IE Insp Rept 50-263/82-06 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Effluent Control Instrumentation,Testing of Air Cleaning Sys & Reactor Coolant Water Quality
ML20054K583
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/07/1982
From: Greger L, Lovendale P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20054K576 List:
References
50-263-82-06, 50-263-82-6, NUDOCS 8207020346
Download: ML20054K583 (7)


Text

. _ _ _ _ _ _ _.

(

-

.

Northern States Power Company

JUN i s 1967.

contains a full statement of the reasons which are the bases for the

.

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely, Original Signed by,J. R. Miljec J. R. Miller, Chief Technical Inspection Branch l

Enclosure:

Inspection Report

No. 50-263/82-06(DETP)

REGION III==

i

i

Report No. 50-263/82-06(DETP)

'

Docket No. 50-263

License No. DPR-22

,

Licensee: Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

Facility Name: Monticello Nuclear Generating Plant

,

!

j

Inspection At: Monticello Site, Monticello, MN

i

f

Inspection Conducted: June 1-4, 1982

db!/7 84

Inspector:

. C. Lo ndale

Date

hY

LC 7~~-

Approved By:

L. R.

reger,. hilf

d'//7/d

2'.

y

'

'

Facilities Radiation

Date

l

Protection Section

!

!

- ;

!

Inspection Summary

!

Inspection on June 1-4,

1982 (Report No. 50-263/82-06(DETP))

'

Areas Inspected: Routine, unannounced inspection of operational radiation

,

protection activities including:

effluent control instrumentation; testing

o' air c1 caning systems; reactor coolant water quality; licensee audits;

,

-

rs :lation protection procedures; radiological qualification and training;

exposure control; and in plant radiation protection program. The inspector

i

!

also reviewed the licensee's actions taken in reponse to previous inspec-

!

tion findings; and two TMI Action Plan items. The inspection involved 36

j

inspector-hours onsite by one NRC inspector.

,

!

Results: No items of noncompliance or deviations were identified.

!

,

F

3.

f

l

,

i

!

L

,

f

I

l

f

<

t

h

.

  • e

w

eg-m>m

  • %y-9

s-9

--r,yw

q,,--y

g

- - -

w

y

p_,.9p,-,9pg

,e

,9.ys.pp.-+ww_.,

%.-

t

,,-y,

,,

,,,y

y

,..p

y-y-u- -,3

m. _

,,mp

-p.,ye

-, --. -.

g.e-gy--eg-%---we

we

.

.

.

.

$

j

DETAILS

l

1.

Persons Contacted

  • W. Shamla, Plant Manager
  • M. Clarity, Plant Superintendent, Engineering and Radiation Protection
  • F.. Fey, Superintendent, Radiation Protection
  • J. Windschill, Lead Health Physicist

G. Mathiasen, Supervisor, Radiological Services

R. Jacobson, Senior Chemist

P. Yurczyk, Radiation Protection Coordinator

J. Peterson, Chemistry Coordinator

,

O. Iverson, Production Engineer

L. Nolan, Lead Chemical Engineer

a

]

  • C. Brown, Senior Resident Inspector. NRC

A. Madison, Resident Inspector, NRC

The inspector also interviewed other licensee employees including

radiation protection specialists.

  • Denotes those present at the exit meeting.

2.

General

,

This inspection, which began with a plant tour and visual observation of

,

facilities and equipment, posting, labeling, and access controls at 7:30

a.m. on June 1,1982, was conducted to examine routine aspects of the

j

radiation protection program during normal operations. During this tour,

the inspector used an NRC survey instrument (Xetec 305-B) to monitor

{

selected areas throughout the plant. Measurements made were in agreement

I

with posted survey data. Area postings, access controls, and housekeeping-

were very good.

Also, the inspector rev*ewed the licensee's noble gas, iodine, and

particulate monitors against NUREG-0737.

3.

Licensee Action on Previous Inspection Findings

(Closed) Item of Noncompliance (263/80-08-01):

A' radioactive waste

shipment cask was not marked " Radioactive - LSA."

Procedure No. 8110

now requires that all stick-on markings and labels be reinforced with

tape to prevent them from falling off during transit. Also, extra

stick-on markings or labels are supplied to the truck driver with

instructions to apply them as needed. No further problems were noted.

(Closed) Open Item (263/81-07-01; 263/80-14-CC):

Licensee actions in

response to IE Circular No. 80-14.

Check valves have been installed on

demineralized water hose stations located on the refueling floor. Also,

warning signs have been posted at each demineralized water hose station.

,

I

No further problems were noted.

.

.

.

(Closed) Item of Noncompliance (263/81-15-01): Failure to follow

radiation protection key control procedure. The responsible technician

was reprimanded and the matter was discussed with the entire technician

staff. No further problems were noted.

(Closed) Open Item (263/81-21-02): Worker drank from a slightly con-

taminated condensate storage tank hose. A warning sign was posted and

training personnel instruct workers to drink from water coolers only.

No further problems were noted.

(Closed) Items of Noncompliance (263/81-22-05; 263/81-22-06;

263/81-22-07): Unauthorized removal of radioactive material from

site and radiation levels in an unrestricted area in excess of

allowable limits. Also, failure to expeditiously retrieve the

caterial.

Procedures concerning radioactive material storage and

control have been revised and management control of such occurrences

has been strengthened. No further problems were noted.

4.

Effluent Control Instrumentation

The inspector reviewed records of effluent monitoring system calibra-

tions and functional tests conducted to meet technical specification

requirements.

Records for 1981 and 1982 to date were reviewed; no

problems were noted.

Grab sample results of plant effluents are compared with monitor

readings in accordance with technical specifications. Good agreement

is normally achieved.

A review of effluent monitor trip and alarm setpoints indicated

compliance with technical specification requirements.

No items of noncompliance or deviations were identified.

5.

Testing of Air Cleaning Systems

In place filter tests were performed on the Standby Gas Treatment

System (SBGTS) in April 1981. Laboratory methyl iodide tests were

performed on the SBGTS charcoal in July 1981. The in place testing

included DOP tests of HEPA filters, and Freon tests of charcoal

adsorbers.

In place tests of both the "A" and "B" trains indicated

greater than 99 percent removal. The laboratory tests (methyl iodide)

of charcoal samples indicated greater than 99 percent removal. These

results meet the limits specified in Technical Specification 3.7.B.2.

Although not required by technical specifications, the stack filters

(HEPA and charcoal) and offgas compressor suction filter are tested

routinely in accordance with approved test procedures.

However,

other installed filter systems such as the radwaste building exhaust

(V-FU-1 and 2) and the reactor building ventilation (V-FU-5) are not

tested in accordance with the recommendations of Regulatory Guide 1.140,

" Design, Testing, and Maintenance Criteria for Normal Ventilation

1

l

l

.

Exhaust System Air Filtration and Absorption Units of Light-Water-

Cooled-Nuclear Power Plants. This matter was discussed during the exit

meeting and will be reviewed during a future inspection.

(263/82-06-01)

No items of noncompliance or deviations were identified.

6.

Reactor Coolant Water Quality

The inspector reviewed selected licensee records to determine compliance

with technical specification requirements for reactor coolant periodic

tests, chemical control, and radioactivity control. Records from CY 1981

to date were reviewed; no problems were noted.

No items of noncompliance or deviations were identified.

7.

Licensee Audits

The inspector reviewed licensee audits of the radiation protection

program and corrective measures for identified problems. The audits

reviewed included an INPO audit conducted in March 1982 and an audit

of radiation protection activities during the 1981 maintenance outage

conducted by the corporate office.

The licensee was responsive to identified problems and corrective

actions appeared effective.

8.

Radiation Protection Procedures

The inspector reviewed changes to the radiation protection procedures

issued in 1981 and 1982 to date. The changes appear to be consistent

with "egulatory requirements and good health physics practices. No

probi.ms were noted.

9.

Radiological Qualification / Training

The inspector reviewed recent changes to the Chemistry and Health

Physics organization. The Lead Chemical Engineer has been trans-

ferred into the Operations Engineering Group. This transfer was

made in order to consolidate all systems engineers into one group.

One radiation protection specialist has been assigned to the training

'

department. At present there are openings for one health physicist

,

and two radiation protection specialists.

Radiationprotectiontrainingforradiationworpersandtheradiation

protection staff remains as previously stated.1

In addition, radiation

protection specialists are receiving plant systems training from the

training department. No problems were noted.

1/

Inspection Report No. 50-263/81-07.

i

.

.

10.

External Exposure Control

The licensee's personal monitoring program remains as previously

described. The inspector selectively reviewed exposure records for

1981 and 1982 to date. No problems were noted.

The licensee spikes ten TLDs each month and then sends them to the

vendor for processing. On the average, the spiked TLDs read ten

percent low, which is nonconservative. The licensee has determined

the cause to be an error in their spiking procedure and is taking

action to correct the problem.

11.

Internal Exposure Control

The licensee's program for control of internal exposures includes

reduction of surface contamination levels and use of engineering

controls, protective clothing and equipment, survey information, and

stay-time calculations. Whole body counting is used to supplement

the routine monitoring program to ensure its effectiveness.

Whole body counting data, respiratory protection training records,

MPC-hour determinations, and air activity surveys from January 1981

to date were reviewed. No exposures greater than the 40 MPC-hour

control measure were indicated.

No items of noncompliance or deviations were identified.

12.

In-Plant Radiation Protection Program

a.

Surveys

The inspector selectively reviewed radiation, contamination, and

airborne radioactivity surveys conducted to meet surveillance re-

quirements and determine radiation work permit requirements. No

problems were noted.

b.

Posting and Access Controls

The inspector reviewed radiation, high radiation, and contamina-

tion area postings within the plant controlled area. All postings

appeared to meet the requirements of 10 CFR 20.203.

c.

Release of Materials for Unrestricted Use

The licensee's procedures for release of materials for unrestricted

use were reviewed.

The licensee does not release materials for

unrestricted use if any detectable activity is found using current

state-of-the-art equipment and methods. Equipment sensitivities are

more restrictive than the minimum sensitivities noted in IE Circular

No. 81-07.

No problems were noted.

No items of noncompliance or deviations were identified.

.

.

13.

Turbine Floor Continuous Air Monitor (CAM)

On the December 2, 1981 night shift, during a maintenance outage, the

turbine building vents were opened to remove welding smoke. The turbine

floor CAM (Eberline PING) was recently installed, but had not been

programmed or calibrated and therefore was not capable of performing its

intended function.

Technical Specification 2.4.4.b requires that a CAM be in operation on

the turbine floor before opening the turbine building roof vents. The

Shift Supervisor was aware the new CAM was running on the turbine floor

and therefore assumed that the technical specification requirement had

been met.

On the morning of December 3, 1981, the error was discovered

by radiation protection personnel. The vent was closed immediately and

the CAM was tagged out of service.

In addition, " secure" tags were

installed on the turbine building vent switches. The tags state that

approval of the Health Physicist is needed before operation of the

turbine building roof vents. Also, the operations requirements section

of the turbine building roof vent procedure was revised to prevent

The licensee's corrective actions appear adequate.

recurrence.

14.

Transportation Activities

The inspector reviewed the licensee's procedures for transportation

of radioactive material. The procedures were current with respect to

burial site criteria and NRC/ DOT regulations. No problems were noted.

Procedures reviewed include:

No. 8075

Revision 4

Procedure for Shipping Radwaste Using

a Model B-2 Cask

No. 8076

Revision 14

Procedure for Shipping Radioactive Waste

Using the CNSI 14-195H Cask

No. 8077

Revision 3

Radioactive Materials Shipment - LSA not

Exceeding Type A Quantity in Exclusive Use

Vehicles

No. 8089

Revision 5

Radioactive Material Shipment - Type A

Quantity, Fissile Exempt

No. 8091

Revision 5

Procedure for Shipping Radwaste to U.S.

Ecology in Washington

No. 8092

Revision 6

Procedure for Shipping Radwaste to Barnwell

The inspector reviewed the licensee's methcd of ensuring that

certificate of compliance maintenance requirements have been met.

The required maintenance is performed by the vendor (cask owner).

Depending on the vendor, a letter is sent to the licensee confirming

that the required maintenance was performed or a sticker is attached

to the packages which indicates that the required maintenance has

been completed. The licensee's procedures require confirmation that

package maintenance has been completed before shipment. No problems

were noted.

-.

-

-

_. -

i

<

o

The inspector selectively reviewed records of shipments made during

i

1981 and 1982 to date. No problems were noted.

No items of noncompliance or deviations were identified.

15.

TMI Action Plan Items II.F.1.1.B.2'and II.F.1.2.B.2

,

i

a.

Noble Gas Effluent Monitor (II.F.1.1.B.2)

i

The licensee has installed four wide range noble gas monitors.

Two monitors sample the offgas stack and two monitors sample

]

the reactor building vent. The monitors readout in the control

!

!

room. Digital readouts of release rate or concentration are

l

provided, as well as an easily read strip chart recorder. The

inspector reviewed the monitor installations for compliance with

NUREG-0737 requirements. No problems were noted. This item is

closed,

r

b.

Sampling and Analysis of Plant Effluents (II.F.1.2.B.2)

,

The sampling rack component of the wide range noble gas monitor

'

contains filter holders and. valves to allow grab sample collec-

tion of particulates and iodines for isotopic analysis in the

laboratory. The inspector reviewed the licensee's sampling

capabilities for compliance with NUREG-0737 requirements. No

problems were noted. This item is closed.

,

16.

Exit Meeting

i

The inspector met with licensee representatives (denoted in Section 1)

at the conclusica of the inspection on June 4, 1982. The inspector

l

summarized'the scope and findings of the inspection.

In response to

certain items discussed by the inspector, the licensee:

i

Stated that the recommendations of Regulatory Guide 1.140 would be

reviewed and compared with present -practices for testing and main--

tenance of air cleaning systems.

(Section 5)