ML20057D311

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/93-23,50-336/93-17 & 50-423/93-19 on 930830-0902.No Safety Concerns or Violations of Regulatory Requirements Noted
ML20057D311
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/24/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20057D313 List:
References
NUDOCS 9310040095
Download: ML20057D311 (3)


See also: IR 05000245/1993023

Text

~

ym

'

-

,

SE? 2 4 1993

i

Docket Nos. 50-245; 50-336; 50-423

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

'

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

j

SUBJECT:

NRC COMBINED INSPECTION NOS. 50-245/93-23; 50-336/93-17 AND

50-423/93-19

This letter refers to the physical security program inspection conducted by Messrs. G. C. Smith

and R. J. Albert of this office on August 30 - September 2,1993, at Waterford, Connecticut,

of activities authorized by NRC License Nos. DPR-21, DPR-65 and NPF-49 and to the

discussions of our fmdings held with Mrs. P. Weekly and other members of your staff by

Mr. Smith at the conclusion of the inspection.

,

I

Areas examined during the inspection are important to public health and safety and are described

in the NRC Region I inspection report which is enclosed with this letter. The inspection

'

consisted of selective examinations of security procedures and representative records, interviews

with personnel and observations by the inspectors.

I

We found that your physical security program is effective and directed toward assuring public

health and safety. Based on several program enhancements, management support for the

'

program was evident.

No safety concerns or violations of regulatory requirements were

identified.

No response to this letter is required. Your cooperation with us is appreciated.

Sincerely,

OriginalSigned By;

i

James H.Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

l

Division of Radiation Safety

and Safeguards

OFFICIAL RECORD COPY

G: MILL 2317.CIR

September 20,1993

I

I

i

9310040095 930924

i

I

, ,,

~

PDR' ADOCK 05000245

G

PDR

>

\\ m*

>

i

4

,

S!? 2 4 1993

Northeast Nuclear Energy Company

2

Enclosure:

NRC Combined Inspection Report Nos. 50-245/93-23; 50-336/93-17; and

l

50-423/93-19

cc w/ encl:

W. D. Romberg, Vice President - Nuclear, Operations Services

l

S. E. Scace, Vice President, Millstone Station

l

H. F. Haynes, Nuclear Unit Director

G. H. Bouchard, Nuclear Unit Director

F. R. Dacimo, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

J. Solymossy, Director of Quality Services

i

Gerald Garfield, Esquire

l

Nicholas Reynolds, Esquire

l

K. Abraham, PAO (2)

l

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

)

NRC Resident Inspector

State of Connecticut SLO

I

OFFICIAL RECORD COPY

G: MILL 2317.CIR

September 20,1993

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -

.

.

!

.

Northeast Nuclear Energy Company

3

3.g

bec w/ encl:

Region I Docket Room (with concurrences)

,

bec w/enci (VIA E-MAIL):

'

V. McCree, OEDO

D. Jaffe, PM, NRR

,

G. Vissing, PM, NRR

'

V. Rooney, PM, NRR

l

J. Anderson, NRR

J. Stolz, NRR/PD I-4

.

i

.l

r

,

-i

i

>

t

\\

DRSS

RI:DRSS

I:D

S

S

,

ih/ tmh

Albert

.eimig

Joyner

gg

'

1~.

}Bh c'/93

09/@/93

09/%/93

09b3 /93

-

i

i

OFFICIAL RECORD COPY

G: MILL 2317.CIR

September 20,1993

i

l