IR 05000255/1979003

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-255/79-03 on 790122-26.No Noncompliance Noted.Major Areas Inspected:Action Taken to Correct Previous Insp Findings,Progress of Const,Installation & Preoperational Activities to Implement 10CFR73.55
ML19274E133
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/14/1979
From: Creed J, Hind J, Howell C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19274E130 List:
References
50-255-79-03, 50-255-79-3, NUDOCS 7903090395
Download: ML19274E133 (2)


Text

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-255/79-03 Docket No. 50-255 License No. DPR-20 Licensee:

Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 Facility Name:

Palisades Nuclear Power Plant Inspection At: Palisades Site, Covert, MI Inspection Conducted: January 22-26, 1979

Inspectors: /, J. R. Crec 8 // '//

l'.f 2,/g3,fW

"x

,

l v J. C. Howell p C

.b.

DMW 9/.2//7 C. A. Schwan h

42[/ y[79 M

Approved By:

. A.

ind, Chief Safeguards Branch Inspection Summary Inspection on January 22-26, 1979 (Report No. 50-255/79-03)

Areas Inspected: Unannounced inspection regarding:

(a) action taken by the licensee to correct previous inspection findings (IE Report No. 50-255/

78-18); (b) the progress of construction, installation and pre-operational activities being undertaken to implement all provisions of 10 CFR 73.55; (c) implementation of the applicable procedural aspects of 10 CFR 73.55, which became effective May 25, 1977; (d) implementation of the ipproved security plan (revised February 16, 1976) relative to the non-procedural aspects of the security system; and (e) action taken by the licensee as a result of IE Circular 78-17.

Specifically, the inspection covered areas 7903000 375

A ei

e

,,

,

-

.

relative to, security plan and procedures, physical barriers, security

,

organization, access controls, detection aids, testing and maintenance of security equipment, response requirements, communication controls, and records (10 CFR 73.70). The inspection involved 105 hours0.00122 days <br />0.0292 hours <br />1.736111e-4 weeks <br />3.99525e-5 months <br /> onsite by three NRC inspectors.

Results: Of the nine areas specifically inspected, no items of noncom-pliance were identified. Each of the previous inspection findings were corrected and are considered closed.