IE Insp Rept 50-244/79-11 on 790723-27 & 0731-0803. Noncompliance Noted:Failure to Retain Required Number of Security Guards & Television Monitors & Failure to Maintain Radio Communications.Details Withheld (Ref 10CFR2.790)
ML17249A514
Person / Time
Site: Ginna 
Issue date: 10/17/1979
From: Devlin J, Evan Jones, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17249A512 List:
References
50-244-79-11, NUDOCS 8001290011
Download: ML17249A514 (4)


Text

U.

S.

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

II P

. ~g-gdd 79-11 Docket No.

50-244 License No.

DPR-18 Licensee:

Rochester Gas and Electric Cor oration Safeguards Group C-4 89 East Avenue Rochester, New York 14649 Facility Name:

R.

E.

Ginna Nuclear Power Plant Inspection At:

Ontario, New York Inspection Conducted:

July 23-27 and July

-. August 3, 1979 Date of Last Physical Security Inspection Visit:

November 13-16, 1978 Type of Inspection:

Unannounced Physical Security Inspection Inspectors:

E.

1;J. Jones, Ph s

al Se'curity Inspector M. Madden, Physical Security Inspector dat /4)

c7 7 //7g date Approved by: /

J 1f. Devlin, Chief, Physical Security and Investigation Section, Safeguards Branch Ins ection Summar date

I"

2 I

Pl,d I

9 Security Organization, Physical Barriers (Protected and Vital Areas), Lighting, Access Control (Identification, Authorization and Badging; Search; Escorting; and Vital Areas),'larm Station, Detection Aids, Assessment Aids, Communications, Testing and Maintenance, Compensatory Measures, Power Supply, Response, Lacks-Keys and Combinations, and Records and Reports.

The inspection involved 100 inspector hours on site by two NRC Regional based inspectors.

The inspection was begun during a regular shift period; 16 inspec-tion hours were accomplished during off-shift periods.

Pegion I Form 167 August 19/9)

8001890 Q

A

Ins ection Summar

~

~

~

~

Results:

The licensee was found to be in compliance with NRC requirements within the 20 areas examined during the inspection except for the following 3 items.

1.

Security Organization

- On several occasions during tray, June and July the required number of armed guards were not on duty (Infraction 79-11-01).

2..

Communications - Continuous radio commun'ications is not being maintained between the CAS/SAS and other members of the security force.

(Infraction 79-11-02)

3.

Assessment Aids - There are 6 fewer TV monitors than required (Deficiency 79-11-03).