'o UNITED STATES
,
g NUCLEAR REGULATORY COMMISSION,
c,
.
E REGION 11 Q
[
101 MARIETTA ST., N.W., SUITE 3100
%
o ATLANTA, GEORGIA 30303 s
44***
FEB 101982 Report Nos. 50-250/82-04; 50-251/82-04 Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Licensee:
Florida Power and Light Company 9250 West Flagler Street Miami, FL 33101 Facility Name: Turkey Point 3 and 4 Inspection at:
Homestead, FL Inspection Conducted:
February 1-5, 1982 Date of Last Physical Security Inspection Visit:
November 30 - December 3, 1981 Type of Inspection:
Special Physical Security Inspector:
nh S
/-
h%
9,/GP B. L. Hall, Physical S curity Inspector Date $ighed' L Approved by:
f. f g 2.
s y
D. R. McGuire, Chief, Physical Security Section, Da e ' Signed Technical Inspection Branch, Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Included review of site security operations during the course of a licensee conducted investigation of alleged misconduct by members of the assigned contract security force and other contractor employees.
The inspection involved 40 inspector hours on site by one NRC inspector.
The inspection was begun during a normal shift period; eight inspection hours were accomplished during offshift periods.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.