DRS Input to Integrated Report 50-237/05-008 and 50-249/05-008
ML061450149
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/06/2005
From: Steven Orth
NRC/RGN-III
To: Ring M
NRC/RGN-III
References
FOIA/PA-2006-0130
Download: ML061450149 (1)


Text

AVER REG, UNITED STATES I-

+ 0 NUCLEAR REGULATORY COMMISSION LISLE, ILLINOIS 60532-5)Cf/O MEMORANDUM TO: Mark Ring, Chief Projects Branch 1 Division of Reactor Projects FROM: Steven K. Orth, Program n ge (TIL)

Plant Support Team Division of Reactor Safety SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 DRS INPUT TO INTEGRATED REPORT 50-237/05-08; 50-249/05-08 Attached is the report input for Dresden Nuclear Power Station Integrated Inspection Report 50-237/05-08; 50-249/05-08. Specifically, this input provides the results of a one-week onsite inspection of the licensee's radioactive gaseous and liquid effluent treatment and monitoring program under the public radiation safety cornerstone, and verification of the associated performance indicator. I have reviewed this input and have determined it is ready for distribution to the licensee and dissemination to the publi The following inspection procedure sample size and module completion status information was input by our inspector into the RPS system on May 4, 2005, for this inspection effort:

  • IP 71122.01, ten samples completed (inspection module completed).
  • IP 71151, one sample completed in the Public Radiation Safety Cornerston Attachment: Input to Inspection Report 50-237/05-08; 50-249/05-08 CONTACT: Wayne Slawinski, DRS (630) 829-9820 DOCUMENT NAME: G:DRS\Dresde to Rpt 05-08.WJS To tceive a copy of this document. Indicate In the box: IC' a Cop OFFICE Rill Rill NAME WSlawinski:tr yA , . SOrtl DATE - 05/4/05 V L 0