IR 05000269/1988023

From kanterella
Jump to navigation Jump to search
Insp Repts 50-269/88-23,50-270/88-23 & 50-287/88-23 on 880801-05.No Violations Noted.Major Areas Inspected:Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts & Seismic Analysis for as-built Piping Sys
ML16127A224
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/06/1988
From: Blake J, Chou R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML16127A223 List:
References
50-269-88-23, 50-270-88-23, 50-287-88-23, IEB-79-02, IEB-79-14, NUDOCS 8809220182
Download: ML16127A224 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST.. ATLANTA, GEORGIA 30323 Report Nos.:

50-269/88-23, 50-270/88-23, and 50-287/88-23 Licensee:

Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-269, 50-270, License Nos.: DPR-38, DPR-47, and and 50-287 DPR-55 Facility Name:

Oconee 1, 2, and 3 Inspection Conducted August 1-5, 1988 Inspector:

t Date Sied Approved by:

sid J./ ake, Chief Dhte Signed Mat ri is and Processes Section En in ering Branch Division of Reactor Safety SUMMARY Scope:

This routine, announced inspection was conducted in the areas of pipe support base plate designs using concrete expansion anchor bolts (IEB 79-02),

seismic analysis for as-built safety-related piping systems (IEB 79-14), and the previous open item Results:

Two Unresolved Items (UNR) were identified on pipe supports di'screpancies and inadequate pipe support calculations, paragraph The licensee did a better job on pipe support modifications during

  • the latest Unit 1 outag Fewer discrepancies were found in the field during comparison of work with the as-built drawing The major work for IEB 79-02 and 79-14 have been completed by the license The licensee is currently working on the final documenta tion of revised calculations and as-built drawings based on the modifications and as-built conditions. Based on this inspection IEB 79-02 and 79-14 for all three units were close *,208 ':1 S9 c)

, !3Qoo269'

PDRP gALOC PO REPORT DETAILS 1. Persons Contacted Licensee Employees

  • E. Anderson, Design Engineer at Site
  • T. A. Barron, QA Technical Support Supervisor
  • C. Boyd, Design Office Manager at Site
  • R. Brown, Compliance D. Carpenter, QC Mechanical Inspector, Level II S. G. Crews, Supervising Design Engineer - General Office
  • W. G. Davis, CMD Technical Support Engineer
  • C. Harlin, Compliance Engineer R. Leatherwood, Project Engineer
  • J. R. McLean, Design Engineer - General Office
  • F. Owens, Compliance Supervisor J. B. Reeves, Senior Engineer - General Office P. Sherriff, QC Welding Inspector, Level II M. S. Sills, Principal Engineer - General Office
  • M. J. Tuckman, Station Manager Other licensee employees contacted during this inspection included craftsmen, engineers, mechanics, technicians, and administrative personne NRC Resident Inspectors P. H. Skinner, Senior Resident Inspector
  • L. D. Wert, Resident Inspector
  • Attended exit interview 2. Action On Previous Inspection Findings a. (Open)

Violation 50-269,270,287/87-31-01, As-Built Drawing Discrep ancies Compared with As-Built Condition This matter concerned the numerous discrepancies found between the as-built drawings and as-built conditions during the previous inspection The licensee response to the violation dated October 19, 1987, was received, evaluated, and found that it met the requirements of 10 CFR 2.20 The licensee response in the basis for denial was insufficient and no proposal for resolution was presente J

Per response, visual approximations were used instead of actual measurements for some of the dimensions on supports which were not critical to the ability of the supports to function as identified by the piping analysi The inspector reviewed the Oconee Procedure No. MP/0/A/3019/01, Pipe Surveillance Procedure for IE Bulletin 79-02 and 79-14 dated December 19, 1979 (Note, this procedure was for IEB 79-02 and 79-14 only and was deleted after completion of the walk down).

This procedure did not include the visual approximation method as an inspection metho Furthermore per the response, personnel of varied backgrounds, including technicians and engineers, were trained to conduct the surveillance using -Specification No. OS-0020.00-00-0002 and they were not sufficiently trained to make judgements and identify all discrepancie The Oconee surveillance procedure for IEB 79-02 and 79-14 as stated above, had prerequisites for personnel training and, in Section 6.1, stated that all team members must attend a training session on Specification N OS 0020.00-00-000 Therefore, the impermissible method used and insufficient training or personnel background created the numerous discrepancies in walkdown verifications for IEB 79-02 and 79-14. The licensee is requested to propose a resolution as a general solution for discrepancies between as-built drawings and as-found condition Pending the licensee resolution, this item remains ope The corrective actions for examples listed in the violation, such as justifications and revisions for drawings and calculations were reviewed and found adequat (Closed)

Unresolved Item (UNR)

50-269, 270,287/87-31-02,- Additional Information Required to Evaluate Pipe Support This matter concerned that 1" steel shim block for Support N A-0-6-0 400A-H41 was not shown on the drawing and an anchor spacing for Support No. 1-14B-0-4361-ASR13 appeared to have a violation with the adjacent suppor The inspector discussed the matter with the licensee's responsible engineer and reviewed the information provide The response for File Nos. OS-161 and OS-27 dated October 15, 1987, was reviewed. Variation Notice (VN)

N OP-4231 had been written to identify the additional shims on the expansion anchors. The support drawing and calculation will be revised to show these shims which are acceptable as installed. The 3-1/2".anchor bolt edge distance for Support No. 1-14B-436L-WJB-1011 to the edge of the adjacent unistrut was measured by the licensee engineer. This meets edge distance requirements of 3-1/2" for 1/2" self-drill anchor VN N OP-4230 was written for the corrected action Calculation Rev. 2 and Drawing Rev. 2 were revised to show the center distance from the adjacent support. To resolve this problem, the licensee's Concrete Expansion Anchor Installation Procedure No. MP/O/A/1800/35 dated August 8, 1983, requires *that, for new installation of wedge

.and sleeve type expansion anchors, the spacing between an anchor and unistrut meet the specified-minimum edge distance or install the anchor so that the depth of the anchor is equal to its minimum embedment plus the depth of the embedded unistru This item is considered close (Closed) Inspector Followup item (IFI)

50-269,270,287/87-31-03, Safety-related Piping Systems Maintenance. This concerned the piping system maintenance such as a loosened nut, bolt, damaged part, contacting with other pipe or support, corrosion, etc. The inspector discussed this matter with the licensee's responsible engineer and reviewed the information provided (File N OS-161 and OS-27, dated October 15, 1987).

Work Request N C has been written to tighten the clevis on the rod. for the loosened Support N A 400B-TLM-211 A Station Problem Report was written to resolve the two rod supports for other pipe contacting the pipe supported by Support No. 1-14B-0-436L-ASR14. Specification No. OS-0027.00-00-0002 was revised in January 1984 to ensure adequate clearances are maintained on new installations. Work Request No. 95823C was written to correct the identification tags on Support No. 2-01A-4-0-1400-H4, 2-51A-436E-FAC-2803, and 2-51A-1444-WSS-2902. Problem Investigation Report No. 4-087-0171 was written and documented that Support No. 3-53B-5-0-2435B-SR38 had a Hydraulic Snubber Reservoir contacting the vertical member of the support. This information has been shown on the support sketch and documented in the calculation. In addition to the above corrected actions, the licensee engineer also stated that the inservice inspection program such as QA QCPM Procedure N OCL-14, Inservice Inspection (ISI)

Visual Examination VT-3 and VT-4 is to provide the examination requirements for personnel performing ISI Visual Examination for the general mechanical and structural condition of components and pipe supports such as loose, missing, broken parts, bolting, fasteners, corrosion, distortion, deformation, etc. Based on the licensee corrected actions as stated above, this item is considered close (Closed)

Violation 50-287/87-31-04, Inadequate Pipe Support Qualifi cation This matter concerned the Design Calculations for Support N Al-0-2400A-R1 used the wrong member properties in the computer model and analyses (STRUDL).

The member properties of a 6-inch beam (W6 x 20) was used for Item No. 7 in computer model to qualify the support. The actual size of the member was a 4-inch beam (W4 x 13)

as shown on the design drawing and verified in fiel The response to the violation dated October 19, 1987, and the information provided was reviewed by the inspector. The Design Calculation and Drawing for this support were revised to reflect Problem Investigation Report (PIR) No. 4-087-0157 which was. written to indicate the actual field condition on the member edges cut-off and no weld at cut-off are The revised calculation.also included.the justification for the wrong member size input for computer, member cut-off, and the weld not existing in fiel Both revisions for calculation and drawing did not reflect the actual conditions clearl The licensee engineer agreed to revise the calculation and drawing again to show the

conditions clearly. The-response denied the-violation. On the basis of denial, the licensee admitted that a discrepancy was noted during the IE Bulletin 79-14 surveillance, in that Item No. 7 was actually a W4 x 13 beam instead of a W6 x 20 beam as shown on the previous design drawing and as modeled in the calculation. The response also stated that the responsible engineer attached an updated drawing to the calculation package to show the corrected beam size but did not update the support calculation to note the acceptability of the.bea Both the walkdown surveillance sketch and Drawing Rev. 0 showed the W4 x 13 for Item N for this support were included in the design calculation. The support design calculation and computer model were based on one of the No evidence was found to show that the licensee engineer reviewed the member size chang Therefore the basis for denial is unacceptabl The violation 50-287/87-31-04 remains but the item is considered closed based on the licensee corrected action shown abov.

Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve violations or deviation Two unresolved items identified during this inspection is discussed in Paragraph. (Closed)

Pipe Support,Base Plate Using Concrete Expansion Anchor Bolts (IEB 79-02)

and Seismic Analysis for As-Built Safety-Related Piping Systems (IEB 79-14)

a. Status Report A brief report from the licensee on the current status of IEB 79-02 and 79-14 at Oconee Nuclear Station dated February 4, 1988, was received. The report listed 13 pipe supports with modification work remaining as of December 1, 198 It means that the licensee have completed about 260 support modifica tions for Unit 1 during the latest outage around November 1987. The report stated that the target date for the completion of all paper work on Units 2 and 3 is the fourth quarter of 1988, with Unit 1 to be scheduled for a later date. The majority of support modifications for all three units have been complete b. Walkdown Reinspection To check the licensee performance on the pipe support modifications on Unit 1 which were completed during the latest outage, the inspector randomly selected 18 pipe supports which were accepted by the licensee QC inspection. The walkdown reinspection was completed

with the assistance from the--licensee --engineer,--QC-mechanical inspector, and QC welding inspecto The supports were partially reinspected against their detail drawings for configuration, identification, fastener/anchor installations, member size, weld sizes, component identification numbers, dimensions, rust, mainte nance, and damage/protectio Listed below contains supports with walkdown reinspection, calculation review or workplan revie All pipe supports are in Unit 1 except 2-03A-1-0-400B-SR17 is in Unit TABLE I SUPPORTS REINSPECTED, WORK PLANS REVIEWED AND CALCULATIONS REVIEWED SUPPORT WORK PLAN CALCULATION REV. REIN-RE-RE SUPPORT N NO. SPECTED COMMENTS VIEWED COMMENTS VIEWED COMMENTS 1-01A-1-2-0-401A-H50

V None V

None V

Note 5 2-03A-1-0-400B-SR17

V Note 1 V

None V

None 1-07A-400A-DE032

V Note 2 V

None V

None 1-07A-6-0-402A-H1O

V None V

None

/

None 1-03-0-551-DE002

V None V

None V

None 1-08-400H-H4043 C

V None V

None V

None 1-14B-0-436L-ASR15

V Note 3 V

None

/

Note 6 1-14B-0-1436C-ASR21

N/A V

None V

None 1-51-0-437B-ARM-2004

V None V

None V

None 1-54A-1-0-435B-H35 0*

V None

/

None V

N/A 1-54A-1-0-435B-H34

V Note 4 V

None 1-51-0-439C-0E095 B

V None V

None 1-51-o-439C-DE096

/

None.

None 1-03-0-439B-H54

N/A V

Note 7 1-03A-1-0-439A-H24

V None V

None 1-53B-0-435B-DE066

.3 V

None V/

None 1-53B-5-0-435-R8

V/

None V/

None

SUPPORT WORK PLAN CALCULATION RE REIN-RE-RE SUPPORT N NO. SPECTED COMMENTS VIEWED COMMENTS VIEWED COMMENTS (cont'd)

1-53B-5-0-435B-R24

V None V

None 1-53B-0-435B-DE065

/

None V

None 1-53B-0-435B-DE067

V None V

None

  • Rev. 0 and Variation Notice (VN)

OP-4147 N/A

-

Not Applicable Notes:

1. (a) Fillet weld was measured less than 3/16" at a connection between top of Item Nos. 2 and 1 and drawing showed 1/4".

(b) -Extra weld at a connection between bottom of Item No. 1 and column flang. (a) W dimensions for Item N were measured 3'-8-3/4" and drawing showed 2'-6".

(b) Fillet welds were measured 3/8" at connections at Section Q-Q between Item N and the exist beam W24 x 68, between Item Nos. 22 and 31, and between Nos. 22 and 2. Two vertical angles L2 x 2 existed at field for restraints at the lateral direction and drawing was not show. The plate thicknesses for Item No. 1. were measured 5/8" and drawing showed 3/4". Joint release for joint 8 at page 3 of computer analysis should be member end releas.

Anchor bolt (sleeve)

capacity for Item N (HN 3440) should be Ft = 9200#,

FV = 11500# per pale 21 of Specification N OS 0027.00-00-0001, Rev. 7. Calculation page 55 uses Ft = 11500#,

  • FV = 17000# which is for wedge anchor bolt. (a) In page 37 of calculation, the following changes should be made:

(i) For f2, Cy = 2.5" should be used instead of Cx = 3" (ii) f3 should be calculated for shear loads at X-direction due to torston = 106229"#

'(b) -In-page 38 of calculation, the following changes should be made:

(i) For f2, shear load due to Fy = 11182#.should be adde (ii) f3 should'be calculated for shear loads at x-direction due to torsion = 106229"#

After the calculation was revised, the weld required doubled from the original calculatio Fortunately, the weld provided was triple the original calculation require c. Work Plan Reviewed Ten support work plans verified by QC inspectors were reviewed as shown in Table Oconee Specification No. OS-0027.00-00-002 was used for inspection for support drawings and tolerance Anchor bolts were installed in accordance with Oconee Procedur Generally, work plan includes (a) Enclosure 13.1, Procedure Checklist and Anchor Data, (b) Enclosure 13.2, Pipe Support Data Sheet, (c)

Enclosure 13.3, Task Description and Required Work, (d) Enclosure 13.4, Data Sheet for Anchor Replacement and U-Bolt Installation (Tight Fit),

(e)- Enclosure 13.6, QC Acceptance Requirements, and (f) Enclosure 13.8, Discrepancy Worksheet plus the other special procedures for components such as snubbers, spring can, sway strut, grouting, et Procedure MP/0/A/3018/58, Mechanical Snubber - Removal, Installation, and Repair of Structural Connections was used for Support No. 1-07A 400A-DE032 to check the snubber installation which include log sheet, snubber diagram, mechanical snubber sketch, spacer washer, and torque specification. Procedure No. MP/O/A/3019/05, Spring Can -

Removal, Repair Installation, Adjustment, Locking and Unlocking was used for Support N A-6-0-402A-H1O to check hot load and cold load setting, travel stop removal, and legibility -of load indication plat Procedure No. MP/O/A/3019/09, Sway Struts and Snubber Extension Pieces -

Field Modification was used for Support No. 1-03 0-551-DE002 to check the extension piece dimensions and weldin Preheat was used for welding preparation in supports which had the plate or member thickness greater than 3/4".

No discrepancies were found in the work plan revie Calculation Reviewed Nineteen pipe support design calculations were partially reviewed and evaluated for thoroughness, clarity, consistency, and accurac In general, the design calculations were of good quality except as stated in Notes 5, 6, and 7 in Table 1. The calculation contains the loading data, calculation and analysis, support sketch, computer input and output, and baseplate analysis input and outpu Finding--and Results-The above discrepancies found in Table 1 for walkdown reinspection and calculation review were discussed with the licensee engineers and OC inspectors. The licensee responsible engineers had evaluated the discrepancies found and concluded no operability concer Pending the licensee review and revisions on the drawings and calculations, the discrepancies found during the walkdown reinspection as stated Notes 1, 2, 3, and 4 in Table 1, are identified as a new open item Unresolved Item (UNR)

50-269/88-23-04, Pipe Support Discrepancies between the As-built Drawings and Field Condition Pending the licensee review and revisions on the pipe support calculations due to the inadequate qualification as stated in Notes 5, 6, and 7 in Table 1, this item is identified as a new open item UNR 50-269/88 23-05, Inadequate Pipe Support Calculation No violation or deviations were-identified during the inspectio f. Bulletin Closure The NRC Region II Inspection Report Numbers 50-269/79-17, 79-22, 79-27, 79-39, 80-02, 81-20, 82-18, 85-13, 87-31 for Unit 1, 50-270/

79-20, 79-25, 79-36, 80-01, 81-20, 82-18, 85-13, 87-31 for Unit 2, and 50-287/79-13, 79-16, 79-22, 79-27, 80-01, 81-20', 82-18, 85-13, 87-31 for Unit 3 were performed for IEB 79-02 to verify and review the procedures, inspection programs, analytical methods, modifica tions, and documentations for the concrete expansion anchor bolt The NRC Region II Inspection Report Numbers '50-269/79-27, 79-39, 80-02, 81-20, 82-18, 85-13, 87-31 for Unit 1, 50-270/79-25, 79-36, 80-01, 81-20, 82-18, 85-13, 87-31 for Unit 2, and 50-287/79-27, 80-01, 81-20, 82-18, 85-13, 87-31 for Unit 3 were performed for IEB 79-14 to verify and review the procedure, inspection programs, analytical methods, modi.fications, and documentations for the as-built safety-related piping systems. The majority of the required modifications and documentations for IEB 79-02 and 79-14 has been completed by the license The status, report submitted by the licensee stated at Paragraph 4.a listed 13 pipe support mo.difications remaining and to be completed at the later dat Pending the licensee completion on the remaining support modifications, this item is identified as a new open item IFI 50-269, 270, 287/88-23-01, Pipe Support Modifications Remaining for IEB 79-02 and 79-1 The same status report also stated that all documentations are to be completed by end of 1988 for Units 2 and.3 and 1989 for Unit The above documentation completing schedules also were confirmed by the licensee station manager during the exit meetin The final summary reports for IEB 79-02 and 79-14 for all three units are to be submitted to the NRC Region II after each unit is completed in documentation at the separate time. Pending the licensee completion on documentations and final summary report submissions for each unit for IEB 79-02 and 79-14, these items are identified as new open items IFI 50-269,270,287/88-23-02, Final Summary Report for IEB 79-02 and IFI 50-269,270,287/88-23-03, Final Summary Report for IEB 79-1 The inspector aTso perfonfmed walkdowns and reviews in this inspection as stated in Paragraphs 4.b, 4.c, and 4.d to verify the. licensee performance and commitments on IEBs 79-02 and 79-1 Based on the previous inspection reports, this inspection, and the licensee agreement on the status report and exit meeting, IEBs 79-02 and 79-14 for Units 1, 2, and 3 are considered closed except for violation 50-269,270,287/87-31-01 and the new open items as stated in Para graphs 4.e and. Exit Interview The inspection scope and results were summarized on August 5, 1988, with those persons indicated in Paragraph 1. The inspector described the areas inspected and discussed in detail the inspection results.listed belo Although reviewed during this inspection, proprietary information is not contained in this report. Dissenting comments were not received from the license (Open)

IFI 50-269,270,287/88-23-01, Pipe Support Modifications Remaining for IEBs 79-02 and 79-14 (Open) IFI 50-269,270,287/88-23-02, Final Summary Report for IEB 79-02 (Open) IFI 50-269,270,287/88-23-03, Final Summary Report for IEB 79-14 (Open)

UNR 50-269/88-23-04, Pipe Support Discrepancies Between the As-built Drawings and Field Conditions (Open) UNR 50-269/88-23-05, Inadequate Pipe Support Calculations