Forwards Safety Insp Rept 50-293/89-11 on 891010-13.No Violations Noted.Util Performance During Exercise Demonstrated Ability to Implement Emergency Plan & Implementing Procedures in Manner Providing Protection
ML19327B959
Person / Time
Site: Pilgrim
Issue date: 11/01/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML19327B960 List:
References
NUDOCS 8911140267
Download: ML19327B959 (2)


See also: IR 05000293/1989011

Text

e

.

/

n.t -

,

,

k , , e. ,

'

n

y

'

,.

.

.,

?*,

..

V

!

<

n'

NOV 011989

i

!

s

,

V

i

-Docket No.- 50 293

License No. DPR-35

- '

'

Boston Edison Company

'

ATTN: Mr. Ralph G. Bird

.

Senior Vice President - Nuclear

' Pilgrim Nuclear Power Station

RFD #1 Rocky Hill. Road

1

Plymouth, Massachusetts 02360

i

Gentlemen:

Subject:

Inspection No. .50-293/89-11

A routine, safety inspection of your annual full-participation emergency

'

pre >aredness exercise was conducted by Mr. C, Conklin of this office and other

mem>ers of an NRC team on October 10-13, 1989 at your Pilgrim Nuclear Power

"

Station, Plymouth, Massachusetts. Discussions of our findings were presented

'

.

. by Mr. Conklin to you and other members of your staff at the conclusion of the

L

'

'

inspection.-

.g

Areas examined during this inspection are described in the NRC Region I

.

)

Inspection- Report which is enclosed with this letter. Within these areas, the

-inspection consisted of selected examination of procedures and representative

-

records, interviews with personnel, and observation of the emergency exercise

by team members.

l

Within the scope of this inspection, no violations were identified.

Boston

,

"

Edison Company's performance during the exercise' demonstrated the ability to

implement the Emergency Plan and Implementing Procedures in a manner that

would provide adequate protective measures for the health and safety of the

'

public.

No reply to this letter is required.

Your-cooperation with us in this matter

is appreciated.

<

Sgpqgg &tned By:

l

nscaldR. Bello"V

Ronald R. Bellamy, Chief

,

Facilities Radiological Safety

l

and Safeguards Branch

r

Division of Radiation Safety

,

and Safeguards

'

Enclosures:

,1. 'NRC Region I Inspection Report No. 50-293/89-11

,

I

\\

8911140267 891101

gDR

ADOCK 05

3

ge .

,

"[h(kf'([$.h:

..

.

.

-

-

" -

.

.

- -

-

-.

'

-

-

_

-

-

.-

,

h

~

i

..

. .

.

Boston Edison Company

2

NOV 01 1939

p

'

cc w/ enc 1:

.

-

K. Highfill, Vice President, Nuclear Operations

R. Anderson, Plant Manager

J. Dietrich, Licensing Division Manager

i

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable John F. Kerry

,

~ The Honorable Edward J. Markey

Tho Honorable Edward P. Kirby

,

The Honorable Peter V. Forman

The Honorable Lawrence R. Alexander

The Honorable Nicholas J. Costello

B. McIntyre Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

.'

Plymouth Civil Defense Director

' P. Agnes Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resources

R..Shimshak, MASSPIRG

,

Public Document Room (PDR)

Local Public Document Room-(LPDR)

Nuclear Safety Information. Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

FEMA Region I

becw/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

W. Russell, RA

J. Dyer, EDO

.

D. Wessman, NRR

.

D. Mcdonald, NRR

S.. Collins, DRP

J. Johnson, DRP

R. Blough, DRP

C. Marschall, SRI - Pilgrim-(with concurrences)

PA0(21)

BeNy

Con

L

us

10//#)/89

10/h89

1(/(/89

0FFICIAL RECORD COPY

.

e v.

. . -

y- - . . , -

u-r. , . , , . .

-,.._..m-_

, . . . , - , , , -

- . , _ , . . . . - - - - - , , . , . - _ . . - - , , ,

-