Insp Rept 50-255/85-32 on 851203-860124.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Lers,Ie Bulletins,Open Items,Inservice Insp NDE Activities & Tank Support Structure Repair
ML20151V100
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/05/1986
From: Danielson D, David Jones
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20151V090 List:
References
50-255-85-32, IEB-83-06, IEB-83-6, NUDOCS 8602110199
Download: ML20151V100 (8)


Text

yu -

,

. L
i: , _

- ,y

,' .L'

..U.S. NUCLEAR REGULATORY COMISSION

  • LREGION III

.

y ,,v- ,

Report.No. 50-255/85032(DRS)

,.

JDocket No.~50-255' License.No. DPR-20

'

x Licensee: Consumers Power Company 212 West Michigan Avenue 4 -Jackson; MI 49201'~

,

l Facility'Name: Palisades Nuclear Ge'nerating Plant Inspection At: Palisades site, Covert, MI Inspection Conducted: December 3-5,-17-19, 1985 and January 7-10,'23-24, 1986

. Inspector:

'

9... Jones

.

D/~ pjgs Date

'

NW~

' Approved By: -D. H. Danielson, Chief Materials and Processes Section

,/c/et Date

-

Inspection Summary

' Inspection on December 3-5, 17-19, 1985 and January =7-10, 23-24, 1986 e (Report No. 50-255/85032(DRS))

Areas Inspected: Routine, unannounced inspection of licensee action on'an LER, IE 8ulletin,.Open Items, Inservice Inspection (ISI) NDE activities, (Program, Procedures, 0bservation and Data Review) and the SIRW tank support structure

~

repair. .The inspection involved a total ~of 87. inspector-hours onsite by one NRC inspecto Results: -No violations or deviations were identifie .

.Y,

- ,

R dhk9060205

-

050 3

..

DETAILS

- Persons Contacted Consumers Power Company (CPCo)

J. Lewis,' Plant Yechnical Director

  • D. Fitzgibbon, Licensing Engineer
  • J. Pomeranski, E&F0, Project Superintendent
  • T. Palmisano, Plant Projects Superintendent
  • B..VanWagner, Plant Projects Engineer, ISI K._VandeLinde, Plant Projects Engineer, ISI S.' Wellman, NDT Project Supervisor, L&FTS M. Kirk, Eddy Current Shift Coordinator, L&FTS D. Ziegler, NOT Supervisor, L&FTS
  • J. Buechler,-Section Head, Quality Assurance Construction and Testing

.*R. McCaleb, Palisades QA Director

  • R. Orosz, Engineering / Maintenance Manager
  • T. McElroy, E&F0, Resident Engineer
  • R. Fenech, Technical Engineer
  • Vincent, Plant Safety Engineering Administrator Factory Mutual Engineering R. Riegler, ANII Westinghouse R. Hilterman, Job Coordinator The inspector also contacted-and interviewed other licensee and contractor employee * Denotes those present at the final exit intervie . Licensee Action On LERs (Closed) LER 255/83-06-01: The licensee issued an event report upon discovery of discrepancies between the SIRW tank support structure and as-built documents during an A/E review of the support structur Fourteen three-foot square openings were present in the concrete beams versus nine openings identified on~the as-built documentation. See Paragraph 6 for additional detail . Licensee Action On IE Bulletins (Closed) IE: Bulletin (255/83-06-B8): IE Bulletin 83-06, " Nonconforming Materials Supplied By Tube-Line Corporation." The inspector reviewed the licensee's final response dated November 21, 1983. CPCo identified seventeen stainless steel fittings as being supplied by Tube-Line. Nine

'

.

of the fittings were returned to Tube-Line and eight were installed in the Auxiliary Feedwater Pump Suction Line (AF System), which is safety-related. The installed fittings met the requirements of the original installation code (ANSI B31.1 and ASME Code Case N-7) for replacements, and ASTM A-40 Minor discrepancies concerning the number of fittings and heat codes were noted by the inspector during the review of the licensees final response; however, these were resolved to the satisfaction of the inspecto . Licensee Actio_n_On__ Previous Inspec_ tion Findings (Closed) Open Item (255/83-08-01): Further review of the SIRW tank support structure evaluations will be perforned. See Paragraph 6 for additional detail (Closed) Open Item (?55/83-08-02): Specific procedures for the repair and inspection of Lne openings identified in the SIRW tank are being prepared. See P'.ragraph 6 for additional detail . Inservice Inspretion General Information

~

This is'the first outage'of the second interval. CPCo utilized the services of Consumers Power Laboratory .and Field Technical Services (L&FTS), Combustion Engineering (CE), and Westinghouse (W) to perform the ISI in accordance with ASME Section XI, 1977 Edition, Sumer 1978 Addend Eddy Current examination was performed on steam generators A and B, and the following tubes were plugged in steam generator B:

Line Row Line Row 2 121 64 89 60 97 64 91 60 99 65 88 63 92 66 87 Program Review Consumers Power Company's Centralized Inservice Inspection (ISI)

program was disbande In its place each operating plant ncw has its own independent program for performing the ISI function. The NRC inspector reviewed the Palisades Inservice Inspection Outage Plan 2-1, Revision 2; 1985 Steam Generator Eddy Current Test Outage Plan, Revision 0, and the Program Plan for the 1985 Palisades Steam Generator Tubing Examination, NDT-PP-13, Revision 0. No violations or deviations were identifie F >

. - Procedure Review The inspectnr reviewed the following procedures:

  • CPCo, Magnetic Particle Examination, NDT-MT-03, Revision *- CPCo, Liquid Penetrant Examination, NDT-PT-03,-Revision * CPCo, Ultrasonic Thickness Measurements, NDT-UT-02, Revision * CPCo, Ultrasonic Examination of Ferric, Austenitic Piping and Branch Connection Welds, NDT-UT-03, Revision * ~CPCo, Ultrasonic Examination of Studs, Bolts, and Pins, NDT-VT-07, Revision * CPCo, Visual Examination, NDT-VT-03, Revision * CPCo, Radiographic-Examination of Welds, NDT-RT-03, Revision * CPCo, Steam Generator Inservice Inspection, EM-09-05, Revision 0,
  • .CPCo, Palisades Eddy Current Procedure for Data Flow, EM-09-06, Revision * CPCo, Inservice Inspection, EM-09-03, Revision 3 * CPCo, Eddy Current Examination - 540 F, NDT-ET-02, Revision * CPCo, Eddy Current Examination of Tube / Sleeve Assemblies, NDT-ET-03, Revision 6.

,

'

  • CPCo, Eddy Current Examination of Dent Regions, NDT-ET-04, Revision * CPCo, Eddy Current Base Line Examination of Tube Sleeves, NOT-ET-05, Revision 5.

! * CPCo, Eddy Current Examination - 540 SFW, NDT-ET-07, Revision * CPCo, Eddy Current Examination - 4 C4F, NDT-ET-08, Revision * CPCo, Dent Magnitude Data Evaluation, NDT-G-03, Revision * CPCo, Installation of SM-4, NDT-G-04, Revision * CPCo, Profilometry Examination, NDT-ET-10, Revision * W, Liquid Penetrant Examination, ISI-11, Revision 1 * W, Manual Ultrasonic Examination of Welds in Vessels, ISI-47, Revision 4, Field Change r

.

  • W Preservice'and. Inservice Inspection Documentation, OPS-NSD-101, Revision * W, Magnetic Particle Examinations, ISI-70, Revision * W, Manual Ultrasonic Examination of Welds, ISI-206, Revision * W, Qualification of Ultrasonic Manual Equipment, NSD-ISI-10, Revision * W, Ultrasonic Examination of Studs, Bolts and Nuts, ISI-15, Revision * CE, Ultrasonic Examination Procedures for No. 1 Reactor-Coolant Pump Flywheels, CPCo - 151-012, Revision No violations or deviations were identifie d. Material And Equipment Certifications The inspector reviewed the certification documents, relative to the following items:
  • Eddy Current Calibration Standards and Equipment
  • Ultrasonic Transducers, Equipment, Couplant
  • Magnetic Particle Equipment
  • Radiographic Equipment, Densitometer, Penetrometers
  • Liquid Penetrant Material No violations or deviations were identified, e. NDE Personnel Certifications and Observation cf hori Activities The NRC inspector reviewed NDE personnel certifications, in accordance with SNT-TC-1A, 1975/1980 Editio The NRC inspector also observed the work and had discussions with personnel during the following examination:

Eddy Current Examination of Steam Generator B, Line 5 - Rows 56 and 74, and Line 8 - Rows 65 and 135, in accordance with CPCo Procedure NDT-ET-07, Revision 3, " Eddy Current Examination - 540 SFW."

No violations or deviations were identifie .

_ _

%

~ Review of Data The NRC inspector reviewed selected documents related to'the following-ISI examinations and determined that the applicable

- QA/QC requirements were met:

  • - . Magnetic Particle (MT) Reports
  • Ultrasonic (UT) Reports
  • Radiographic (RT) Reports
  • . Eddy Current (ET) Data No violations or deviations were-identified, Main Steam Piping Radiograph Review The NRC inspector reviewed the radiographic film for the following welds which were examined as a result of the Augmented ISI Program
for the Main Steam Piping performed during 1979, 1981 and 1983

Weld No. (Date of Radiograph)

151-208 (1983) 251-212 (1979, 1981)

' 151-210 (1979, 1981) 251-213 (1979, 1981)

151-211 (1979, 1981) 251-218 (1979, 1981)

151-216 (1979, 1981) 251-219 (1979, 1981)

151-217 (1979, 1981)

No violations or deviations were identifie . Safety Injection And Refueling Water (SIRW) Tank Support Structure Repair General This is a followup of inspections documented in Inspection Reports No. 50-255/83-08, No. 50-255/83-23 and No. 50-255/84-1 These inspections are as a result of LER 83-06, dated February 17, 1983, which documented a discrepancy between the actual configuration and the'as-built design documents for the SIRW tank support structur The SIRW tank cellular foundation slab is located over the Palisades plant control room. Each slab is one foot thick with a four foot space between them (see Figures 1 and 2). The calculated stresses in the foundation exceeded the allowable stresses when calculated in accordance with the Final Safety Analyses Report (FSAR) requirements and American Concrete Institute (ACI) Code 318-63. This' condition resulted from the foundation being constructed with several (14)

penetrations in the concrete beams that had not been accounted for in the original design calculation ,

.

,

.

The repair (see Figures 3 and 4) consisted of filling all eight

. penetrations in the north-south beams with reinforced aggregate-grout mix (Masterflow 713 Grout with Pea Gravel added). The east-west beams are secondary support members, which by analysis, have a negligible effect on the load carrying capacity of the slab system and are not included in the repair program. The repair will bring the stress levels of the foundation slab to within the allowable limits stipulated in the Palisades' FSAR and ACI 318-63 (concrete code) thereby resolving the stress problems in the structur CPCo Engineering and Field Operations (E&FO) was responsible for the repairs with Townsend and Bottom (T&B) performing the civil / structural wor Plan / Procedure Review

.The inspector reviewed the following plan and procedures:

  • 'CPCo, PM&MP, Reinforcing Steel, 8-7.2, Revision * CPCo, PM&MP, Core Drilling, 8-7.6, Revision 0,
  • CPCo, PM&MP, Non-Shrink Grout, 8-7.7, Revision * CPCo, PM&MP, Expansion Anchors, 8-7.5, Revision * CPCo, SIRW Tank-Structural Upgrade Project Plan, Revisian * _T&B, Grout / Aggregate Mix for the SIRW Tank Foundation Upgrade, SP-002, Revision * CPCo, Nuclear Assurance Department Procedures - Major Modifications, Certification of Inspection Personnel, No. B-32, Revisicn No violations or deviations were identified, Equipment Certifications The inspector reviewed the certification documents, relative to the following items:
  • Dial Thermometer
  • Compression Tester
  • Bearing Blocks
  • Cube Molds

l 1.

'

__--__-

[ .' '

.,

  • ~ Micrometer
  • Recording Thermometer No violations or deviations were identifie ~ Per'sonnel Certifications and Observation of Work Activities The NRC inspector reviewed civil inspection personnel certifications in accordance with ANSI N45. .The NRC also observed the work and had discussions with personnel during the following:
  • Core Drilling in Opening 3A
  • Tour of Finished Repair of Opening SD
  • Cylinder Break of Cylinder 005-12 in accordance with CPCo Site Inspection Plan C-003, Revision 2, ". Concrete Cylinder Testing" No violations or deviations were identifie Review of Data The NRC inspector reviewed the following documents and determined that the applicable QA/QC requirements were met:
  • Core Drilling of Penetrations - Report
  • Formwork Testing - Report
  • Inspection of Grout / Aggregate mixing, placing and curing-for the SIRW Tank foundation Upgrade - Report
  • Inspection of Reinforcing Steel - Report
  • Total Moisture Content of' Aggregate - Report
  • Concrete Cylinder Testing - Report No violations or deviations were identifie . Exit Interview The inspector met with site representatives (denoted in Persons Contacted paragraph) at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection noted in this report. The inspector also discussed the likely informational content of the inspection report with regard to documents or. processes reviewed by the

'

inspector during the inspection.- The licensee did not identify any such documents or processes as proprietar _ - _ - - - _ _ _ _ - _ _ _ _ _ - _ _ - _ _ - _ - _ _ _ _ _ - _ _ -