IR 05000237/1988027
| ML17201M288 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 01/10/1989 |
| From: | Funk D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML17201M287 | List: |
| References | |
| 50-237-88-27, 50-249-88-28, IEIN-87-011, IEIN-87-11, IEIN-88-041, IEIN-88-049, IEIN-88-41, IEIN-88-49, NUDOCS 8901180396 | |
| Download: ML17201M288 (2) | |
Text
\\
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-237/88027(DRSS); 50-249/88028(DRSS)
Docket Nos. 50-237; 50-249 Licensee:
Commonwealth Edison Company P. 0. Box 767 Chicago, IL 60690 Licenses No. DPR-19; DPR-25
- Facility Name:
Dresden Nuclear Power Station, Units 2*and 3 Inspection At:
Dresden Site, Morris, Illinois Inspection Conducted:
December 5-9, 1988 Onsite December 10-20, 1988 In-office RIII Type of Inspection:
Unannounced, routine physical security inspection and allegation review Date of Previous Inspection: June 28-30, 1988
______,, ~~f."g~*
Inspectors:=-
J.-/---=*-,--=--=----,..-~-=--~/-~~~
Donald E. Funk, J Approved By:
Physical Security Inspector Inspector ames R. Creed, Chief Safeguards Section Inspection Summary t/~/81 Date Date Inspection on December 5-20, 1988 (Reports No. 50-237/88027(DRSS);
50-249/88028(DRSS))
Areas Inspected:
Management Support, Security Program Plans, and Audits; Protected and Vital Area Physical Barriers, Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages and Vehicles; Alarm Stations and Communications; Power Supply; Testing, Maintenance, and Compensatory Measures; and Security Training/Qualification; licensee actions 8901180~9A 890111
~DR AD6t~ 05000237 u
i*'L:ii::.
Enclosu1*e Conta inr:::
...... '
SAFEGUARDS INFORr*,~1.,,T!CYJ Upon Separation Th:s
Page IS Dscont: ~~.l'-'-'
- on previous inspection findings and Information Notices (IN) 87-11, 88-41 and 88-4 A review of an allegation received by Region III regarding Security officers working excessive overtime was include Results:
The licensee was found to be in compliance with NRC requirements*
within the areas examine The allegation was substantiated and the li~ensee committed to comply with the NRC guidelines for overtime concerning the guard force. *The Security Program was well managed and was receiving adequate corporate and plant suppor (Details - Unclassified Safeguards Information)
Enclosure Contains Upon Separation This Page ;s Decontrolled