SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - SECURITY BASELINE INSPECTION REPORT 05000263/2025402

Dear Shawn Hafen:

On September 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at a reduced staffing levels throughout the duration of the shutdown.

However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300.

On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations. However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 13, 2025, to December 31, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.

No findings or violations of more than minor significance were identified during this inspection.

December 18, 2025

S.Hafen

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000263 License No. DPR-22

Enclosure:

As stated

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2025402

Enterprise Identifier:

I-2025-402-0051

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

September 22, 2025, to September 25, 2025

Inspectors:

G. Bonano, Physical Security Inspector

K. Maloney, Sr Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1)2.01 a, b, d, e, f, g, h, i, k; 2.02 a-c; 2.04 b; 2.06 a, d, f, g, h, i, j, n; 2.08; 2.10 a.

(2) Observed Annual Force on Force exercise on 9/24/2025

71130.09 - Security Plan Changes

Security Plan Changes (1 Sample)

(1)02.01 a-e Since the last NRC baseline inspection of this program area, Security Plan Revision 21 to 22 was implemented. Based on the licensee's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s) continues to meet the requirements of 10 CFR 73.55(b). The inspector(s) conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s). Therefore, the change(s) remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) January 1, 2024, through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 25, 2025, the inspectors presented the security baseline inspection results to Shawn Hafen and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

23

Security Drill & Exercise Drill Records

2/1/2023

24

Security Drill & Exercise Drill Records

2/8/2024

Miscellaneous

25

Partial Security Drill & Exercise Drill Records

FP-S-FSIP-01

Security Compensatory Measures

FP-S-FSIP-05

Security Patrols

FP-S-FSIP-08

Contingency Plan Implementing Procedure

FP-S-FSIP-09

Alarm Response

FP-S-FSIP-12-A

Security System Description and Standards, Attachment A

QF-2418

Responder Timeline Worksheet

71130.05

Procedures

QF2419

Adversary Timeline Worksheet

Activity/Change

AR#:

2000036406

PHYS-SEC-Plan (Physical Security Plan)

L-MT-25-007

Xcel Energy Letter to NRC

Changes to the MNGP Security Plan

03/25/2025

MNGP PSP

Security Plan, Training & Qualification Plan, Safeguards

Contingency Plan, and ISFSI Security Plan

71130.09

Miscellaneous

QF0398

(FP-S-FSIP-17)

Security Change/Activity Screening and Evaluation

71151

Miscellaneous

QF0445

NRC and MOR Data Collection and Submittal Forms

19