear Operations
P. O. Box 14042, M.A.C. H-2
St. Petersburg, FL 33733
Gentlemen:
SUBJECT:
PROPOSED CIVIL PENALTY ACTION:
EA 84-104
(REPORT N0. 50-302/84-23)
This refers to a routine safeguards inspection conducted by a member of the NRC
Region II i:taff on August 12-16, 1984, of activities authorized by NRC Operating
License No. CPR-72, for Crystal River 3.
The findings were discussed with you
and members of your staff during an Enforcement Conference held in the Region II
Office on September 6, 1984.
This safeguards inspection identified two violations in which vital equipment was
not afforded the level of protection specified in the physical security plan.
One violation revealed that the door leading into a vital area containing vital
equipment had not been provided with the access control features common to other
vital areas at the plant.
These controls were specifically required by your
approved Physical Security Plan (PSP). The second violation indicated a failure
to identify and secure an opening in a vital area barrier with the proper
security equipment as specified in the Physical Security Plan.
The second
violation is of particular concern since it appears that you were aware of the
specific requirements of your PSP as long ago as 1980, and yet did not observe
them.
These violations, identified in the enclosed Notice of Violation and Preposed
Imposition of Civil Penalty, would normally be categorized in accordance with NRC
Enforcement Policy,10 CFR Part 2, Appendix C, as revised, 49 FR 8583 (March 8,
1984), at Severity Level IV (Supplement III).
However, because circumstances
surrounding one violation involved failure to take adequate corrective action
for previously identified problems, and together the violations indicate a
weakness in the exercise of your responsibility to fully implement and maintain
in effect all provisions of the PSP, the violations have been categorized as
a Severity Level III problem.
After consultation with the Deputy Director,
Office of Inspections and Enforcement, I have been authorized to issue the
enclosed Notice of Violation and Proposed Imposition of Civil Penalty in the
amount of Fifty Thousand Dollars ($50,000).
You are required to respond to the Notice of Violation.
You should follow the
instructions specified in the Notice when preparing your response and, in doing
so, you should place all Safeguards Information as defined in 10 CFR 73.21 only
in the enclosures, so that your letter may be placed in the Public Document Room,
ssetos%"CgAgs
-
supA
SAFEGUARDS INFORMATION
qFAGW$103 mis
nam-
c
y
B507260667 850110
,
ADOCK 05000302
~
, , ,
G
,
- - - -
- - - - --.
- -
- -- --
- - - -- -------- _ ----
- - - - - - ---
__
_ y . L.,
i
SAFEGUARDS INFORMATION
i'
'
Florida Power Corporation
2
In your reply, you should describe those actions taken or planned that are
designed to increase the effectiveness of the management of your security
program, particularly with regard to fully implementing and maintaining in effect
all provisions of your Physical Security Plan. Your reply to the Notice and the
results of future inspections will be considered in determining whether further
enforcement action is appropriate.
The material enclosed contains Safeguards Information as defined by 10 CFR 73.21
and its disclosure to unauthorized individuals is prohibited by Section 147 of
the Atomic _ Energy Act of 1954, as amended.
Therefore, the material, with the
exception of the report cover letter which is an inspection summary, will not be
placed in the Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to
discussed them with you.
Sincerely,
James P. O'Reilly
Regional Administrator
Enclosures:
1.
Notice of Violation and Proposed
Imposition of Civil Penalty
(Safeguards Information)
2.
Inspection Report No. 50-302/84-23
(Safeguards Information)
cc w/encls:
E. M. Howard, Director
Site Nuclear Operations
P. F. McKee, Nuclear Plant Manager
G. R. Westafer, Manager
Nuclear Operations Licensing
and Fuel Management
bec w/encls:
IE File
NMSS/SGPL
.,.
NRR/DL/SSPB
rJCLOME WA#g
PRobinson, IE:ES
Sg3.c .ws INEJ'AUON*'
bec w/ Inspection Summary
UPON OMYW
'
(Continued on Page 3)
TAcs is D; con 17.0Lp
.
St.FEGU ARDS INFORMATION
'
.
. . . . ..
"
SAFEGUARDS INFORMATION
'
Florida Power Corporation
3
bec w/ Inspection Summary:
'
RDeYoung, IE
JAxelrad, IE
NRC Resident Inspector
' Document Control Desk
State of Florida
,
J
_
. . ----
, - . .
RIf{
RII
RII
R
II
k
RII
R)
RII
&
n
W
i
>. L
DE(oore:es D
ire
K arr
JP$tohr
JFRogge
HDance
RL wis JMPp kett
9/g/84S/$p/84
9p/84
9//9/84
9/p/84 9/lj/84
9/ /84
9/g /84
uctosmreomusw -
SAFEGUARDS INFORMATION
31,E21303 memor.-
LTON SE?ARATION THIS
PACE IS DECmROLLED.
, , -
- . . - . . .
, , ,
-