IR 05000255/1979006

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-255/79-06
ML19242B329
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/18/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19242B330 List:
References
NUDOCS 7908080103
Download: ML19242B329 (1)


Text

[>R REG O

'o UNITED STATES

8'

.

3,, ",, (f( %

NUCLEAR REGULATORY COMMISSION

[C

)

E RFGION lli

o,

799 ROOSEVELT ROAD

%.'.As o

GLEN ELLYN, ILLINOIS 60137

...

JUL 181979 Docket No. 50-255 Consumers Power Company ATTN:

Mr. David P. Hoffman, Assistant Nuclear Licensing

-

Administrator 212 West Michigan Avenue Jackson, Michigan 49201 Gentlemen:

Thank you for your letter dated June 27, 1979, informing us of the steps you have taken to correct the noncompliance identified in our letter dated June 6, 1979. Regarding your response to Nonccepliance Item No. 2, procedure HP 2.12, you should ensure that your survey program is adequate to comply with the requirements of 10 CFR 20.201(b).

We will examine your corrective action during a future inspection.

We understand, based on a telephone conversation with Mr. T. Mcek on Ju]" 5, 1979, that procedure HP 2.16 has been revised and appropriv e actions taken to ensure that it is properly implemented.

Your cooperation with us is appreciated.

Sincerely,

-

0 James G. Keppler Director cc:

Mr. J. G. Lewis, Plant Superintendent cc w/ltr dtd 6/27/79:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Calleti, Michigan Public

.

Service Commission Myron C. Cherry, Chicago 1-y n.O j I,;,)

[_ # k /

9 080Sg (

b

,