IR 05000244/1979001

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-244/79-01 on 790109-12.Noncompliance Noted: Failure to Perform Survey as Required by 10CFR20.201 & Failure to Furnish Rept of Exposure to Radiation & Radioactive Matls
ML17244A449
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/02/1979
From: Crocker H, Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17244A445 List:
References
50-244-79-01, 50-244-79-1, NUDOCS 7904090258
Download: ML17244A449 (24)


Text

U.S.

NUCLEAR REGULATORY'OMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I

4 R. ~db-444 yb-di Docket Ho.

50-244 License Ho.

DPR-18 Priority Category C

Licensee:

Rochester Gas and Electric Com any 89 East Avenue Rochester, New York Facility Name:

Inspection at:

Ontario, New York P

w P

Inspection onducted:

January 9-12, 1979 Inspectors:. -n G.

P. Y)has, Radiation Specialist-3)- 7 date signed date signed Approved by:

,H.

W. Crocker, Acting Chief, Radiation Support Section, FF Im MS Branch date signed d te signed Ins ection Summar

Ins ection on Januar 9-12, 1979 Re ort No. 50-244 79-01

~AI d:

1, dd

by

ib dd

1 the radiation protection program duiing operations including:

exposure controls; instruments and equipment; surveys; notifications and reports; and followup on previous inspection findings.

Upon arrival at 6:00 a.m., January 9, 1979, several areas were examined to review implementation of radiation;safety practices and procedures.

This inspection involved 36 inspector-hours on site by one NRC regional based inspector.

Results:

Of the four areas inspected, no items of noncompliance were identified in two areas; two apparent items of noncompliance were identified in one area (Infraction-failure to perform a survey as required by 10 CFR 20.201(b)

as necessary to comply with 10 CFR 20.103, Infraction - failure to perform a survey as required by 10 CFR 201(b)

as necessary to comply with 10 CFR 20.101, Paragraph 5).: and one apparent of noncompliance was identified in another area, (Deficiency - failure to rnish a report of exposure to radiation and radioactive materials as required by

CFR 20.409, Paragraph 6).

7 90<og 025F

~

~

DETAILS Persons 'Contacted

  • L. S.

L'ang, Superintendent of Nuclear Production

  • B. A. Snow, Station Superintendent
  • J. C. Noon, Assistant Superintendent
  • E. L. DeMerritt, Supervisor, Chemistry and Health Physics
  • B. R. guinn, Health Physicist
  • D. Filkins, Senior Chemist
  • R. Watts, Technical Assistant, Health Physics
  • denotes those present at the exit interview on January 12, 1979.

Licensee Action on Previous Ins ection Findin s (Closed)

Previously Identified Item (50-244/77-22-02):

The licensee has taken those actions specified in IE Circular No. 76-03, "Radi-ation Exposures in Reactor Cavities."

The inspector reviewed procedure RF-14.1.1, Revision 3,

"Thimble Retraction Procedure for Plant Refueling."

The inspector discussed the need for continued vigilance in this area of exposure control with licensee representatives.

(Closed)

Noncompliance (50-244/77-02-02):

Failure to barricade a

high radiation area near the reactor coolant filter handling area in the Auxiliary Building.

The inspector toured the Auxiliary Building on January 11, 1979 making independent measurements to verify compliance with the requirements of Technical Specification 6.13 "High Radiation Area."

All high radiation areas were properly posted and access was being controlled in accordance with the above requirement.

(Closed)

Noncompliance (50-244/78-03-03):

Failure to adhere to procedure HP-6. 2 "Posting of Contaminated and Airborne Area. "

During tours of the Auxiliary Building, the inspector verified that alj areas with smearable contamination in excess of 10,000 dpm/100 cm were posted in accordance with procedural requirements.

Failure to adhere to procedure A-l.1,

"Locked Radiation Areas."

On January 9, 1979, the inspector audited the high radiation area key control program against procedural requirements.

All keys were present or accounted for and the log book was being properly maintaine (Closed)

Noncompliance (50-244/78-03-12):

Failure to post a radiation area located near the Upper Radwaste Storage Area in accordance with the requirements of 10 CFR 20.203(b).

During tours of the facility, the inspector verified that the Upper Radwaste Storage Area was locked, properly posted, and that the dose rate at the perimeter fence was less than 2.5 mrem/hr.

Radiation Work Permit Number 15 has been prepared to insure a resurvey of the area after each movement of material.

(Closed)

Noncompliance (50-244/77-06-01):

Failure to perform beta radiation surveys in.the steam generators.

Procedure M-43.2, Revision 6, "Initial, Radiological Survey" has been developed and implemented to insure adequate surveys are performed when the primary side of the steam generators are opened.

3. ~EC t

a ~

The inspector reviewed the exposure records of 20 individuals selected at random from the licensee's exposure control records.

These records were reviewed against the following requirements:

AREA Re ulator Re uirement Dosimetry

CFR 20.202, HP-l.l, "Issuing Per-sonnel Dosimeters" External Exposure Internal Exposure Exposure Records

CFR 20.101, HP-1.2, "External Exposure Limits"

CFR 20.103

CFR 20.401, HP-1.3, "External Exposure Records,"

HP-3.2, "In-Plant Reporting of Current Exposure"

~

~

I

~

~

b.

The inspector reviewed the licensee's method of neutron moni-toring and dose accountability.

The licensee has required the use of NTA film when the potential for neutron dose exists.

In addition, the licensee performs neutron surveys with a calibrated Eberline PNR-4 neutron 'dose rate'nstrument.

These survey results combined with staytime information are used to calculate th potential neutron exposure.

The dose cal-culated from PNR-4 data is then recorded in the individuals's exposure record.

Procedure HP-1;6, "Neutron Exposure,"

provides the. details of this method.

In 1977, the licensee representative estimates about

individuals were monitored for neutron exposure.

In 1978, about 50 individuals were monitored for neutron exposure.

About five man-rem of neutron exposure are received per year.

A review of neutron dose records for November 1978 indicates 23 individuals were monitored.

The total neutron exposure received was 2.1 rem.

One task performed 'in-.the containment at power, ('SWP.1657-4)

resulted in 1182 mrem of calculated neutron dose.

In the performance of this task three indi-viduals received a neutron dose of slightl'y greater than 300 mrem in the fourth calendar quarter.

The largest cum-mulative neutron dose for an individual was 340 mrem.

The inspector reviewed the guidance of Regulatory Guide 8.14,

"Personnel Neutron Oosimeters," with the licensee representatives.

These representatives stated that there is an active program to define the neutron energy spectrum present in the containment at power.

This information will be used to select a neutron dosimeter that meets the per-formance requirements specified in the regulatory guide.

4.

Instruments and E ui ment The inspector reviewed the availability and calibration of the licensee's radiation survey instruments.

The instruments listed below were selected from those in use, or available for use.

The operability and response to known intensities of radiation was demonstrated by the licensee representative for each instru-men ~ II

Instrument Serial Number Eberline PIC6A Eberline PIC6A Eber line PIC6A Jordan Rad Gun Jordan Rad Gun Eberline RO-1 Eberline E500B Eberline PAC 4S Teletector Xtex 1438 1611 1612 2234 2282 169 698 2355 48534

All the above instruments were properly labeled indicating their calibration date

~

All responded acceptably to a

known source of radiation except the Jordan Rad Guns.

These over responded to the known intensity of radiation and were removed from service by the licensee representative.

The inspector reviewed calibration data for several gamma and one neutron survey instruments.

The Final Safety Analysis Report (FSAR) states in Section 11,

"Waste Disposal and Radiation Protection System," that,

"Survey instruments are calibrated quarterly."

The record review indicates that gamma survey instruments are being calibrated semi-annually and neutron survey instruments are calibrated annually.

Procedure HP-7.1, "Calibration of Gamma Survey Instruments

- Low Range" and HP-7.1 "Calibration of Gamma Survey Instruments - High Range" both state,

"Calibration frequency to be every six months, or the instrument must be taken out of service."

Procedure HP-7.4,

"Calibration of Neutron Survey Instruments" states,

"Calibration.

frequency to be annual or the instrument will be tagged out of service."

.

A review of the calibration history for the Teletector gamma survey instruments indicates these instruments were tagged out due to a malfunction on average of three times per year.

The instruments required recalibration at a frequency of somewhat less than six months.

Other instruments such as the PNR-4 neutron survey meter have had no indications of malfunction or deterioration in calibration from year to yea Radiation survey instruments are an integral part of the radiation protection program.

While some survey instruments are durable and maintain calibration, others are fragile and require more frequent calibrations.

The inspector discussed this matter with licensee representatives.

The durability of other radiation survey instruments will be reivewed in a subsequent, inspection.

(50-244/79-01-01).

In reviewing the calibration and maintenance history for survey instrumentation it was noted that the instrument malfunction tags were not being completed according to procedure HP-7.6,

"Tagging of, Instruments Requiring Calibration or Maintenance. "

Of 40 tags reviewed 7 had a signature and date indicated when the instrument was returned to service.

This same finding has been made by licensee Audit No. 78-43 performed December 5-6, 1978.

The licensee has taken appropriate action to insure this procedure is followed.

The inspector did not observe any tags improperly completed after December 12, 1978.

/

A review of records associated with the laboratory counting equip-ment indicates for the December 1978, the requirements specified in procedure HP-10.1, "guality Control of Counting Systems" have been met.

Ten self reading pocked dosimeters were selected from those in use at the entrance to the controlled area.

This selection included five 0-200 mr and five 0-500 mr dosimeters.

In addition, five 0-1R and three 0-10R dosimeters were selected from those intended for use during the upcoming outage.

Each dosimeter was inspected for physical damage and the records of radiation response reviewed.

Procedure HP-7.5,

"Pocket Dosimeter/Accuracy and Leak Test" requires each dosimeter be tested every six months and that test data be maintained on the "Pocket Dosimeter Test Record."

This record was not available for. the three 0-10R dosimeters.

The licensee representative stated the record had been completed but could not be located and that the 0-10R dosimeters had not been used.

The licensee representative stated the 0-10R dosimeters will be retested prior to use.

The licensee uses a vendor supplied whole body counter.

This equipment is operated by the licensee's staff in accordance with procedure HP-2,2,

"Whole Body Count Operation."

A review of reports supplied by the vendor indicates adequate quality control and calibration of this equipmen ~i

~

~

During tours of the facility the inspector noted that there appears to be adequate supplies of protective clothing and other materials necessary for implementation of the radiation protection program.

No item, of 'noncompliance.was identified in this area.

5.

~Surve s

a.

Licensee seal.ed radioactive sources must be leak tested every six months, inventoried yearly, and records maintained, as required by Technical Specifications and procedure HP-8.4,

"Radioactive Source Inventory."

Records indicate the inventory has been performed and all sealed sources were leak tested as required during 1978.

b.

A review of 1978 survey records indicates that whole body dose rate surveys are being performed as required in proce-dure HP-5.1,

"Area Radiation Surveys."

The inspector and a

licensee representative toured the controlled'area perimeter making independent measurements to verify;>previous survey results.

c ~

On September 15, 1978, a complete neutron survey was per-..

formed outside'the containment.with 'the reactor, at-fulli power..

The'aximum.contact neutron dose rate as measured with a PNR-4 was located near the equipment hatch.

This contact reading of 15 mrem/hr produced a maximum whole body dose of 1.5 mrem/hr.

CFR 20.201(b),

"Surveys," requires that such surveys be conducted as may be necessary to comply with the regulations contained in each section of Part 20.

A "survey," as defined in Paragraph 20.201(a),

means

"an evaluation of the radiation hazards incident to production, use, release, disposal, or presence of radioactive materials or-other sources of radi-ation under a specific set of conditions.

When appropriate, such evaluation includes a physical survey of the location of materials and equipment, and measurements of levels of radiation or concentrations of radioactive materials present.'"

On April 3,'978, Special Work Permit (SWP)

No.

383 was initiated for contractor supplied individuals to "clean and lubricate Incore Thimble Tubes."

This task performed according to procedure M-52.3, "Incore Thimble Cleaning" involved flushing the tube with demineralized water, removal of the by air pressure, vacuum-drying of the thimble bore, and lubrication of the entire thimbl'e bore length.

The procedure required a

SWP and observation of normal health physics precautions.

SWP No.

383 did not require measurement of the airborne radioactive materials present or respiratory protection for the workers.

Individuals worked for about five hours under this SWP.

On April 4, 1978 SWP 413 was prepared for continuation of this job.

No air sample or respiratory protection was required.

Individuals worked for about

hours under this SWP.

One individual was sprayed with fluid from the thimble cleaning operation.

He attempted to decontam-inate himself prior to informing the health physics staff.

He had already washed his moustache several times before the health physics collected a nasal smear.

This smear indicated 1.9 x 10-~ uCi of gross activity.

SWP 444 was issued at 7:00 a.m. April 5, 1978 to complete the thimble cleaning and lubrication job.

This SWP did not require a measurement of the concentration of airborne radioactive material present or respiratory protection devices for the workers.

When the workers completed the cleaning and imbrication of the thimble tubes, they decontaminated the seal table using acetone to remove the residual contamination caused in the cleaning operation.

CFR 20. 103(a)(3),

"Exposure of individuals to concentra-tions of radioactive materials in air in restricted areas,"

requires that the licensee use suitable measurements of con-centrations of radioactive materials in air for detecting and evaluating airborne radioactivity in restricted areas.

According to the workers interviewed, discussions with the health physics staff, and from a review of records provided by the licensee, no contamination survey of the seal table was made prior to initiation of the decontamination, in addition, no measurement of the concentration of radioactive material present in the wor kers breathing zone was made during the acetone decontaminatio The inspector discussed seal table decontamination with the contract workers involved.

These individuals indicated that the use of acetone for decontamination in this process had been known to result in concentrations of radioactive material in air.

Failure to perform measurements of the concentration of radio-active materials in air represents an item of noncompliance with 10 CFR 20.1'03(a) (3) '50-244/79-01-02).

After completing the seal table decontamination, the workers left the controlled area.

One.individual (A) stated that he alarmed the frisker when surveying his face and hair.

The health physics staff had the individual shower with soap and water.

A survey record indicates no contamination in excess of 100 counts per minute as measured with a "end window gm" after this shower.

Three workers were given initial whole body counts prior to start of work, and the completion of work on April 5, 1978.

This information is presented below:

WHOL'E BODY COUNT'DATA Individual A

Initial Count Date 4/2/78 At 1630 POTASSIUM GRAMS =

96.167

+ OR - 37.852 AT 2-SIGMA, G K/KG =

COBALT 60, NCI =

49.607

+ OR -

2.891 AT 2-SIGMA, X MPBB =

COBALT 58, NCI =

75.976

+

OR -

3.431 AT 2-SIGMA, A MPBB =

CESUIM 137, NCI =

MASKED BY OTHER RADIONUCLIDES 1.325 4.510 2.620 First Count After Work 4/5/78 At 1130 (7.80 MIN. COUNT)

POTASSIUM, GRAMS COBALT 60, NCI COBALT 58, NCI CESIUM 137, NCI CHROMIUM 51, NCI MASKED BY COBALT 60 992.361

+ OR - 10.385 AT 2-SIGMA, I 798.506

+

OR - 10.802 AT 2-SIGMA,

%

MASKED BY OTHER RADIONUCLIDES

= 2955.458

+ OR -101.789 AT 2-SIGMA, X

MPBB =

MPBB =

90.215 27.535 MPBB =

4.926 Recount Prior To Leaving Site 4/5/78 At 1300 (7.80 MIN. COUNT)

POTASSUIM, GRAMS COBALT 60, NCI COBALT 58, NCI CESIUM 137s NCI CHROMIUM 51, NCI MASKED BY COBALT 60 821.971

+ OR - 9.483 AT 2-SIGMA, X

639.071

+ OR - 9.752 AT 2-SIGMA, I MASKED BY OTHER RADIONUCLIDES 2681.344

+

RO -88.920 AT 2-SIGMA,

'X MPBB =

MPBB =

MPBB =

74.725-22.037 4.469

Initial Count Individual B

4/2/78 At 1700 (7.80 MIN. COUNT)

POTASSIUM GRAMS =

161'389

+ OR - 38.015 AT 2-SIGMA, G K/KG =

1.779 COBALT 60, NCI =

33.347

+ OR -

2.648 AT 2-SIGMA, 5 MPBB =

3.032 COBALT 58, NCI =

53.972

+ OR -

3.120 AT 2-SIGMA, X MPBB =

1.861 CESIUM 137, NCI =

6.681

+ OR -

3.384 AT 2-SIGMA, X MPBB =

0.022 Count After Work POTASSIUM, GRAMS =

COBALT 60 NCI'=

COBALT 58, NCI =

CESIUM 137, NCI =

CHROMIUM 51, NCI =

4/5/78 AT 1411 (7.82 MIN. COUNT)

MASKED BY COBALT 60 259.943

+

OR -

5.692 AT 2-SIGMA, I MPBB =

23.631 236.115

+

OR -

6.068 AT 2-SIGMA, X MPBB =

8.142 MASKED BY OTHER RADIONUCLIDES 981.348 + OR 55.754 AT 2-SIGMA, I MPBB =

1.636 Individual C

Initial Count 4/2/78 At 1645 (7.82 MIN. COUNT)

POTASSIUM, GRAMS =

169.635

+ OR - 34.088 AT 2-SIGMA, G K/KG =

1.870 CESIUM 137, NCI =

3.328 + OR -

2.311 AT 2-SIGMA, X MPBB =

0.011 Count After Work 4/5/78 At 1206 (7.82 MIN. COUNT)

POTASSIUM, GRAMS =

COBALT 60, NCI =

COBALT 58, NCI =

CESIUM 137, NCI =

CHROMIUM 51, NCI =

MASKED BY COBALT 60 300.675

+ OR -

6.023 AT 2-SIGMA, I MPBB =

257.880

+ OR -

6.350 AT 2-SIGMA, X MPBB =

MASKED BY OTHER RADIONUCLIDES 1051.081

+ OR - 60.802 AT 2-SIGMA, X MPBB =

27.334 8.892 1.752 The licensee representative stated that the radioactivity measured by the whole body counts on April 5, 1978 was due to external contamination.

Survey records do not indicate the location or distribution of this radioactive material on the workers body.

Failure to conduct an evaluation of skin dose resulting from the radioactive material, assumed by the licensee to be external contamination, on the body of workers as necessary to comply with the regulations contained in 10 CFR 20.101, represents an item of noncompliance with 10 CFR 20.201(b)

(50-244/79-01-03).

i

Individuals A and B were given whole body counts on April 21, 1978 on their arrival at a different licensed facility.

The results of these whole body counts are noted below.

WHOLE BODY COUNT DATA Individual A Date 4/21/78 At 1128 (7.90 MIN COUNT)

POTASSIUM, GRAMS =

159.268

+

OR - 38.084 AT 2-SIGMA, G K/KG =

2 ~ 195 COBALT 60, NCI =

13.525

+ OR -

2.303 AT 2-SIGMA,

% MPBB =

1.230 COBALT 58 NCI =

5.816

+ OR -

2.142 AT 2-SIGMA,

'X MPBB =

0.201 CESIUM 137, NCI =

10.163

+

OR -

2.501 AT 2-SIGMA,

'5 MPBB =

0.034 Individual B

4/21/78 At 1103 (7.88 MIN. COUNT)

POTASSIUM, GRAMS =

170.835

+ OR - 38.799 AT 2-SIGMA, G K/KG =

1.931 COBALT 60, NCI =

10.591

+ OR 2.322 AT 2-SIGMA, X MPBB =

0.963 COBALT 58 NCI =

6 282 + OR 2 076 AT 2 SIGMA

/o MPBB =

21 7 CESIUM 137, NCI =

9.569

+ OR -

2.515 AT 2-SIGMA, X MPBB'

0.032 From a review of the whole body count data, it appears that the radioactivity measured in or on the bodies of the workers.

at the conclusion of the work on April 5, 1978, is not indic-ative of a lrhng disposition.

At the conclusion of the inspection, and in a subsequent telephone call on January 19, 1979, the inspector was informed that the licensee is performing additional evaluation of this matter in an effort to better define the dose consequences to these individuals.

6..

Notifications and Re orts The inspector reviewed the exposure records of 10 individuals who had terminated their work assignments at the facility during 1978.

These records were reviewed to establish compliance with the require-ments specified in 10 CFR 20.408 and

CFR 20.409.

The licensee's response to 10 requests by workers for their radi-ation exposure history were reviewed to determine compliance with the requirements of 10 CFR 19.13(b)(c).

I

10 CFR 20.409(b), "Notification and reports to individuals," states that:

"When a li:censee is required pursuant to 20.405 or 20.408 to report to the Commission any exposure of an individual to radi-ation or radioactive material.,

the licensee shall also notify the individual.

Such notice shall be transmitted at a time not later than the transmittal to the Commission, and shall comply with the provisions of 19.13(a) of this chapter."

CFR 19.13(a)

states, in part:

"The information reported shall include data and results obtained pursuant to Commission regulations, orders or license conditions, as shown in records maintained by the licensee pursuant to Commission regulations."

These reports dated June 6, 1978 for individuals A and C, and

.June 16, 1978 for individual B did not include data or the results of the whole body counts performed on April 5, 1978.

These reports did not include skin or extremity dose information.

The exposure information contained in these reports only included whole body dose from gamma radiati'on.

Failure to provide a report that included all the information specified in.l0 CFR 19.13(a)

represents an item of noncompliance with 10 CFR 20.409 (50-244/79-01-04).

7.

Exit Interview The inspector met with licensee representatives (denoted in Para-graph 1) at the conclusion of the inspection on January 12, 1979 and by telephone on January 19, 1979.

The inspector summarized the scope and findings of the inspection as presented in this repor I