IE Safeguards Insp Rept 50-244/81-05 on 810209-13.No Noncompliance Noted.Major Areas Inspected:Security Plan, Security Program Audit,Security Organization & Alarm Stations.Details Withheld (Ref 10CFR2.790)
ML20003E718
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/03/1981
From: Devlin J, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20003E716 List:
References
50-244-81-05, 50-244-81-5, NUDOCS 8104100124
Download: ML20003E718 (1)


Text

_

U. S. NUCLEAR REGULATCRY COMMISSION 0FFICE OF-INSPECTION AND ENFORCEMENT'

g

.

REGION I'

Report No.

50-244/81-05 Docket No.

50-244 License No.

DPR-18 Safeguards Group'

IV Licensee:

Rochester Gas ani Electric Corporation 89 East Avenue Rochester, New York 14649 Facility Name:

R. E. Ginna fluclear Power Plant Inspection At:

Ontario, New York Inspection Conducted:

February 9-13, 1981 Date of Last Physical Security Inspection July 6-11, 1980 Type of Inspection:

Routine, Unannounced, Physical Protection MT2,mv Inspectors [:R. H.8 Lad 0n, Physical Security Inspector

^ date-date

^

date

!

/

l i

Approved

/ Jades ~W. Devlin, Chief, Physical Protection

' #8

.

/ Se'ction, Technical Inspection Cranch

'

!

Insoection Summary:

Inspection on February 9-13, 1981 (Report No. 50-244/81-05)

Areas Inspected: Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Area); Lighting; Access Control (Identification, Authorization' and Badging): Access Control (Search); Access Control (Escorting); Access Control -(Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing 'and c:dintenance; Compen-satory "leasures; Power Supply; Response; Locks, Keys and Combinations; and Records and Reports.

Follow-up on a previously identified item of noncompliance.

The inspection involved thirty (30) inspector-hours onsite by one NRC Regional based inspector.

The inspection was initiated during nonregular hours; three (3) inspection hours were conducted during off shift periods.

Results:

Ti.e licensee was found to be in compliance with NRC requirements in all twenty (20) areas enmined.