IR 05000282/1978017
| ML19256A513 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 11/27/1978 |
| From: | Feierabend C, Warnick R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19256A510 | List: |
| References | |
| 50-282-78-17, 50-306-78-17, NUDOCS 7901080321 | |
| Download: ML19256A513 (4) | |
Text
.
.
.
'.
-
U. S. NUCLEAR REGULATORY COW.ISS10N OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-282/78-17; 50-306/78-17 Docket No. 50-282; 50-306 License No. DPR-42; DPR-60 Licensee: Northern States Power Coc:pany 414 Nicollet Mall Minneapolis, MN 55401 Facility Name: Prairie Island Units 1 and 2 Inspection At: Prairie Island Site, Red Wing, MN Inspection Conducted: October 5, 6, 10, 11, 15-20, 23-27, and 29-31, 1978 R FU) W Inspector:
C. D. Feierabend
_JJ -J. 7 - 7 8 R F LOO Approved By:
R. F. Warnick, Chief J/- 2 7-78 Reactor Projects Section 2 In sy_e c_t_f on Summa ry Jup.e_c_t_ipnan__0_c.tober_5,__6;_1_0;_11;__15-20, 23-2_7; and 29-31, 19 78
.0Le2o.r_t_No. 5_0-2 8f_L7,8 _17.;_5_0-3.0_6]_78-17)
o Are_a s_ In sp_e_c_t_e_d_:
'outine Resident Inspection of plant operations, radiation protection, security, maintenance, preparation for refueling and receipt of new fuel. The inspection involved 118 inspector-hours onsite by one
,
NRC inspector.
Results: No items of noncompliance or deviations were identified.
i t
.
.
?90108 0~5 > \\
..
... _.. _..... - _..._..
.
..
.
_ DETAILS
.
1.
Personnel Contacted
- P. Tierney, Plant Manager J. Erokaw, Superintendent, Operations and Maintenance E. Watzl, Superintendent, Plant Engineering and Radiation Protection
- A. Hunstad, Staff Engineer R. Lindsay, Operations Supervisor J. Nelson, Maintepanee Supervisor R. Conklin, Supervisor, Security and Plant Services D. Schuelke, Radiation Protection Supervisor R. Warren, Of fice Supervisor M. Sellman, ' lant EnEineer, Nuclear C. Sundberg, Instrument Engineer K. Slingsby, Computer Engineer
-
D. Cragoe, Shift Supervisor R. Held, Shif t Supervisor
J. Meath, Shift Supervisor i
D. Walker, Shif t Supervisor M. Mulhausen, Assistant Maintenance Supervisor
- Attended Exit Interview 2.
_P_lant Operations a.
Logs and Records Weekly reviews did not identify any areas of concern.
b.
Tours _of the Plant The inspector conducted tours of accessible areas of the plant to observe monitoring instrumentation, radiatiou controls.
- housekeeping conditions, fluid leaks, piping vibrations, selected valve and switch positions, and hold tags. The inspector also verified control room manning and equipment status and inspected for fire hazards.
No areas of concern were identified. The inspector noted minor flange and valve packing leaks that had been identified for repair and verified that radiation control procedures had been implemented where required.
.
!
i-2-
.
e o
e
>
.g
.
.
.
.
.
.
.
3.
Redirtion Protection a.
Exposur d ntrol The inspector examined several radiation work permits (RWP's)
and observed work being performed. No deficiencies were identified.
'
b.
_ Posting and Control Posting of high radiation areas (areas with dose rates between 100 mrem /hr and 1 Rem /hr.) showed some inconsistencies.
Soce areas with " hot spots" greater than 100 eRec/hr were designated as high radiation areas, although the area measurement
"whole body dose rate" was less than 100 mrem /hr. The licensee reviewed the RWP's and redesignated those that were over-conservative.
- The inspector observed that one RWP for a high radiation area i
did not designate a requirement for radiation monitor that continuously indicates the radiation dose rate, bewever, the operators authorized to enter the area are routinely required to wear the constant indicating monitor. The licensee took
,
inmediate action to add the requirement to the RWP.
No items of noncompliance were identified.
4.
Cleanliness The inspector reviewed the licensee's procedures for control of tools and access during refueling and for general control of housekeeping activities.
.
The inspector toured the accessible areas of the plant including Unit I containment and shield building. Housekeeping was good in all areas, with exception of storage of some scaffolding in the
'
Unit 1 shield building. The licensee plans to remove the scaffolding to be used during the upcoming Unit 2 refueling outage, and will provide a storage area in the auxiliary building.
No items of noncompliance were identified.
5.
Securin
,
The inspector conducted periodic observations of access control, issuing of badges, vehicle inspection, escorting, and communications checks.
.
No items of noncompliance were identified.
-3-
..
.
....
O
._.
...
.
.'
,
'
6.
Ma in t en an_qe_,
-
,
The inspector reviewed several work requests (WR's) and work request authorizations (WRA's) and verified that all required reviews and approvals had been completed. The inspector witnessed completion of work authorized by WRA-BS252-2CQ, to remeve actuators from Unit 1 Tan Coil Unit Discharge Dacper No. CD34078, verified that all Technical Specification requirements for testing redundant systems was cocpleted, and verified that system operability requirements were maintained.
The inspector observed preparations for containment entry, radiation survey and monitoring during the maintenance activity and surveys of components removed from containment. No areas of concern were identified.
7.
P_repa, ration for Refueling The inspector reviewed changes to the following procedures. No areas of concern were identified.
D2 - Draining the Reactor coolant System, revised 9/13/78.
D3 - Reactor Vessel Head Removal, revised 10/12/78.
D4 - Reactor Internals Removal, revised 10/12/78.
D7 - Reactor Vessel Closure, revised 10/12/78.
8.
]tegi t of__New Fuel f
_
The inspector reviewed chanEes to procedure D9, " Fuel Receipt," revised July 8, 1978. The inspector observed receipt inspection and transfer of two new fuel assemblies to storage locations and reviewed receipt records for other fuel assemblies. No areas of concern were identified.
.
9.
Exit Interviews The inspector attended an exit interview conducted by Mr. David Riden, RIII Inspector, and by the NRR Fire Prevention Evaluation Team on October 20, 1978.
The inspector met weekly with licensee representatives (denoted in Paragraph 1) and at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection. No items of noncompliance were identified.
-4-
.
..
.