p ucoqjo
UNITED STATES
g
NUCLEAR REGULATORY COMMISSION
y,
g
REGION 1
- .;
a[c
631 PARK AVENUE
o,
S
U
KING OF PRUSSIA, PENNsYLVANf".19406
g*****
o
16 APR 1981
Docket Nos. 50-245
N
50-336
g
Northeast Nuclear Energy Company
{
fI k[7
U,.,I
P
ATTN: Mr. W. G. Counsil
,-
Senior Vice President - Nuclear
2'
JUN O 3 i981 > [8
Engineering and Operations
P. O. Box 270
% " gjfgwon
J
Hartford, Connecticut 06101
%
/
.!
Gentlemen:
'C
=T\\]
Subject:
Combined Inspections 50-245/81-04 and 50-336/81-03
This refers to the routine inspection conducted by Ms. L. McKeown of this
office on March 2-6, 1981, at the Millstone Nuclear Power Station, Units 1 and
2, of activities authorized by NRC License Nos. DPR-21 and DPR-65 and to the
discussions of our findings held by Ms. McKeown with Mr. E. C. Farrell of your
staff at the conclusion of the inspection, and to a subsequent telephone
discussion between Mr. J. Devlin of this office and Mr. E. C. Farrell on March
20, 1981.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
l,
Title 10, Code of Federal Regulations, documentation of findings of your
control and accounting procedures for safeguarding special nuclear materials
and your facility security measures for physical protection are deemed to be
commercial or financial information within the meaning of 10 CFR 9.5(a)(4) and
i
shall be subject to disclosure only in accordance with the provisions of 10
,
CFR 9.12; therefore, the enclosed inspection report will not be placed in the
'
Public Document Room and will receive limited distribution.
I
-
\\
I
l
1
l
l
8107200036 810416
PDR ADOCK 05000245
O
l
\\
_-
. _ .
._- --
_.
- _ _
,
_.
. _ .
-,
. -
- --.
.
. - _ .
,
s
~
'
Northeast Nuclear Energy Company
2
13 APR 1981
.
l
No reply to this letter is required; however, should you have any questions
!
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
N
W
mes H. Joyne/ Ch
f, Technical
l
Inspection Branch, Division of
Engineering and Technical Inspection
Enclosure: Combined Office of Inspection and Enforcement Inspection Report
,
Numbers 50-245/81-04 and 50-336/81-03
4
i
cc (w/o encl):
'
,