k U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No: 50-282/86008(DRS);50-306/86010(DRS)
,
Docket No. 50-282; 50-306 License No.: DPR-42; DPR-60 Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Nan:e: Priaire Island Nuclear Generating Plant, Units 1 and 2 Inspection At: Prairie Island Site, Red Wing, MN Inspection Conducted: June 30, 1986
[h 7)9)f4.
Inspector
. E. Jones Date
,
ab71M <
h
~__)/7/l%
Approved By:
D. H. Danielson, Chief
_
Materials & Processes Section 0 ate Inspec_ tion Sumary Areas InspectedT~RoiitiiiF u_n(annouTc'ed inspectiin~ o_8]~DRS);_50-306-8601 Inspection on June 30 1986 Report No. 50-282/8600
~
~
~
f the resoTution of an IE Bulletin.
Results: No violations or deviations were identified.
a 8607230175 860717
'
PDR ADOCK 05000282 O
,
,
b
., _ -. - - -,,
-.7
... -, _.,,.. _,
-, -.... _,,., _,
,,
-
._,m
.
_. --...,.,,
,,, n
,
__
_
.
_
_
__
_
_-
-_
.
.
,
Details
"
i 1.
Perrert. Certacted Northern Sta_tes Power _ Company (NSP)
.
- M. Thomas, Production Engineer i
U.S. Nuclear _Regulato_ry_ Commission _(N_R_C)
t
- J. Hard, Senior Resident Inspector
- Denotes those present at the exit interview cn June 30, 1986.
2.
Licensee Action on an IE Bulletin i
~
(Closed) IE Bulletin (282/83-03-BB, 306/83-03-88):
" Check Valve Failures in Raw Water Cooling Systems of Diesel Generators."
.
i Followup on this item is documented in NRC Inspection Report No. 50-282/83-24;
'
i however, additional followup was required to verify the completion of the
.!
IE Bulletin requirements. The inspector reviewed the licensee's final response dated April 19, 1984. The licensee identified nine check valves addressed by the bulletin. Two of the check valves, CL-42-1 and 2CL-42-1, I
were granted reliefs from testing. The remainder are included in the valve testing program and receive either a forward and backflow test or disassembly.
Initial inspection in accordance with the requirements of the bulletin had been completed.
,
3.
_ Exit Interview
--
l The inspector net with site representatives (denoted in persons contacted j
paragraph) at the conclusion of the inspection. The inspector suntnarized scope and findings of the inspection noted in this report. The inspector
>
also discussed the likely informational content of the inspection report with regard to docunents or processes reviewed by the inspector during the inspection. The licensee did not identify any such documents / processes as proprietary.
,
.. - - -