Forwards IE Insp Rept 50-286/81-15 on 811026-30 & Notice of Violation.Notice & Rept Withheld (Ref 10CFR73.21)
ML20049J142
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/23/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 8203120144
Download: ML20049J142 (2)


Text

c

}f[idNM T f O D Q " T K[ b10Jd.2 [3 _'_ b@

T

.

'

@T

'

W EE)

_ lu i.

lL

%' '

2 3 FEB 1982 Docket No. 50-286

 % / $

.-

&,

'

,

Power Authority of the State of New York

%g

)

Indian Point 3 Nuclear Power Plant C-hf4g22 g g r

ATTN: Mr. J.C. Brons

- '

F s

Resident Manager

{

P.O. Box 215

.

Buchanan, New York 10511

-

Gentlemen:

M Subject:

Inspection 50-286/81-15 This refers to the routine physical protection inspection conducted by Miss Lisa McKeown of this office on October 26-30, 1981 at the Indian Point 3 Nuclear Power Plant, Buchanan, New York of activities authorized by NRC License No. OPR-64 and to the discussions of our findings held by Miss McKeown with yourself and members of your staff at the conclusion of the inspection, and to a subsequent telephone discussion between Miss McKeown and Mr. J. Dube of your staff on November 4,1981.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the items of noncompliance brought to your attention in the enclosure to our letter dated June 2, 1981. We have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels described in the Federal Register Notice (45 FR 66754) dated October 7, 1980.

You are required to respond to this letter and in preparing your response, you should follow the instructions in Appendix A.

In addition to the need for corrective action regarding these specific items of noncompliance, we are concerned about the implementation of your management control systems that permitted them to occur.

Consequently, in your reply, you should describe in particular, those actions taken or planned to improve the effectiveness of your management control systems.

R1:DETI R1:DETI R-I

. ETI,f :DETI McKeown/wb Bailey n

o ne F T. Martin

>6&

t 2/2/82 D'G'

g f( [4 ~

a

/

as 0FFICIAL ECORD C P g

r=wr mms in~'

'

y, D

R

}

h h

pD

_.__..["U

Q G p p Q'{/d go {U L JQ

'

'Uji g'i 0203120144 B20223

,

'

PDR ADOCK 05000286 j

e j

)L j

_-

G ppa

!d

!

J Power Authority of the State of New York

2 3 FEB 1982

.

f In accordance with 10 CFR 73.21 of the NRC's regulations, documentation of security measures for the physical protection of special nuclear materials

>j and certain plant equipment vital to the safety of production or utilization

^

facilities are deemed to be Safeguards Information.

Each person who produces, receives or acquires Safeguards Information is required to ensure that it is protected against unauthorized disclosure. Therefore, except for the report cover sheet, the enclosures to this letter will not be placed in the Public Document Room and will be distributed pursuant to 10'CFP, 73.21(c).

The responses directed by this Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

l

Sincerely, i

y f

m

/'

homas T. Martin, Director

<

Division of Engineering and Technical Inspection Enclosures:

1.

Appendix A, Notice of Violation (Contains Safeguards Information)

2.

Office of 'nspection and Enforcement Inspection Report Number 50-286/81-15 (Contains Safeguards Information)

cc:

G. T. Berry, President and Chief Operating Officer (w/encls)

J. P. Bayne, Senior Vice President-Nuclear Generation (w/encis)

C. M. Pratt, Assistant General Counsel (w/encis)

A. Klausmann, Vice President - Quality Assurance (w/encis)

D. Halama, Quality Assurance Superintendent (w/encis)

J. F. Davis, Chairman, Safety Review Committee (w/encis)

K. Burke, Director, Regulatory Affairs (Con Ed) (w/encis)

J. Thoma, Project Manager (w/encis)

W. Harrington, Director of Security (w/encis)

Public Document Room (PDR)(w/ rpt. cover sheet only)

Local Public Document Room (LPDR)(w/ rpt. cover sheet only)

Nuclear Safety Information Center (NSIC)(w/ rpt. cover sheet only)

NRC Resident Inspector (w/encls)

State of New York (w/ rpt. cover sheet only)

bcc:

Region I 'scket Room (with concurrences)(w/a encis)

Chief, Operational Support Section (w/ encis)

Director, DRPI (w/ rpt. cover sheet only)

MLOSm2 CONTAINS SMTc e ;7:R O.IION.

tT G rd!7.71c37373 Fact Is rZCONH;0LLD OFFICIALRECp

.,

@A bh O [b

!

[

!

@) " r jd[ALM) J1j SE LU)U M

.

..

-

-

-.

. _.

.

-

.

._ -

__

-

.-

.