IR 05000298/1981018

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-298/81-18 on 810921-25.No Noncompliance Noted.Major Areas Inspected:Security organization-personnel, Contingency Response & Access Control.Details Withheld (Ref 10CFR2.790)
ML20040B247
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/28/1981
From: Caldwell R, Evans C, Joseph Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20040B243 List:
References
50-298-81-18, NUDOCS 8201250308
Download: ML20040B247 (2)


Text

_ _________

\\ ::.

.

'

'

-

..

U. 5. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT

-

REGION IV

Report:

50-298/81-18 License: DPR-46 Licensee:

Nebraska Public Power District Facility Name:

Cooper Nuclear Station Inspection At:

Brownville, Nebraska Inspection Conducted:

September 21-25, 1981

1 Date of Last Physical Security Inspection:

May 18-21, 1981 Type of Inspection:

Unannounced Physical Security Inspectors:

-

O b

'

C. Abigail / Evans, Physical Security Specialist Date

-

n

.

i<'u w d a G N w e 0 ici29lvl

.

f Ronald A. Caldwell, Physical Security Specialist Daife I

Approved by:

J.M.

/

M CP bk J

F. Kelly, Chief, Ph @ al Security Section Date i

Inspection Summary I

Areas Inspected:

Included a review of the Security Organization - Personnel,

,

T&Q; Security Organization - Contingency Response; Lighting; Access Control -

,

Personnel; and Independent Inspection Effort.

i

'o

!

-

'

,

.

.

8201250308 811117 PDR ADOCK 05000298 G

PDR

,-

.

.

~ *

'

'

-

'

.

..-

.

.

_.-2-

.

,

.

.

..

,

.

The inspection involved 112 inspector-hours by two NRC inspectors including 48 inspection hours accomplished during off-shift periods.

The inspection began during the day shift.

Results:

The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.

l i