IR 05000247/1981016

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-247/81-16 on 810721-31.Major Areas Inspected:Security Organization,Physical Barriers, Lighting,Access Controls,Locks,Keys & Combinations.Details Withheld (Ref 10CFR2.790)
ML20054A789
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/13/1981
From: Bailey R, Devlin J, Dunlop J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20054A785 List:
References
50-247-81-16, NUDOCS 8204160154
Download: ML20054A789 (1)


Text

.'

I U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-247/81-16 Docket No. 50-247 License No. OPR-26 Safeguards Group IV Licensee:

Consolidated Edison Company of New York, Inc.

4 Irving Place New York, New York 10003

.

Facility Name:

Indian Point Unit 2 Inspection At:

Buchanan, New York Inspection Conducted:

July 27-31, 1981

'

Date of Last Physical Security Inspection:

October 6-10, 1980 Type of Inspection:

o tine, Un unound9f Physical Security Inspectors:

Y-SMM and J. Bai p Physical Pp tection Inspector date signed Nn

>J.

9-30 4/

Jack M. Du

, Phy idal Protection Inspector date signed e

/

Approved By: (

j/[/

L J/WFDevlin, Chief,PhysicalProtectionSection date signed j

Inspection Summary:

Routine, Unannounced Inspection on July 27-31, 1981 (Report No. 50-247/81-16)

Areas Inspected:

Implementation and compliance with the accepted physical security plan relative to the Security Program Audit; Security Organization; Physical Barriers, (Protected Area), (Vital Area); Lighting; Access Controls, (Identification), (Search), (Escorting), and (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; and Records and Reports.

Followup on licensee action on previously identified items of noncompliance related to physical security.

The inspection involved 75 inspector-hours onsite by two NRC regional based inspectors and commenced during regular hours; 6 inspection hours were accomplished during off shift periods.

Results:

The licensee was found to be in compliance with NRC requirements within 21 areas examined during the inspection except for the following item:

Records-Failure to properly maintain Key Control Log (Paragraph 23).

Region I Form 167 (August 1979)

8204160154 811120 PDR ADOCK 05000247 O

PDR l