IR 05000295/1985026

From kanterella
Jump to navigation Jump to search
Physical Protection Insp Repts 50-295/85-26 & 50-304/85-27 on 850722-25.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures.Safeguards Info Deleted (Ref 10CFR73.21)
ML20134E238
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/14/1985
From: Creed J, Drcuin B, Drouin B, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20134E193 List:
References
50-295-85-26, 50-304-85-27, NUDOCS 8508200100
Download: ML20134E238 (2)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Reports No. 50-295/85026(DRSS); 50-304/85027(DRSS)

Docket Nos. 50-295; 50-304 Safeguards Group IV Licenses No. DPR-39; DPR-48 Licensee:

Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 Facility Name:

Zion Nuclear Station, Units 1 and 2 Inspection At:

Zion Station, Zion, Illinois Inspection Conducted:

July 22-25, 1985 Date of Last Physical Security Inspection:

March 25-28,19Q5

.

Type of Inspection:

Unannounced Physical Protection Inspection b

ud 6////45~

Inspectors:[o'J. RMnfceley Dat'e

'

Physical Security Inspector md 9) / Y7G~

B. Drouih Date Physical Security Inspector Approved By:

/K g/R. Creed, Chief Date Wafeguards Section

-

Inspection Summary Inspection on July 22-25, 1985 (Reports No. 50-295/85026(DRSS);

50-304/85027(DRSS))

Areas Inspected:

Included a review of the Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Physical Barriers -

Protected Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Detection Aids - Protected Areas; and Communications.

The inspectors reviewed the licensee's actions / performance relating to weaknesses /

concerns identified in previous inspection reports or which were identified as a result of a Region III analysis of previous inspection findings; 10 CFR 73.71(c)

security event reports and the previous SALP report.

The inspection involved 66 inspector-hours by two NRC inspectors.

The inspection began during the day shift.

Enclosure contains N.FORKION 8508200100 850814 pon separation this PDR ADOCK 05000295 G

PDR page is Decontrolled i

-

-

-

-

- -

- -

-

--

.

-.

Results:

The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection.

One previously identified weakness was found to have been satisfactorily corrected.

(Details - UNCLASSIFIED )

(2