U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
.
,
Regica I
,
50-245/81-04 Report No.
50-336/81-03 50-245 DPR-21 Docket No.
50-336 License No.
OPR-65 Safeguards Group IV Licensee:
N_ortheast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101 Facility Name: Millstone Nuclear Power Station, Units 1 and 2 Inspection at: Waterford, Connecticut Inspection conducted:
March 2-6, 1981 Date of last Physical Security Inspection:
September 21-26, 1980
-
Type of Inspection:
Routine, Unagnounced, Physical Protection 7d.7k sd dMb /
%/
Inspectors 7 L. M. McKeown, Physical Protection Inspector
'date signed date signed
,
Approved by:
/]
h 7-d. W. Devlin, Chief, Physical Protection
/ddte signed v/Section, Technical Inspection Branch Inspection Summary:
Inspection on March 2-6, 1981 (Combined Inspection Report Numbers 50-245/81-04 and 50-336/81-03)
Areas Inspected:
Included an examination of the Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected and Vitai Areas);
Lighting; Access Controls (Identification, Authorization and Badging); Access Controls (Search); Access Controls (Escorting); Access Controls (Vital Areas);
Alarm Stations; Detection Aids; Assessment Aids; Communications; Cccpensatory Measure's; Power Supply; Response; Locks, Keys and Combinations; Records and Reports. Also, a followup to a previously identified unresolved item and a Immediate Action Letter (IAL 80-28).
The inspection involved 41 inspector-hours onsite by one NRC regional based inspector. The inspection was begun during regular duty hours; 9 inspection hours were performed during off-shift periodr.
Results:
The licensee was found to be in compliance with NRC requirements within the 21 areas examined during this inspection.
~~