Insp Repts 50-269/88-22,50-270/88-22 & 50-287/88-22 on 880801-05.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan Implementing Procedures & Organization & Mgt Control
ML16127A221
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/29/1988
From: Decker T, Kreh J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML16127A220 List:
References
50-269-88-22, 50-270-88-22, 50-287-88-22, NUDOCS 8809140463
Download: ML16127A221 (6)


Text

p. EG UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, ATLANTA, GEORGIA 30323 AUG 3 1 1988 Report Nos.:

50-269/88-22, 50-270/88-22, and 50-287/88-22 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-269, 50-270, License Nos.: DPR-38, DPR-47, and and 50-287 DPR-55 Facility.Name: Oconee Nuclear Station Inspection Co ducted: August 1-5, 1988 Inspector:

<YO6 S'

U U. Kreh Date Signed Approved by">JL.4<

Z-/

~~'

T. R. Decker, Section Chief Date Signed Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection was conducted in the area of emergency preparedness and included review of the following programmatic elements:

(1) Emergency Plan and Implementing Procedures; (2) emergency facilities, equipment, instrumentation, and supplies; (3) organization and management control; (4) training; and (5) independent reviews/audit Results: In the areas inspected, violations or deviations were not identifie The findings of this inspection indicated that the licensee was prepared to respond effectively to an emergency at the Oconee Nuclear Statio PDR ADOCK 05000269 PNtJ

REPORT DETAILS 1. Persons Contacted Licensee Employees S. Baldwin, Nuclear Production Engineer

  • C. Harlin, Compliance Engineer E. Hogan, Environmental Compliance Coordinator W. Horton, Shift Supervisor
  • C. Jennings, Station Emergency Planner
  • F. Owens, Shift Supervisor, Regulatory Compliance C. Sheridon, Shift Supervisor
  • M. Tuckman, Station Manager

.*C. Yongue, Station Health Physicist Other licensee employees contacted during this inspection included operators, technicians, and administrative personne NRC Resident Inspectors P. Skinner

  • L. Wert
  • Attended exit interview 2. Emergency Plan and Implementing Procedures (82701)

Pursuant to 10 CFR 50.47(b)(16),

10 CFR 50.54(q), Appendix E to 10 CFR Part 50, and Section P of the licensee's Emergency Plan, this area was inspected to determine whether significant changes were made in the licensee's emergency preparedness program since the last routine inspection (July 1987), and to assess the impact of any such changes on the overall state of emergency preparedness at the facilit The inspector reviewed the licensee's program for making changes to the Emergency Plan and the Emergency Plan Implementing Procedures (EPIPs).

The inspector verified that the Station Manager approved all revisions since July 1987 to the Emergency Plan and EPIPs, and that all such changes were submitted to the NRC, as require Current controlled copies of those documents were observed to be available in the Control Roo Documentation of the required annual review of the Emergency Plan and EPIPs was provided to the inspector. This was a coordinated review which considered the Plan and its implementing procedures as an integral

"package". The licensee's review was completed on October 19, 198 Through review of Emergency Plan revisions and.discussions with licensee representatives, the inspector concluded that no significant programmatic changes were made in the subject area since the July 1987 inspectio Three emergency declarations were made since the last inspection; each was classified as a Notification of Unusual Event. The dates of these events were March 4, April 18, and May 5, 198 Review of the licensee's documentation of these occurrences disclosed no significant problems in the implementation of the Emergency Pla No violations or deviations were identifie. Emergency Facilities, Equipment, Instrumentation, and Supplies (82701)

Pursuant to 10 CFR 50.47(b)(8)

and (9),

Section IV.E of Appendix E to 10 CFR Part 50, and Section H of the licensee's Emergency Plan, this area was inspected to determine whether the licensee's emergency response facilities and other essential emergency equipment, instrumentation, and supplies were maintained in a state of operational readines The inspector toured the Control Rooms, Technical Support Center (TSC),

and Operational Support Center (OSC).

Two significant improvements were noted at the OS First, a local PA was installed in the.staging area for use by the OSC Coordinator in locating personnel for repair mission Second, permanent shielding was erected in the corner of the OSC Command Room around the vertically oriented recirculation piping from the Spent Fuel Poo In the past, despite the placement of temporary shielding, radiation levels occasionally in excess of 100 mR/hr at the pipe surfaces resulted in part of the OSC being roped off as a Radiation Are The permanent shielding was designed to preclude recurrence of this potential impediment to OSC operation During April 1988, the licensee's primary meteorological measurement system was moved from the onsite microwave tower located about 850 feet WNW from the station center to a new tower across highway and about 2400 feet NW from the station center. The immediate reason for this change was.the construction of a seven-story office building between the reactor buildings and the microwave towe In addition, the current meteorological system, unlike its predecessor, was designed in accordance with the criteria of (proposed) Regulatory Guide 1.23, "Meteorological Programs in Support of Nuclear Power Plants," dated September 198 At the time of the inspection, the licensee was in the process of revising procedure RP/0/B/1000/12 (Determination of Protective Action Guides by Control Room Personnel or Emergency Coordinator During a Radiological Accident) in order to incorporate technical changes associated with the new meteorological system, including the capability of indicating Class G atmospheric stability. An internal letter dated April 25, 1988, from the Station Emergency Planner to Operations, specified the use of default values for meteorological parameters until RP/O/B/1000/12 could be appropriately revised. (The upgraded meteorological system was calibrated and fully operational as of April 23, 1988.)

The Station Emergency

Planner informed the inspector by telephone on August 11, 1988, that the revised version of RP/O/B/1000/12 had been issued that day. Appropriate changes to the computerized version of this procedure were being develope The inspector reviewed the status of Oconee's permanent Crisis Management Center on Isaqueena Trail in Clemson, South Carolina. The facility was in a very early stage of construction; completion and turnover were expected to occur in mid-198 The inspector reviewed documentation of monthly emergency communications tests and equipment checks (performed in accordance with procedures PT/O/B/2000/02 and HP/O/B/1009/01, respectively) for the period July 1987 to May 198 The records indicated that problems detected during the performance of these procedures were corrected expeditiousl No violations or deviations were identifie. Organization and Management Control (82701)

Pursuant to 10 CFR 50.47(b)(1)

and (16),

Section IV.A of Appendix E to 10 CFR Part 50, and Section B of the licensee's Emergency Plan, this area was inspected to determine the effects of any changes in the licensee's emergency organization and/or management control systems on the emergency preparedness program, and to verify that any such changes were properly factored into the Emergency Plan and EPIP The organization and management of the emergency preparedness program were reviewed. The inspection verified that there were-no significant changes in the assignment of responsibility for the station and corporate emergency planning staffs since the last inspectio A program improvement occurred in March 1988, with the appointment of a full-time assistant to the Station Emergency Planne Personnel changes in certain station management positions resulted in the reassignment of several key positions involving primaries as well as alternates in the emergency response organizatio Review of training records of such personnel confirmed that training requirements for their new positions in the-emergency organization were completed prior to assignment to those position Availability of off-shift personnel to staff the TSC and OSC following an emergency declaration was tested and verified by means of quarterly call-back drills in which the licensee's call-tree system was activated and personnel were contacted by telephone or page The inspector reviewed documentation for drills conducted on January 12, May 5, and July 28, 1988. Estimated augmentation times met the commitments specified in Figure B-5 of the Emergency Pla No violations or deviations were identifie *

5. Training (82701)

Pursuant to 10 CFR 50.47(b)(2) and (15),

Section IV.F of Appendix E to 10 CFR Part 50, and Section 0 of the licensee's Emergency Plan, this area was inspected to determine whether the licensee's key emergency response personnel were properly trained and understood their emergency responsibilitie The licensee's Emergency Response Training Manual required an annual audit by the Station Emergency Planner to determine currency of specified training for all members of the emergency response organizatio The inspector reviewed documentation of the 1988 audit, conducted *during Jul Several persons whose training was not current, or who had been assigned without benefit of the appropriate training, were removed from the emergency response organizatio Records of training for selected members of the emergency organization were reviewe The training records revealed that those personnel, including some designated as alternates in the emergency organization, were provided with appropriate training, and that the type, amount, and frequency of training were consistent with requirement The inspector conducted a walk-through with a Shift Supervisor on duty in the Control Room. This individual was given various hypothetical sets of emergency conditions and plant data and was asked in each case to talk through the response he would provide as Emergency Coordinator if such an emergency actually existe The individual exhibited considerable familiarity with emergency procedures and equipmen No problems were observed in the areas of emergency classification, protective action decision-making, and notificatio No violations or deviations were identifie. Independent Review/Audits (82701)

Pursuant to 10 CFR 50.47(b)(14)

and 10 CFR 50.54(t), this area was inspected to determine whether the licensee had performed an independent review or audit of the emergency preparedness program, and whether the licensee had a corrective action system for deficiencies and weakness identified during exercise and drill Records of emergency preparedness program audits showed that an independent audit was conducted by the licensee's Quality Assurance Department from December 7, 1987 to April 27, 1988, and was documented in Audit Report No. NP-87-23 (CM), dated May 27, 1988. This audit fulfilled the 12-month frequency requirement for such audit The audit records showed that the State and local government interfaces were evaluate Audit findings and recommendations were presented to station and corporate managemen.

Licensee documentation showed that required critiques were held following periodic drills as well as the annual exercise. The records showed that deficiencies were discussed in the critiques, and recommendations for corrective action were mad The licensee's program for follow-up action on audit, drill, and exercise findings was reviewe Inspection of licensee records indicated that corrective action was taken on identified problems, as appropriate. The licensee had established a system called the Oconee Nuclear Station Commitment Index as a management tool for tracking actions taken to correct deficiencie No violations or deviations were identifie. NRC Information Notices (92717)

The inspector determined that NRC Information Notice No. 87-54, "Emergency Response Exercises," was received by the licensee, reviewed fo applicability, and distributed to cognizant personne The licensee had already implemented the concepts presented in this Information Notice and therefore no action was necessar O8. Exit Interview The inspection scope and results were summarized on August 5, 1988, with those persons indicated in Paragraph 1. Although proprietary information was reviewed during this inspection, none is contained in this report.