Report No Docket No License No Licensee:
Facility Name:
Inspection At:
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
50-272/91-20 and 50-311/91-20 50-272 and 50-311 DPR-70 AND DPR-75 Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station. Units I & 2 Hancocks Bridge, New Jersey Inspection Conducted:
1991 Inspector:
Approved by:
(ERPS)
s, C ie,
ERPS, FRS&SB, adiation Safety and Safeguards
~~-v date Inspection Summary:
Inspection on July 8-12. 1991 (Combined Inspection Report Nos. 50-272/91-20 and 50-311/50-91-20)
Areas Insoected:
Routine, announced inspection of the licensee's radioactive liquid and gaseous effluent control programs including: management controls for these programs, calibration of effluent/process radiation monitors, air cleaning systems, and implementation of the Offsite Dose Calculation Manua Results: Very good routine liquid and gaseous effluent control programs were implemented by the Chemistry Departmen The licensee was pursuing the radiation monitoring system upgrading projects vigorously in the right directio However, two unresolved items which were identified in 1989 could not be closed during this inspectio Management attention and support are needed to resolve these items. Within the areas inspected, no violations or deviations were identifie PDR ADOCK 05000272 Q
- DETAILS Individuals Contacted Licensee Personnel R. Allen, Technical Supervisor, RP/Chemistry Department S. Branosky, I&C Supervisor
- D. Budzik, Maintenance Engineer J. Carey, Principal Electrical Engineer
- T. Cellmer, Radiation Protection/Chemistry Department Manager J. Dierickx, Technical Supervisor, RP/Chemistry Department
- P. Duca, Delmarva Power - Salem Site Representative E. Galbraith, Principal Chemistry Engineer,
- P. Galleshaw, Project Manager, E&PB
- J. Grimm, System Engineer
- R. Heaton, Senior I&C Supervisor
- M. LeFevre, External Affairs P. McNulty, Technical Supervisor, RP/Chemistry Department
- D. Miller, Radiation Protection and Chemistry Services L. Moore, Project Manager (HVAC)
- M. Morroni, Technical Department Manager
- T. Murphy, RMS Project Engineer, E&PB
- P. Ott, Technical Engineer
- V. Polizzi, Operations Manager F. Roberts, Senior Staff Engineer
- C. Rukes, Nuclear Licensing
- W. Schultz, Station QA Manager
- M. Shedlock, Maintenance Manager S. Simpson, Senior Supervisor, Radiation Protection
- E. Villar, Station Licensing Engineer
- C. Vondra, General Manager - Salem Operations
- R. Yewdall, Radiation Protection and Chemistry Services D. Zak, Technical Supervisor, RP/Chemistry Department NRC
- S. Barr, Resident Inspector
- A. Lopez, Reactor Engineer
- S. Pindale, Resident Inspector T. Johnson, Senior Resident Inspector
- Denotes those present at the exit interview*on July I2, I99 Other licensee employees were contacted and interviewed during this inspectio.0 Purpose The purpose of this inspection was to review the licensee's ability to control and quantify radioactive liquids, gases, and particulates during normal and emergency operation ~0 Review of Previously Identified Items (Open} Unresolved Item (UNR 50-272/89-10-02; 50-311/89-09-02} Provide air balance and relative humidity test results for air cleaning systems to the NRC. (See Inspection Report Nos. 272/89-10 and 311/89-09 for details.}
Regarding the air balance tests, the licensee established a task team (Salem HVAC Project Team) for the design, maintenance, and operation of the various HVAC systems in 199 The task team completed the material condition study and the project plan (Phase I-Initial Scoping) in September and December 1990, respectivel During the initial scoping, the task team identified lower air flow rates than designed for the auxiliary building ventilation systems of both units. These material study and initial scoping results were transferred to the "Salem Revitalization" program for management review in 199 Regarding the relative humidity tests near the charcoal filters, design basis calculations are being prepared to assess maximum and minimum humidity levels expected in the building considering all building loads, both latent and sensible, as well as outside design conditions. These calculations will be completed in the near futur The task team will request appropriate design modifications, as necessar Based orr the above review, this item remains open pending the progress of the Salem Revitalization program and the completion of the relative humidity test (Open) Unresolved Item (UNR 50-272/89-15-08) Oxygen concentrations in the Unit 1 waste gas decay tank exceeded Technical Specification limits and were not reduced within the required time. (See Inspection Report Nos. 50-272/90-16 and 50-311/90-16 for details.)
The root causes of this event were system design and procedural problem The inspector was informed that the procedure was being reviewed for the final approval as of July 12, 199 The system evaluation and recommendation results were transferred to the
"Salem Revitalization" progra This item remains open pending the procedure approval and the progress of the "Salem Revitalization" progra.0 Management Controls Program Changes There were no significant changes in the licensee's Radiologica Effluent Control Programs since the previ*ous inspection conducted on May 29-June 1, 199.2 Audit The inspector reviewed the 1990 audit report (Audit Number 90-151)
for radioactive effluent controls and implementation of the Offsite Dose Calculation Manual (ODCM).
The audit was conducted by the Nuclear Quality Assurance Departmen The inspector noted that the scope and technical depth of the audit were very good to assess the effluent control programs, and the recommendations were thorough and of good qualit The appropriate department responded to these recommendations in a timely manne.3 Review of Semiannual Reports The inspector reviewed the semiannual reports for 1990, and determined that Technical Specification requirement omissions or trends were note radioactive effluent release the licensee met the No anomalous measurements, Radioactive Liquid and Gaseous Effluent Controls The inspector examined selected radioactive liquid and gaseous release permits to determined the implementation of Technical Specification requirement The inspector also reviewed Procedure SC.CH-TI.ZZ-0189,
"Radiological Effluent Discharge Report Generation and Completion", and other related procedure Based on the reviews of radioactive liquid and gaseous releases permits and the associated procedures, including Procedure SC.CH-TI.ZZ-0189, the inspector determined that the licensee implemented the radioactive liquid and gaseous effluent control programs effectivel.0 Calibration of Effluent/Process Radiation Monitors The inspector reviewed the most recent calibration results for both units for the following effluent/process radiation monitors to determine the implementation of the Technical Specification requirement o Liquid Radwaste Effluent Line Monitors o Steam Generator Blowdown Monitors o Main Steam Line Monitors o Containment Fan Cooler-Service Water Monitors o Containment Vent Monitors o Plant Vent Effluent Monitors o Control Room Area Monitors The I&C Department has the responsibility to perform electronic and
t
radiological calibrations for all effluent and *process radiation monitor All calibration results were within the licensee's acceptance
. criteria. The inspector had no further questions in this are Although calibration results were within the licensee's acceptance criteria, the inspector determined that the licensee did not systematically trend the radiation monitoring system (RMS) versus known effluent releases to indicate monitor reliability. To track the reliability of radioactive liquid and gaseous effluent monitors, the Chemistry Department predicted the expected monitoring results prior to release [counts per minute (cpm)] using actual liquid and/or gaseous effluent sample counting results [microCi/cc (uCi/cc)] and appropriate radiation monitor sensitivity (cpm/uCi/cc).
The actual monitoring results were recorded in the radioactive liquid and gaseous release permit The inspector reviewed the predicted versus actual monitoring results and noted that the results did not always correspondenc The reasons appeared to be due to high background for the liquid RMS and variation of the plant vent flow rate (dilution factor) for the gaseous RM The inspector stated that the Chemistry Department had a good trending program to review the reliability of the effluent RMS and other departments (I&C and Operations) should utilize the progra The licensee stated that this program will be reviewed in the near future and implemented, as appropriat Based on the review of the above radiation monitor calibration records for both units, the inspector determined that the calibrations were performed as required by the appropriate procedures and by the Technical Specification.0 Upgrading Status of Radiation Monitoring Systems (RMS}
During the previous inspection conducted on May 29-June l, 1990, the inspector determined that the major root cause of events identified in Licensee Event Reports (LERs) and Special Reports was equipment failure, rather than inadequate procedures or personnel errors. The licensee generated 27 LERs during the period of August 1989 to September 1990 as a result of Emergency Safety Feature actuations due to malfunctions of various RM The licensee subsequently established short and long term projects to upgrade the RM During this inspection, the progress of these projects was discussed with the license The inspector also reviewed the Engineering and Plant Betterment Project Scope Proposal (EWR No. 062-89-1116),
"Radiation Monitoring System-Short Term RMS Modifications". This proposal contained (1) statement of problem, (2) objectives, (3) project team matrix, (4) project schedule, (5) issues and considerations, and other supporting document "
Based on the discussion with the licensee and the above proposal, the inspector determined that the licensee was pursuing these projects
. vigorously in the right directio The inspector stated that the progress of the RMS upgrading will be reviewed during a subsequent inspectio.0 Air Cleaning Systems The inspector reviewed the licensee's most recent surveillance test results to determine the implementation of the following technical specification requirements for both unit o Containment Building o Fuel Handling Area Ventilation Systems o Auxiliary Building Exhaust Air Filtration Systems o Control Room Emergency Filtration Systems The following inspection and test results for the above systems were reviewe o Visual Inspections o In-Place HEPA Leak Tests o In-Place Charcoal Leak Tests o Air Capacity Tests o Pressure Drop Tests o Laboratory Tests for the Iodine Collection Efficiencies All reviewed test results were found to be within the licensee's acceptance criteria. Based on the this review, the inspector determined that the licensee implemented the above Technical Specification requirements effectivel.0 Exit Interview The inspector met with licensee representatives (denoted in Section 1.1)
on July 12, 199 The inspector summarized the purpose, scope, and findings of the inspection.