IR 05000244/1981018
| ML17258A372 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 11/30/1981 |
| From: | Kister H, Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML17258A371 | List: |
| References | |
| 50-244-81-18, NUDOCS 8112160215 | |
| Download: ML17258A372 (4) | |
Text
U. S.
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
50-244/81-18 Docket No.
50-244 License No.
DPR-18 Priority Category C
Licensee:
Rochester Gas and Electric Cor oration 89 East Avenue Rochester New York 14649 Facility Name:
R.
E. Ginna Nuclear Pow'er Plant Meeting at:
Ontario, New York Meeting conducted:
September 10, 1981 NRC Personnel.
P.
Zimmerman, Senior Resident Inspector dat signed Approved by:
H.
B. Keister, Chief, Reactor Projects Section 1C, Projects Branch No.
1, DRPI dat signed Meetin on Se tember
1981 Re ort No. 50-244/81-18
~Sco e:
Special, announced management meeting to discuss the results of the Region I board convened to evaluate the licensee's performance from July 1, 1980 to June 30, 1981, as part of the NRC's.SALP program.
Areas addressed included:
Plant Operations; Refueling Operations; Maintenance; Surveillance and Inservice Testing; Personnel Training and Plant Procedures; Fire Protection and Housekeeping; Design Changes and Modifications; Radiation Protection, Radioactive Waste Management, and Transportation; Environmental Protection; Emergency Preparedness; Security and Safeguards; Audits, Reviews, and Committee Activities; Administration, gA and Records, Corrective Actions and Reporting.
Results:
A summary of the licensee performance evaluation was presented.
8ii2ib02i5 8ii204 PDR ADOCK 05000244 PDR
'll
DETAILS 1.
Licensee Attendees J. Maier, Vice President, Electric and Steam Production L. Lang, Superintendent of Nuclear Production R. Mecredy, Manager of Nuclear Engineering B. Snow, Plant Superintendent, R.
E. Ginna J.
Noon, Assistant Plant Superintendent, R.
E. Ginna 2.
NRC Attendees R.
C. Haynes, Regional Administrator, Region I R.
P. Snaider, Licensing Project Manager, NRR H.B. Kister, Chief, Reactor Projects Section 1C, Division of Resident and Project Inspection R.
P.
Zimmerman, Senior Resident Inspector, R.
E. Ginna 3.
Discussion A brief summary of the Systematic Appraisal of Licensee Performance (SALP) Program was presented to explain the basis and purpose of the evaluation.
The NRC Region I evaluation board meeting was discussed, including the appraisal period, performance data and the results of the board's evaluation.
The, SALP Cycle 2 evaluation report will be issued and distributed subsequent to NRC management's approval of SALP program changes which implement the Commission's guidance of October 20, 1981.
This guidance is documented in NRC report NUREG-0834,
"NRC Licensee Assessments."
a