IR 05000245/1993023
| ML20057D314 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/23/1993 |
| From: | Albert R, Keimig R, Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20057D313 | List: |
| References | |
| 50-245-93-23, 50-336-93-17, 50-423-93-19, NUDOCS 9310040099 | |
| Download: ML20057D314 (6) | |
Text
.
._.
-
l
,
..
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report Nos.: 50-245/93-23: 50-336/93-17: 50-423/93-19 Docket Nos.: 50-245: 50-336: 50-423 License Nos.: DPR-21: DPR-65: NPF-49 Licensee:
Northeast Nuclear Encrev Comoany P.O. Box 270 I
Hartford. Connecticut 06141-0270 i
Facility Name:
Millstone Nuclear Power Station. Units 1. 2 and 3
Inspection At:
Waterford. Connecticut Inspection Conducted:
Aueust 30 - Scotember 2.1993
\\~f
Inspectors:
/
20 93 G. C. Smith, Senior Physical Security Inspector
/ Date 1.e lth
)
O9-20-93
.
R.'J. Albert, pysical Security Inspector Date Approved By:
af.duc >1
9/Z34.7
h. R. Khiinig, Cpef, S feg'uards Sectionivision'of Radiitioj R
/Date Areas Inspected: Management Support and Audits; Protected and Vital Area Physical Barriers, Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages and Vehicles; Alarm Stations and Communications; Testing, Maintenance and Compensatory Measures; and Personnel Training and Qualification.
Resits: The licensee's program was directed toward ensuring public health and safety and was.
in compliance with the NRC requirements in the areas inspected. No safety concerns or violations were identified.
9310040099 930924 PDR ADOCK 05000245 O
.-
'
.
DETAILS
,
1.0 Key Personnel Contacted 1.1 Licensee and Contractor Personnel
!
- P. Weekley, Security Manager, Nonheast Utilities (NU)
- G. Halberg, NU Manager System Security P. Marchese, Senior Security Agent, Nuclear
- P. Anhalt, Security Supervisor - Operations
- D. Atwood, Security Training Supervisor
- E. Strom, Security Instrumentation and Controls (I&C) Supervisor i
- R. Bajorin, Chief of Security, Burns International Security Services (BISS)
- M. Gelinus, Security Supervisor
- S. Strong, Security Supervisor
,
- J. Slaton, Technical Supervisor, BISS
- R. Schmit, District Manager, LISS
- J. Palamieri, Regional Manager, BISS
- B. Gilland, Engineering Specialist M. Klien, Security Supervisor Support
1.2 U.S. Nuclear Regulatone Commission i
P. Swetland, Senior Resident Inspector denotes those present at the exit interview.
- The inspectors also interviewed other licensee and contractor personnel during the inspection.
2.0 Follow-up on a Previously Identified Item i
i 2.1 (Closed) VIO 50-336/92-25-004: Failure to maintain adequate compensatory measures.
The inspectors review of this violation disclosed that it was the result of generic post orders that lacked specificity and poor supervisor oversight of performance.
The inspectors determined through review that post orders have been revised so that each post order is post specific and have been expanded to add more specificity. Supervisors also have been retrained and now visit each post on a more frequent basis and log the visit..
'
2.2 (Closed) IFI 50-245/93-01-01: Weakness in the access control program in understanding the proper method of verifying identities.
The inspectors reviewed the access control identification program and interviewed the Security Technicians who perform this function. There is no longer any weakness in understanding the requirements.
,
2.3 (Closed) URI 50-245/93-01-02: Failure to include the contractor behavioral observation program in the licensee's audit.
The licensee provided information that the audit was satisfactorily completed.
3.0 Management Sunoort and Audits 3.1 Manacement Sunoort
'
Management support for the licensee's physical security program was determined to be consistent with program needs. This determination was based upon the inspectors' review of various aspects of the licensee's program during this inspection as documented in this report.
Security program enhancements made since the last physical security inspection in March 1993 (50-245/93-11; 50-336/93-12 and 50-423/93-19) were as follows:
Alarm stations are staffed by supervisory personnel to improve command
and control.
,
Purchased and implemented Firearms Training Simulator for use in the
training program.
Purchased and put into use a new extra large X-ray machine in the
warehouse.
Redesigned and expanded I&C facilities to include a mechanical shop for
door / field hardware maintenance and added a mechanic to the security i
maintenance staff.
3.2 Audits The inspectors reviewed the report of Audit A24035 of the Safeguards Contingency Plan / Suitability Training and Qualification Plan. The audit was conducted May 26-June 10,1993. The audit was very comprehensive in scope and the results were reported to the appropriate level of management. The audit identified one finding, one unresolved item and two recommendations; none were
4
indicative of programmatic weakness. The inspector verified that appropriate and timely actions were taken to correct the items and _ implement the recommendations.
4.0 Protected and Vital Area Physical Barriers. Detection and Assessment Aids 4.1 frotected Area (PA) Barrier The inspectors conducted a physical inspection of the PA barrier on August 30 and 31,1993. The inspectors determined by observation that the barrier was installed and maintained as described in the NRC-approved physical security plan (the Plan).
4.2 PA Detection Aids The inspectors reviewed documentation of licensee-conducted tests of the PA perimeter intrusion detection aids, reviewed test procedures and inspected the
!
installation of the detection aids. The inspectors determined that the detection aids were installed, maintained and operated as committed to in the Plan.
4.3 Assessment System The inspectors observed the PA perimeter assessment aids and determined that they were installed and operated as committed to in the Plan. The inspectors noted that the video images on the monitors in both alarm stations were very
,
'
good.
4.4 Vital Area (VA) Barriers and Detection Aids The inspectors conducted a physical inspection of VA barriers and detection aids on September 2,1993, and determined by observation that the barriers were installed and maintained as committed to in the Plan.
No deficiencies were noted in the licensee's protected and vital area physical barriers, detection and assessment aids.
5.0 Protected and Vital Area Access Control of Personnel. Packaces and Vehicles i
5.1 Personnel Access Control The inspectors determined that the licensee was exercising positive control over
personnel acccc to the PA and VAs. This determination was based on the following:
,
i
5
,
5.1.1 The inspectors verified that the licensee was implementing a search program for firearms, explosives, incendiary devices and other unauthorized materials as committed to in the Plan. The inspectors observed both plant and visitor personnel access processing during peak and off-peak traffic periods on August 30 and 31,1993. The inspectors
.
also interviewed members of the security force and licensee's security staff and reviewed personnel access procedures.
t 5.1.2 The inspectors determined, by observation, that individuals in the PA displayed their access badges as required.
5.1.3 The inspectors verified that the licensee has escort procedures for visitors into the PA and VAs.
5.2 Packne and Material Access Control t
The inspectors determined that the licensee was exercising positive control over packages and materials that are brought into the PA through the main and secondary access portals. The inspectors reviewed the package and material control procedures and found that they were consistent with commitments in the Plan.
The inspectors also observed package and material processing and
!
'
interviewed members of the security force and the licensee's security staff abou't package and material control procedures.
5.3 Vehicle Access Control The inspectors determined that the licensee properly controls access to and within
-
the PA. The inspectors verified that vehicles are properly processed prior to being allowed to enter the PA. Identification is verified by the Security Officer at the main vehicle access portal.
The procedure is consistent with the
'
commitments in the Plan. On September 1,1993, the inspectors observed vehicle searches and interviewed members of the security force and the licensee's staff
'
about vehicle search procedures.
No deficiencies were noted in the control of personnel, packages and vehicles into the protected and vital areas.
6.0 Alarm Stations and Communications
The inspectors observed the operations of the Central Alarm Station (CAS) and the-Secondary Alarm Station (SAS) and determined that they were maintained and operated as committed to in the Plan. CAS and SAS operators were interviewed by the inspectors j
and found to be knowledgeable of their duties and responsibilities.
'
.
.
..
-
The inspectors verified that the CAS and SAS operators do not perform any operational activities that would interfere with assessment and response functions. The inspectors verified that the licensee has communications with local law enforcement agencies as i
committed to in the Plan.
'
No deficiencies were noted in the licensee's alarm stations or communications.
7.0 Testine. Maintenance and Compensatory Measures i
The inspectors reviewed testing and maintenance records and confirmed that the records committed to in the Plan were on file and readily available for licensee and NRC review.
The Security Department's I&C technicians conduct preventive and corrective l
maintenance on security equipment.
A review of corrective maintenance records i
indicated that repairs were being accomplished in a timely manner.
i The inspectors reviewed the licensee's use of compensatory measures and determined
,
them to be as committed to in the Plan.
No deficiencies were noted in the licensee's testing, maintenance and compensatory m. ssures.
8.0 Security Trainine and Oualification The inspectors reviewed the Training and Qualification records of 20 security officers (armed guards, watchmen and supervisors).
No discrepancies were noted.
The inspectors also observed firearms qualification on the range. The inspectors noted that three of the five officers qualifying experienced misfires with the shotguns. The officers demonstrated proficien*:y in clearing the weapons; however, the inspectors expressed some concern over the frequency of misfires and the general condition of the shotguns.
The licensee agreed to do a review to determine the cause of the misfires and identify appropriate correction action.
9.0 Exit Interview The inspectors met with the licensee representatives indicated in Section 1.0 at the conclusion of the inspection on September 2,1993. At that time, the purpose and scope of the inspection were reviewed and the findings were presented.
The licensee
.
acknowledged the inspection findings.