September 10,1981 Cf%
In Reply Refer To:
A
'N' /
Docket: 50-298/81-13
,
$
(
.
O?
Nebraska "ablic Power District C
a t.
78 8 /
-/
ATTN: Mr. J. M. P11 ant u
-
% %,
A Director, Licensing & Quality Assurance A
,
Post Office Box 499
-
v.T].l y @ U '
'
Columbus, NE 68601 g
'
Gentlemen:
This letter is to confirm the agreements reached between Mr. C. Jones, Assistant General Manager for Operations, and others of your staff, and Mr. Karl V. Seyfrit. Director, Region IV, and other members of the Nuclear Regulatory Connission staff on September 4,1981, during the
.
management meeting held to discuss the results of the NRC Emergency Pre-
<
paredness Appraisal of Cooper Nuclear Station.
.
We understand that you intend to take corrective action for the signi-j ficant appraisal findings as stated in the following:
!
~1.
Emergency Response Organization Description i
!
a.
Required Action The licensee shall revise the Emergency Plan and Procedures to
l unambiguously define and describe the overall emergency response organization and its subcomponents. The description shall identify i
[
the various groups which make up the overall emergency rexpense organization including: 1) licensee onsite personnel; 2) licensee offsite personnel (e.g., Corporate personnel); 3) Federal response
'
organizations; 4) State response groups for all four states in
the 50 ::ile EPZ; 5) local response groups in the 10 mile EPZ; and 6) contractor organizations and/or individuals on which the licensee would depend for emergency support.
T Col The revised Emergency Plan and Procedures shall unambiguously
identify the functional areas of emergency response (e.g., accident classification, notifications, oost-accident sampling and analysis, j[
',
dose assessment and consequence analysis, field monitoring,
'
personnel accountability) and the groups and individuals, down to
the working level, who will supply support in each functional area.
-
The description shall also unambiguously define the duties, responsibilities, authorities, and limits of actions for all gmups and key individuals in the overall emergency response organization down to the working level and by specific funct"4 NS',3 F.ila con on gg
,
8109220376 810910
'
'
h, !.
PDR ADOCK 05000298 omcry..... CERTIFIED MAIL....RE.T.U.RN..R.ECEIPT...REQJ p
F PDR -
.
-
-
........
.....
....-
..-
==>
E
..,RPB.,.
.U
..lJ N.... MC.........
.Q..8 J.V......... D11
........
........ n7...,.......,7...,m........M.9g,y..s....
.g.XVSeyfri.t. ]JNgliar
....
.
..
.......,
omr>
ney:bb GLMa sen GD own SSchwartz Collin
yy..
,py.
m........n.
. "" ?"l* "
"? ""?. 'i___ __OFYjCI A L. RECORD C_OPY_ _ __ ___ __
_
.-
-
- - -.
- - -
_ _ - -. _ _ -
-
-
- - -
.
.
..
.
,
'
-
,
,
>
Nebraska Public Power District
!
i to be perfomed, as well as the reporting chains, management
'
structure and interfaces to assure coordination of the overall j
emergency response organization.
b.
Agreed Upon Date of Completion
,
,
t
!
The licensee shall revise their Emergency Plan, Emergency Proce-l'
dures, and retrain personnel on the revised procedures. This
shall be accomplished and reported to the NRC by January 15, 1982.
j 2.
Emergency Action Levels / Procedure Flow a.
Required Action _
,
i i
The licensee shall correct the existing Emergency Action Levels j
(EALs)suchthattheyaresitespecificanddonotrequire referencing to other documents to be exactly undersi.ood (e.g.,
,
i remove references to Technical Specifications and replace with
.
'
the actual Technical Specification values). The licensee shall also integrate the Emergency Action Levels (EALs) into the
,
Station Operating Procedures and assure that t.m procedures are
!
,
written in such a manner as to enable the reactor operations
'
'
personnel to effectively and expeditiously acee from nomal
operations, to abnomal operations, through erargency operations
'
!
and into the emergency plan implementing procedure, r
t
r
!
b.
Agreed Upon Date of Completion
.
i The response for corrective action, including a description of r
I the action and time pmjections for accomplishing these actions,
'
shall be submitted to the NRC by January 15, 1982.
i
f 3.
Offsite Radiological Monitoring Capability
a.
Required Action l
The licensee shall describe their capabilities to perfom offsite i
radiological monitoring to a sufficient level of detail ta duenstrate that the offsite radiological monitoring teams can
{
tind and characterize an airborne release plume and obtain the-necessary information with which the licensee can perfom dose
,
calculations, consequence assessment, and provide input to the
,
decision making for recorssending offsite protective actions to
appropriate officials. The licensee's response shall include, at a minimum: location, availability, and capability of vehicles
,
which would be used by the offsite radiological monitoring teams
!
during an emergency; location, availability, and capability of
!
necessary radiological detection and measurement instrumenta-
- '
I tion and equipment. The time and methods used to detemine
.
!
,
i
">
..................
.....................
..................
.................
.....................
....................
.................
f *"^" >
..................
.....................
....................
...................
....................
.................
...................
f
^-DATEk
...................i
..................
....................
.....................
....................
....................
....................
I ""ff"" ".*2???*" "I_._._O FF ICI A L, R EC _R D_CO,PY _ _
_ ___j O
-
,
!
'
Nebraska Public Power District
'
and transmit the field data to the location where the licensee will perform the dose assessment calculations shall also be included.
b.
Agreed Upon Date of Completion
The license shall submit the above information to the NRC by January.15, 1982.
I 4.
Post Accident Sampling i
q a.
Required Action l
It is not clear to the NRC that the licensee can obtain a primary coolant and a containment air sample safely and efficiently. The
licensee shall provide a description of their interim provisions
for post accident sampling and handling methods which describes
obtaining representative primary coolant samples and representative l
containment air samples.
Identify the location and capability of offsite laboratories for radiological analysis of samples taken
'
during an emergency. The licensee shall demonstrate that i
capabilities exist for obtaining post accident samples safely
<
until the permanent post accident sampling system is.initiatcd in accordance with NUREG-0737.
j b.
Agreed Upon Date for Completion
The licensee shall submit an action plan to the NRC showing when
-
the above actions will be completed by October 5, 1981.
i
.
5.
Radiation Monitoring i
a.
Required Action
,
!
(1) The licensee shall describe the mechanism for indicating i
radiological conditions in the Operation Support Centers, Technical Support Center and the Emergency Operations Facility
'
during and following an incident. The licensee shall i
describe how personnel in each facility will be made aware of radiological conditions, e.g., radioactive airborne contamination and direct radiation, upon entering the facility and during
,
occupancy of each facility.
(2) The licensee-shall p' ovide sufficient radiological monitor-ing instrumentation for emergency teams such that radio-logical conditions can be determined safely and minimize personnel exposure e.g. high range instrumentation with
.
' o"'c' >
.................
...............
................
...................
............ -.
...........~.....
..............
" " >
'
.................
...............
................
..................
..................
................
..............
DATE)
,
...............
...................................
..................
.................
.................
..............
OFFICIAL RECORD COPY j une ronu as no-soi nacu ouo- - -. -. -
. - -
. -
-
.
.-
__
-.-
- - -
--
-
_
.
!
N:braska Public Power District
~4
}
,
t extendable probes. The licensee shall provide the capability to read emergency personnel TLDs and determine occupational
exposure onsite on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day basis during an emergency.
i
b.
Agreed Upon Date for Completion The licensee shall submit the above information, which will include projected completion dates, to the NRC by November 5, 1981.
.
6.
Public Education and Information a.
R_equired Action
'
'
The licensee shall disseminate to members of the general public.
within the 10 mile EPZ, material to inform and educate the public
!
concerning how they will be notified and what their actions
'
[
should be in an emergency. This information shall include educa-tional information on radiation; contacts for additional informa-i tion, protective measures such as evacuation routes and reloca-
tion centers, sheltering, respiratory protection and special
needs of the handicapped.
In the dissemination process, the licensee shall make special provisions to place this informa-
,
i tion at points where the transient population will have access
to it. Further, the licensee shall ensure that preplanned initial and followup messages to the public are available for broadcast immediately following initiation of the alert and notification system and shall identify the individuals by title who are
,
responsible for transmittal of such messages to the radio station i
during an emergency.
!
b.
Agreed Upon Date for Completion
!
The licensee shall submit documentation to the NRC showing that i
r i
the above actions are completed by November 5, 1981.
7.
Onsite Emergency Organization Augmentation i
a.
Required Action Pursuant to the requirements of the. generic letter dated February 18,-
,
l 1981 to all licensees from Mr. D. Eisenhut regarding the minimum
.
staffing requirements for Nuclear Power Plant Emergencies, the I
!
licensee shall provide the results of a study which will demonstrate t
that the 30 and 50 minute staff augmentation for emergencies can be
';
achieved. Results of the study shall be documented and forwarded to the WRC for review and evaluation.
-
I
<
'
l f
!
'
I
- >l l
-
-
l
.................r--
--
-
-
! ~ 5"" >...............
................
..................
.................
..................
.................
..............
'
'om >
...............,
..................................
.................
..................
..................
.................
(
. _ ~,__...
.~. FFICI AL RECORD COF Y 318 (10-80) NRCM 0740 O
l NRC FORM
~
.
-
--. __- _. _ ___,_. _.
..
r
-
-
.
.
.
.
'
Nebraska Public Power District
b.
Agreed Upon Date for Completion The licensee shall perform a study to determine shift augmenta-tion according to Table B-1 of NUREG-0654, Revision 1, and submit study results to the NRC by October 5,1981.
8.
Personnel Accountability a.
Required Action The licensee shall demonstrate that the administrative and physical means exist to perform accountability of all persons within the exclusion area within 30 minutes of the start cf the account-ability process and provide continuing accountability of licensee controlled emergency workers thereafter.
b.
Agreed Upon Date of Completion The licensee shall submit by January 15, 1982, corrections of their Emergency Plans and appropriate Emergency Plan Implementation Procedures and submit any additional information deemed necessary to demonstrate that personnel accountability capability exists.
9.
Respiratory Protection a.
Required Action The licensee shall provide resniratory protective equipment for all onsite personnel. The equipment shaP be located in areas safely and quickly accessil e by onsite personnel (e.g. the Control Room, OSCs, TSC, a:.J E0F).
The licensee shall assure the NRC that all personnel will maintain their capability to safely and efficiently don appropriate respiratory protective equip;nent.
b.
Agreed Upon Date for Completion The licensee shall describe how all essential personnel are provided with appropriate respiratory equipment to the NRC by November 5, 1981.
Failure to complete the above required actions by the agreed upon dates will result in NRC considerations of appropriate enforcement action.
In addition to the coninitments noted above, the following issues were discussed at the management meeting held on September 4,1981 and are considered open items pending additional information from Nebraska Public Power District (NPPD).
=>
.............
...........
....
....
...............................
..............
.............
" " >............
..............
.....
...
................
................
.......
..
..........
Daft)
..............
..................
..............
................
................
............
...........
NHC FOT.M 318 (10 80) NRCM 3240 OFFICIAL RECORD COPY j
_,
, _.
.
Nebraska Public Power District
By October 15, 1981, you are requested to address these issues in sufficient detail indicating how you intend to correct these weaknesses in your Emergency Preparedness Program. Your response shall also include-target dates for com-pleting these actions.
1.
As presently structured it is not apparent that your Emergency Plan provides for a fonnalized classroom training and retraining program for all offsite, corporate and station personnel who may be called upon to respond to an emergency. Provide documentation indicating how this will be incorporated into your overall training program.
2.
Currently your Emergency Plan does not address the long term Recovery Organization. Provide a schedule for revising your Emergency Plan to cover the Recovery Organization.
If our understanding of your planned actions described above is not in accordance with your actual plans and actions being implemented, please contact this office by telephone (817) 465-8100, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Sincerely, Karl V. Seyfrit Director cc:
L. C. Lessor, Superintendent Cooper Nuclear Station Post Office Box 98 Brownv111e, Nebraska 68321 bcc: Resident Inspector RIV bec:to DMB(IE0I)
Steve Ferris, FEMA RVII BC 911 Walnut St., Room 300 PM Kansas City, M0 64106 AE0D G. L. Madsen, RIV ELD G. D. Brown, RIV IE/RPRIB D. Thompson, IE:HQ IE FILE S. Schwartz, IE:HQ NRR/DHFS J. Gagliardo, RIV NRR/0LB RAD ASMT BR RESEARCH i
PDR:HQ LPDR NSIC o" * >..............
............
...........
...............
.........
...........
...........
..............
..........
.............
............
- .....*.**..**
- **.
- *
- .*.**
DQTE )
........ _
......
....
.................
................
..............
...............
........
.
NRC FORM M8 00-80) NRCM O2a OFFICIAL RECORD COPY
_
. _ _
_
_
,