Emergency Preparedness Insp Rept 50-293/89-11 on 891010-13. No Violations Noted.Major Areas Inspected & Observed: Licensee Full Participation Annual Emergency Preparedness Exercise on 891012
ML19327B962
Person / Time
Site: Pilgrim
Issue date: 10/24/1989
From: Conklin C, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19327B960 List:
References
50-293-89-11, NUDOCS 8911140271
Download: ML19327B962 (8)


Text

F i

'

-

..

l

....

..

,

,

,

U. S. NUCLEAR REGULATORY COMMISSION

,

l

REGION I

'

Report No:

50-293/89-11

!

Docket No:

50-293 r

License No:

DPR-35 Priority Category [

Licensee:

Boston Edison Comoany

RF0 #1 Rocky Hill Road Plymouth. Massachusetts 02360 Facility Name:

Pilarim Nuclear Power Station

,

. Inspection At:

Plymouth. Massachusetts

'

Inspection Conducted:

October 10-13. 1989 Od

/c/9[#7 Inspector:

w

^

Craig Ctr kMh, Senior Emergency date Preparedness Specialist, DRSS Approved By:

M

/d VM

illiam La ar

,.AQLjef, Emergency date i

Preparedne ection, FRSSB, DRSS G. Bryan, Comex

>

D. MacDonald, NRR

,

D. Vito, Region I S. Merwin, Battelle C. Marschall, SRI C. Carpenter, RI Insoection Summary:

Inspection on October 10-13. 1989. (Report No. 50-293/89-

.lu

. Areas Inspected: A routine, announced emergency preparedness inspection and

,

observation of the licensee's full-participation annual emergency preparedness

'

exercise conducted on October 12, 1989.

The inspection was performed by a team of seven.NRC Region I, headquarters and contractor personnel.

Results: No violations were identified. The licensee's response actions for T

this exercise were adequate to provide protective measures for the health and safety of the public.

8911140273 g91101 gDR ADOCK 05000293 PNU g

,

.__

, _.

__

_

.

,

m

.

..

..

,

.

i DETAILS j.

'

l.0 Persons Contacted

.

The following licensee representatives attended the exit meeti a held on

October 13, 1989.

S. Sweeney, President R. Bird, Senior Vice President - Nuclear K. Highfill, Vice President, Nuclear Operations E. ' Robinson, Manager Nuclear Information G. Davis, Vice President, Nuclear Administration R. Swanson, Vice President, Nuclear Engineering W. Clancy, System Engineering Division Manager

!

E. Kraft, Deputy Plant Manager i

R. Varley, Emergency Preparedness Department Manager

'S. Hook, Onsite Emergency Preparedness Section Manager D. Landahl, Onsite Emergency Preparedness Division Manager J. Morlino, Drills and Exercise Coordinator During the conduct of the inspection, other licensee response personnel

.

were interviewed and observed.

!

l

!

2.0 Emeroency Exercise The Pilgrim Nuclear Power Station full-participation exercise was

!

conducted on October 12, 1989, from 7:30 a.m. until 2:00 p.m.

Subsequently, the Commonwealth of Massachusetts and local Towns of Carver, Duxbury, Kingston, Marshfield, Plymouth, and Bridgewater and the City of Taunton participated. The Federal Emergency Management Agency i-(FEMA) observed off-site activities.

i 2.1 Pre-exercise Activities The exercise objectives submitted'to the NRC Region I on July 10, 1989 were reviewed and determined to adequately test the licensee's Emergency Plan. On August 8, 1989, the licensee submitted-the complete scenario package for NRC review and evaluation. - Region I representatives had telephone conversations with the licensee's emergency preparedness staff to discuss the scope and content of the scenario. As a result, minor revisions

,

,

were made to the scenario and supporting data provided by the

'

licensee.

It was determined that the scenario would provide for

,

adequate testing of major portions of the licensee's Emergency Plan and Implementing Procedures and also provide the opportunity l

for licensee personnel to demonstrate those areas previously

'

l.

identified by the NRC as in need of corrective action. NRC L

observers attended a licensee briefing on October 11, 1989 and

!

participated in the discussion of emergency response actions expected during the scenario.

It was agreed that controllers l

would intercede in exercise activities to prevent scenario deviations or disruption of normal plant operations.

1'

.

__

__

_

-_,.

.

.

_ _ _ _

(;

..

.

-

.

.

3 The exercise scenario included the following events:

- High local power levels as a result of an improperly calculated c

rod swap with resultant fuel clad damage;

- High radiation alarm on the Augmented Off-Gas air ejectors;

- High radiation levels indicated on the Torus Containment High l

Range Monitoring System;

'

- Steam line break in the steam tunnel;

- Release of radioactivity to the environment;

- Declaration of Alert, Site Area Emergency and General Emergency classifications; and

- Recommendation of protective measures to off-site authorities.

The above events caused the activation of the major portions of the licensee's on-site and off-site emergency response facilities.

2.2 Activities Observed During the conduct of the licensee's exercise, NRC team members made detailed observations of the activation and augmentation of the emergency response organization, activation of emergency response facilities, and actions of emergency response personnel during the operation of the emergency response facilities. The following activities were observed:

1.

Detection, classification, and assessment of scenario events;

.

2.

Direction and coordination of the emergency response;

!

'

3.

Notification of licensee personnel and off-site agencies; 4.

Communications /information flow, and record keeping; 5.

Assessment and projection of radiological dose and consideration of protective actions; 6.

Provisions for in-plant radiation protection; 7.

Performance of off-site and in-plant radiological surveys; i

8.

Maintenance of site security and access control; l

9.

Performance of technical support, repair and corrective I

actions; 10.

Assembly and accountability of personnel; and

11.

Provisions for communicating information to the public.

'

3.0 Classification of Exercise Findinas Emergency Preparedness exercise findings are classified as follows:

!

l

..

l

.

.

.-

- -.. -

-

-

-

.,.

- - -..

- _ _ _.

.

f.-

P

.

,

>^

,

.

,

I

.

4'

,

Exercise Strenoths

-

. Exercise strengths are areas of the licensee's response that provide J

strong positive indication of the ability to cope with abnormal plant

conditions and implement the emergency plan and procedures.

Exercise Weaknesses Exercise weaknesses are areas of the licensee's response in which the performance was such that it could have precluded effective

'

implementation of the emergency plan in-the event of an actual emergency l

in the area being observed.

Existence of an exercise weakness does not

.

of itself indicate that' the overall response was inadequate to protect

,

L the health and safety of the public.

Areas for Imorovement An area l'or improvement is an area which did not have a significant negative' impact on the ability to implement the emergency alan and response was adequate, however it should be evaluated by t1e licensee to

. determine if corrective action could improve performance.

'

4.0 Exercise Observations u

The inspectors observed licensee response actions in the emergency I

response facilities as follows:

l l

Control Room L

Several exercise strengths were identified.

1.

The. operating crew quickly recognized plant conditions and made

-

L.

subsequent prompt and conservative classifications.

l l-2.

The Nuclear Watch Engineer exhibited good command and control.

L L

3.

The operating crew displayed a good application of technical ll expertise to mitigate the accident and recommend emergency classification upgrados to the Emergency Director at the Emergency

Operations Facility.

.

4.

The Administrative Assistant was knowledgeable and effective in carrying out notification duties.

L No exercise weaknesses were identified.

l Two areas for improvement were brought to the licensee's attention.

1.

Turnover froli the Nuclear Watch Engineer to the Emergency Plant Operations Supervisor was slow and cumbersome.

This was an administrative problem regarding turnover paperwork, not a p

l

[

,

_

,

__ _. _

.

-.

.

...

.

.

. -..

.

i

.

c

-z....

.

.

A

/

F

.

performance issue,

'

'

2.-

The Digital Notification Network (DNN) facsimile machine malfunctioned. The Alert message was issued promptly utilizing i

the voice capability of the DNN, however the initial message

declared an Unusual Event.

This ns immediately corrected, but did cause some confusion off-site.

.

Technical-Suonort Center

'

Several exercise strengths were identified.

1.

The TSC was staffed and activated in a timely manner.

,

2.

The TSC staff demonstrated a good technical effort, especially regarding repair tracking and prioritization.

,

L 3.

Low noise levels were maintained throughout the exercise.

No exercise weaknesses were identified.

Two areas'for improvement were brought to the licens9e's attention.

1.

Eating, drinking and smoking continued in the TSC prior to

'

ascertaining habitability. Additionally, these activities were not stopped after'the release occurred and habitability was

,

reverified.

2.

The TSC staff estimated core damage by using a mathematical LOCA model early in the exercise. The use of this model was inappropriate for the situation at that time and led to the incorrect conclusion that core damage was low and that a PASS v

sample would not be necessary. The extent of core damage was recognized later in the exercise from other symptoms.

Operations Suonort Center

"

Several exercise strengths were identified.

1.

There was very good interaction between the various technical disciplines within the OSC.

'

2.

The tracking and accountability of teams was effective.

3.

The OSC manager gave very good briefings and debriefings of the repair teams.

No exercise weaknesses were identified.

No areas for improvement were identified.

.-.

-


.

. -. - -.

-

.

.

.. -. -.

.

.7.

,

p

...

.,

.

[

-

,

'

,

.Emeroency Operations Facility (EOF)

,

"

Several exercise strengths were identified.

l '.

There was an excellent interface with the representatives of the

'

Commonwealth of Massachusetts located in the EOF.

2.

Classifications made in the EOF were prompt.

3.

The Dose Assessment staff was knowledgeable and performed a t

variety of calculations based upon the known source term and i

postulated release paths.

4.

Protective Action Recommendations (PARS) were well-reasoned and conservative. Data and information regarding the formulation of the PARS was freely shared with the representatives of the

j Commonwealth of Massachusetts.

i

'

5.

The Dose Assessment staff compared actual field team results with calculated results and promptly resolved differences.

'

No exercise weaknesses were identified.

Two areas for improvement were brought to the licensee's attention.

>

1.

A SAM-II was not operable because of dead batteries and a portable generator was out of gas. The licensee should examine equipment t

,

l'

backup capabilities when there is instrument failure due to

batteries, as well as their preventative maintenance program to detect problems prior to equipment use.

2.

Two programming errors were noted in the dose assessment programs:

the units of entry were not specified (MREM vs REM); and the changing colors representing evacuation and shelter results when

!

I-screens are changed.

t Media Center

'Several exercise strengths were identified.

1.

Press briefings were informative and response to questions was very good.

2.

Press releases were accurate.

i No exercise weaknesses were identified.

!

'

i One area of improvement was brought to the licensee's attention.

1.

The briefing room in Memorial Hall is very noisy.

The licensee should consider methods to reduce noise levels in this area, particularly during press briefings.

,

!

,

<

l

. -..

. - -..

-

- - - -

-

- - -

-

-

-

-

c o

.. -

j

,

-

<

.

l

-

l

J

'

Qyerall Conclusions

,

The NRC team noted that the 11cer.see's activation and augmentation of the j

emergency organization, activation of the emergency response facilities, and

,

use of the facilities were consistent with their emergency response plan and

implementing procedures. No exercise weaknesses were identified.

)

l

'

The licensee demonstrated the ability to implement the emergency plan in a manner which would have provided adequate protection for the health and safety l

of the public.

5.0 Licensee Critiaue and Exit Interview The licensee conducted an adequate self-critique of the exercise. There were no exercise weaknesses identified, following the licensee's self-critique, the NRC team met with the licensee representatives listed in Section 1 of this report to present exercise observations as detailed in this report.

At no time during this inspection did the inspectors provide any written information to the licensee.

.

~

l l

l l

._.

r.. _. _.

. L. _.

~ ~ ~ _ _ _ __ _

_..-

...... _ _.

.

.... _ _... _.

.. ___,_. Z atpaceuCTistettegg

-

-

,,

,

..

1.

ftjgigjg

we shsra maa anAncu Fass/eass cumsta un t.

$NOR1 ItSCRIPfl0K (Incivde Docket to.

Insp. he. or key reference number)

'

$O'rE bll 3.

InsitWCTI0lts a.

CDPfA Cys of originals I

Cys 766/?66.A Forms Cys of entire packspe w/o bec's

'b Cys NAC:! Fors 6 3 2 N'

Cys of entire packspe with bct's SPICIAL INSTRUCTIONS:

Cys of entire pack 6pe with bec's and concurrences (avitiple dec.

het numbers 6dd one copy for e6th 6dditional docket n.aber).

Cys of report only Cys of Licensee's letter did l

Cys of [nf. Ltr with bcc's (w/o enc 1 for M6hopement Assistant)

I1 C 5 ef inspector's tvels etion meno and/or... :..:-

--

-

-

Ie. ion i roms i.

r

.

T klDS dn }1 b.

Ollik!DU110k i

c 0$$ (Origine) Concurrence Copy)

s c--

Code Other

-

I k

Region 10$$ with concurrences

-

Suspense (avitiple dockets.one copy e6th e

docket file).

I Relfdent Inspector State Copy CC's

,

4.

Uk&[W1 tfCMJ($f APPROVAL DAT[

5.

AlfL'th COMPL(1(0 tcRK T0:

Originator 055 6..

Date ad Time In:

M-M hte and fire Out:

7.

Date Disootched:

RfG10ftI f0RM 45

-

Febrvery 1987 (Rev.)

J c