IR 05000263/1974008
| ML20024G222 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/07/1975 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wachter L NORTHERN STATES POWER CO. |
| Shared Package | |
| ML19298E414 | List: |
| References | |
| NUDOCS 9102080361 | |
| Download: ML20024G222 (3) | |
Text
- _ _ -
- --
. - - - -. -
_
-
. _ - _ _
lk { V r)k (f(k
'
.
i i[
UNITtD ST ATIS
,,
,
NUCLEAR REGULATORY COMMISSION
-
DIRECTOR Af t OF REOUL ATORY oPER ATIONS REOlON lli too moostvtL1 moAo CLIN E LLY N, ILLlNol% 60137
.
7 7" Morthern States Power Company Docket No. 50-263 ATrN Mr.14e Wachter Vice President Power Prodaction and System Operation 414 Nicollet Mall Minneapolis, Minnesota 55401 Centlemen:
This refers to the int,iection conducted by Mr. Jaimes H. Joyner of our Region II office on October 23-25, 1974, of activittas at the Monticello Nuclear Cer.erating Plant authorized by NRC License No. DPR-22, and to the discussion of the findings with Messrs. Larson, Anderson, Zerban, McFadden and Ortler of your staff at the conclusion of the inspection.
The area examined during this inspection was your program for protecting
.
against industrial sabotage and safeguarding special nuclear material
" "" l pursuant to applicable provisions of 10 CFR Part 30. "Lisensins of Production and Utilization Pacilitiest Part 73. " Physical Protection of Plants and Materials" and specific requirements of NRC License No. DPR-22.
Within this area, the inspection consisted of selective exatninations of proendures and representative records, interviews with personnel, and i
observations by the inspector.
During this inspection, it yde found that certain of your activities appear to be in t.oncompliance with NRC requirements. The itene and reference to the pertinent requirements are listed in the enclosure to this letter.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practies", Part 2, Title 10, code of Federal Regulations, Section 2.201 requires you to submit to this of fice within twenty days of your receipt of this notice, a written statement or explanation in reply, including (1) corrective steps which have been taken and the results achieved: (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full g
compliance will be achieved. Such a statement or explanation should be provided for each of the items listed and should be submitted as a separate enclosure to your transmittal letter.
osotto,
'
O E
e r
M76 198 9102000361 750207 PDR ADUCK OSOOOD63 G
-
-- - - - - - - - - - - - -
.
.
'
.
.
Northern States Power Company-2-
.Eg y
Areas examined during this inspection concern a subject matter which is
,'
exempt from disclosure according to Section 2.790 of the NCR's " Rules of
./
Practice," Part 2 Title 10, Code of Federal Regulations. Consequently,
,
'
our report of this inspoetion (No. 050-263/74-08), the enclosure to this 1ettur, and your response to the items listed in the enclosure will not l
be placed in the Public Document Room.
Should you have any questions concerning this inspection, we vill be glad to discuss them with you.
Sincerely yours, Caston Fiore111, Chief Operations Branch Enclosure?
As stated above (10 CTR 2.790 Information)
I
....
bec: IE Chief, FS&EB IE Chief, M& PPB IEtEQ (4)
LtD/D for Reactor Projects DR Central Fii n IE Files
-
w/o enc 1 PDR, l PDR, w/o encl Loca l
l
_ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - _.
_ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - - _ - _ _ _ - - _ _ _
- - _ _ _ _ _
_
_ _ _. _ _ _ _ _ _ _.. - - - - - - - -
.
- in.
.
\\, g
.
'
'
Y HUCLEARlr7d[lOTb[dl&MMISSION
'
' Va.? d'
f OrrICE or INSPECTION AND ENTORCCMENT
% ' t l' [
ett'GION lli
'
799 ROOStVELT HOAD GLrN CLLYN. :LLINOl$ 00137 mm%g 010 :56 2t60 A.
IE Inspection Report No. _050-263/74-08 Transmittal Date
- February 7, 1975 Distribution:
Distribution:
,1E Chief, FSLEB IE:HQ (4)
DR Central Files
,
Regulatory Standards (3)
L:D/D for Reactor Projects DR Central Nice Licensing (13)
IE Files RO Files IE Chief, MLPPB B.
RO Inquiry Report No.
Transmittal Date
- ,.
i s'
&
Distribution:
Distribution:
RO Chief, FS&EB RO:UQ (5)
RO Chief, FSLEB K0:HQ DR Central Files DR Central Files Regulatory Standards (3)
RO Files Licensing (13)
RO Files
-
C.
Incident Notification From:
(Licesisee 6 Docke,t No. (or License No.)
Transmittal Date
Distribution:
Distribution:
RO Chief, FS6EB RO:HQ (4)
R0 Chief. FS&EB Licensing (4)
RO:HQ (4)
DR Central Files L:D/D for f uels & !!aterials RO Files DR Central Files
.-
RO Files
.
I
_ _ _ _ _ - _... _ _. _ _